Loading...
HomeMy WebLinkAbout20141126 Ver 1_Email_20141215Wanucha, Dave From: Euliss, Amy Sent: Monday, December 15, 2014 3:11 PM To: Wanucha, Dave; John T Thomas JR SAW Cc: Blanton, William A; Harmon, Beth Subject: RE: W -5209F - Structure Question Attachments: 404 and 401 permits for W5209F Forsyth.pdf, 20141215_W5209F_Permit Package.pdf Dave, Please keep the revised drawings for your file. I don't think we need to revise the 401, since permanent impact totals haven't changed. Let me know if you have any questions. From: Euliss, Amy Sent: Wednesday, December 10, 2014 6:28 PM To: Wanucha, Dave; John T Thomas JR SAW Subject: Fwd: W -5209F - Structure Question Make that 9 additional feet not four. I send along a revised plan when I receive it. Begin forwarded message: From: "Cail, William G" <gcail @ncdot.gov> Date: December 10, 2014 at 4:01:13 PM EST To: "Euliss, Amy" <aeuliss @ncdot.gov >, "Blanton, William A" <wablanton @ncdot.gov> Subject: RE: W -5209F - Structure Question Disregard prior email and "rev" permit. Evidently I was not using Structures correct extension numbers. It will be about 9' additional ...... another permit is on the way. From: Euliss, Amy Sent: Tuesday, December 09, 2014 8:00 AM To: Cail, William G; Blanton, William A Subject: RE: W -5209F - Structure Question Okay. I'll also need a statement as to why Structures needs the additional 10' of culvert that I can include inmy modification request. I'll have to submit a modification request which can take upto6O days. -Amy From: Cai[ William G Sent: Tuesday, December 09, 2014 7:46 AV To: Blanton, William A; Eu|iss Amy Subject: FVV: VV-52O9F- Structure Question Guessthismeanstheyvehfied --'soundsUkevveUneedtomodifypermit Will be about 1Yadditional of box. From: Davenport, Donald Sent: Monday December 08, 20147:30 AM To: [ai|, William G Subject: RE: W-5209F - Structure Question Galen, That's what it looks like tous. Andre From: Cai[ William G Sent: Wednesday, December 03, 2014 7:18 AM To: Davenport, Donald Subject:FW: W-52O9F- Structure Question Wanted to check on Structures determined length of culvert extension. Structures determined length is about 1O'longer. I am fine if we need to lengthen, we'll just likely have to update permit impacts. Can you verify? From: Blanton William Sent: Tuesday, December 02, 2014 2:00 PM To: [ai|, William G Subject: VV-52O9F- Structure Question Galen, Hope you had a good Thanksgiving. VVe finally received the structure plans for this one and noticed a slight variance between Hydn/srendition. There is always some difference, but in this case the length of culvert is approximately 10' longer in the structure plans (which affects 10' more of stream). | know the permit and everything associated with itis based on the original layout. What doyou recommend? | haven't spoken with Amy yet; | wanted to check with you first. Please refer tothe attachment: red lines are original and purple lines are new (minus wing vxa||s). Thanks, Al smallomrr*qwna*ncwm and nnmmImeona*,immuNwommww o puumpZcon:JmI mw and may u*aimmmwammIrdpmmwm