HomeMy WebLinkAbout20221523 Ver 1_ePCN Application_20221031DWR
Division of Water Resources
Initial Review
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
April 13, 2022 Ver 4.3
Has this project met the requirements for acceptance in to the review process?*
Yes
No
Is this project a public transportation project?*
Yes No
Change only if needed.
Pre -Filing Meeting Date Request was submitted on:
9/27/2022
BIMS # Assigned* Version#*
20221523 1
Is a payment required for this project?*
No payment required
Fee received
Fee needed - send electronic notification
Reviewing Office*
Asheville Regional Office - (828) 296-4500
Information for Initial Review
la. Name of project:
Evert Bulkhead
la. Who is the Primary Contact?*
Emma Joyner
What amout is owed?*
$240.00
$570.00
Select Project Reviewer*
Amy Annino:eads\amannino
1 b. Primary Contact Email:* lc. Primary Contact Phone:*
ejoyner45@gmail.com (717)798-0710
Date Submitted
10/31/2022
Nearest Body of Water
Toxaway River (Lake Toxaway)
Basin
Savannah
Water Classification
B; Tr
Site Coordinates
Latitude:
32.127651
A. Processing Information
County (or Counties) where the project is located:
Transylvania
Is this a NCDMS Project
Yes No
Is this project a public transportation project? *
Yes No
Longitude:
-82.952298
la. Type(s) of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?*
Yes
No
1 b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
lc. Has the NWP or GP number been verified by the Corps?
Yes No
Nationwide Permit (NWP) Number: 03 - Maintenance
NWP Numbers (for multiple NWPS):
ld. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular
Non-404 Jurisdictional General Permit
Individual 401 Water Quality Certification
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1f. Is this an after -the -fact permit application?*
Yes No
lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1 h. Is the project located in any of NC's twenty coastal counties?
Yes No
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
ld. Who is applying for the permit?
Owner Applicant (other than owner)
le. Is there an Agent/Consultant for this project?*
Yes No
2. Owner Information
2a. Name(s) on recorded deed:
Robert Evert
2b. Deed book and page no.:
01037 and 0476
2c. Contact Person:
2d. Address
Street Address
545 Maclay Lane
Address Line 2
City
Tallahassee
Postal /Zip Code
32312
401 Water Quality Certification - Express
Riparian Buffer Authorization
State / Province / Region
Florida
Country
United States
Yes No
Yes No
2e. Telephone Number: 2f. Fax Number:
(850)567-4951
2g. Email Address: *
rkevert@gmail.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
lc. Nearest municipality / town:
Lake Toxaway
2. Project Identification
2a. Property Identification Number:
8512846925000
2b. Property size:
0.55
2c. Project Address
Street Address
218 Red Bird Circle
Address Line 2
City State / Province / Region
Lake Toxaway North Carolina
Postal / Zip Code Country
28747 United States
3. Surface Waters
3a. Name of the nearest body of water to proposed project: *
Toxaway River (Lake Toxaway)
3b. Water Resources Classification of nearest receiving water: *
B; Tr
3c. What river basin(s) is your project located in?*
Savannah
3d. Please provide the 12-digit HUC in which the project is located.
030601010101
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: *
Single family residential home, with a maintained lawn and existing failing masonry bulkhead (sea wall).
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? *
Yes No Unknown
4f. List the total estimated acreage of all existing wetlands on the property:
4g. List the total estimated linear feet of all existing streams on the property:
4h. Explain the purpose of the proposed project: *
Replace existing bulkhead (sea wall) that is starting to fail.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: *
Job site to be secured with construction fencing at open side boundaries
The existing wood dock is to be removed
Coffer Dam (precast concrete & waterproof liner) to be placed approximately 4 ft beyond the existing bulkhead/seawall, and 4 to 8 ft beyond at the two -side property boundaries. An
excavator placed on the shore will be used.
With coffer dam and waterproofing in place, the water is to be pump out with use of skimmer (Faircloth style) to draw from water surface. Water will be pumped back into the lake.
Once the coffer dam basin has been drained and general water seal confirmed, the existing bulkhead/seawall is to be removed by an excavator
With the existing bulkhead/seawall and any foundation removed, the area is to be excavated to 6-12" below bottom of new bulkhead.
A non -woven filter fabric will be placed in the excavated trench, and 6-12" of #57 stone base —6 ft wide is to be placed as the new foundation
Pre -cast (Redi-Rock style) blocks are to be placed by an excavator above the new stone foundation. All blocks to be leveled and plumbed.
The top course of pre -cast block will stop —4" below the standard lake surface
The final 3 ft of bulkhead wall will consist of natural boulders (500-1,500 lbs) and a natural stone cap
The non -woven filter fabric will be laid against the exposed earthen bank and the new bulkhead wall will be backfilled with #57 stone
The filter fabric will be cut off or laid under the stone cap top course
A rip rap or river rock protection mat (attempt to re -use existing rock) will be placed on the lake floor at the base of the new bulkhead wall
Water will be allowed to re -flood the work area
the coffer dam is to be removed by the excavator
A new dock is to be constructed of similar size as the existing
All fencing is to be removed and the area above the new bulkhead wall is to be re -landscaped with natural rocks and indigenous vegetation. Grasses within the first 4 ft of the new wall are
to be avoided
Job Complete
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
Yes
Comments:
No Unknown
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
6. Future Project Plans
6a. Is this a phased project?*
Yes No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
la. Where are the impacts associated with your project? (check all that apply):
Wetlands
Open Waters
4. Open Water Impacts
Streams -tributaries
Pond Construction
Buffers
4a. Site #
4a1. Impact Reason
4b. Impact type
4c. Name of waterbody
4d. Activity type
4e. Waterbodytype
4f. Impact area
Bulkhead 1
Shore Stabilization
T
Lake Toxaway
Bulkheads
Lake
0.01
4g. Total temporary open water Impacts:
0.01
4g. Total open water impacts:
0.01
4h. Comments:
E. Impact Justification and Mitigation
4g. Total permanent open water impacts:
0.00
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
This project is to replace a failing sea wall. The existing wall has begun to settle and separate and looks to be leaning under the pressure of the soils
retained. If this wall is not repaired/replaced, it will eventually collapse into the lake and release the soils retained behind it. The new wall will be placed
on an adequate stone foundation and will use a 60" broad concrete base layer to better distribute the weight of the wall to the earth. #57 stone backfill is
being used to allow ground water to slowly pass thru the wall and enter the lake. A filter fabric is being used to separate the retained earth from the #57
drainage stone and minimize passage of sediment.
lb. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
A temporary cofferdam is being utilized to allow the work to be accomplished 'in the dry. A skimmer (Faircloth style) is being used to allow sediment to
drop to the bottom of the work basin. This draws cleanest water from the surface. In addition, a precast concrete wall design is being used to accelerate
the project schedule and minimize the time during which the construction site is exposed severe weather.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
If no, explain why:
Based off the NC Riparian Buffer Protection rules, the work being completed is not within the protect riparian buffer areas.
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? *
Yes No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
Yes No
Comments:
G. Supplementary Information
1. Environmental Documentation
la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? *
Yes No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)?*
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
Yes No
3b. If you answered "no," provide a short narrative description.
Project is replacing an already existing bulkhead. No additional development is being done.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
Yes No N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
Yes No
5d. Is another Federal agency involved?*
Yes
5e. Is this a DOT project located within Division's 1-8?
Yes No
No Unknown
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
Yes No
5g. Does this project involve bridge maintenance or removal?
Yes No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
Yes No
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
Yes No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
DEQ
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
Yes No
Are there submerged aquatic vegetation (SAV) around the project vicinity?*
Yes
No Unknown
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? *
DEQ
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
http://gis.ncdcr.gov/hpoweb/
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
Yes No
8b. If yes, explain how project meets FEMA requirements:
Certification of no -rise impact by professional engineer
8c. What source(s) did you use to make the floodplain determination?*
FEMA and https://msc.fema.gov/portal/search
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
22-425 - 218 Red Bird Circle.pdf 2.43MB
File must be PDF or KMZ
Comments
Signature
By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
I intend to electronically sign and submit the PCN form.
Full Name:
Emma Joyner
Signature
Date
10/31/2022
-.. N
-.._.
—
,..
LiW
N
O
ELC
J
J
p
N
N
N
�o
z N
Vi
< cn
CO
C J
y
X
J �
5 �
Q�
a=
SNOIDONOO ONIISIXN-Sb-
LbL8z DN`Sems u Owl- KD P!u ml z[£
aoamaaefdag I1nM vS - P-gP[InH
W
z �
N
IN
N
SNOdIONO3 OISOdON
esS aXe7
p?H R1I ZL£LtrL8ZDN"Ca
1-m-jdag 08M 8mS- pwq-jInH
,
PQ
8.=oam
t--
map^`=$
I
lNq �m�w5m
� S8 cR3ry a9
'
V
Z
�
8 g
8 @�� aB�EA
e98E E 8 gm
da TSB 8 � 8°
m s
Io Ug€ss
L
gL Yp se°i @
9
$8w
3
a�
�sw e60v
gggxg6 t
E
@v
C�
pow