Loading...
HomeMy WebLinkAbout20141276 Ver 1_Stormwater Management Report_20141211 (4)WITHERS & RAVENEL STORMWATER MANAGEMENT REPORT HOWARD /EMERSON TRACT - COMMERCIAL Cary, North Carolina Prepared For: NORTHWEST COMMUNITY CHURCH 7712 CARPENTER FIRE STATION RD CARY NC 27519 ATTN: MR. JOEL CARPENTER Prepared By: WITHERS & RAVENEL, INC 115 MacKenan Drive Cary, North Carolina 27511 Revised October 2014 W &R Project No. 02130427 "w1 frr � N CAR"', ,,• F S�jQ•.•r to. Z. Iq Jennifer C. Diaz, PE Clay Parrish, El HOWARD /EMERSON TRACT NORTHWEST COMMUNUNITY CHURCH - COMMERCIAL STORMWATER MANAGEMENT REPORT CARY, NORTH CAROLINA INTRODUCTION The proposed Howard /Emerson Tract development is located southwest of the intersection of Morrisville Parkway and White Oak Church Road in Cary, NC. The 20.07 acre development is proposed as a church with associated parking and infrastructure. It is less than 24% and is therefore considered low density. The site in its existing conditions is approximately 80% wooded with some open space and impervious area. The site is bound by White Oak Church Road to west, Morrisville Parkway to the north and the American Tobacco Trail to the east — all of which are higher than the site. The site drains towards the center and is collected via an unregulated stream feature which exits the site along the southern boundary. The site is comprised of HSG "D" soils. A soils map is provided in the Background Data portion of this report. Site outlined in blue. The impacts of the increased runoff from the development will be mitigated with a wet pond. The BMP will be oversized in order to accommodate future development. Although the proposed development is low density, the proposed BMP and storm drain network are designed to capture the proposed impervious area to the maximum extent practical in anticipation that future development would increase impervious area above 24% thereby making the site high density in the future. STORMWATER MANAGEMENT REQUIREMENTS The proposed development is with the Jordan Lake, Lower New Hope watershed. The site must therefore meet Town requirements relating to town wide ordinances and policies for stormwater NWCC - Commercial 1 W &R Project 02130427 Stormwater Management Plan Revised October 2014 HOWARD /EMERSON TRACT NORTHWEST COMMUNUNITY CHURCH - COMMERCIAL STORMWATER MANAGEMENT REPORT CARY, NORTH CAROLINA compliance. To meet these requirements the Nitrogen export rates from the site are to be reduced to 4.4 lbs /ac /yr; Phosphorus export rates to 0.78 lbs /ac /yr. This is accomplished through the use of a wet pond. Additionally, peak flows at the point of analysis shall be reduced to predevelopment levels for the 1 -year storm and larger storms must also be controlled to within the anticipated flows from R -40 zoning or 1o% of predevelopment flows, whichever is less. METHODOLOGY The stormwater study was conducted using the natural drainage features as depicted by LIDAR topography and existing field surveys. Proposed drainage areas were based on field survey data and proposed development within the drainage areas. The scope of work included the following analyses: Hydrology ❑ Simulation of the 1 -year, 2 -year, 5 -year, 10 -year, and loo -year rainfall events for the Cary, NC area ❑ Formulation of the 1 -year, 2 -year, 5 -year, 10 -year, and loo -year flood hydrographs for the pre- and post- development drainage areas Hydraulic ❑ Routing the 1 -year, 2 -year, 5 -year, so -year, predevelopment runoff from the site. ❑ Routing the 1 -year, 2 -year, 5 -year, 10 -year, and development runoff through the stormwater BMP. ❑ Analyzing results at the analysis point and soo -year flood hydrographs for soo -year flood hydrographs for post- The results of the hydrology calculations are used in the hydraulic analyses. The hydraulic design requires the development of stage- storage and stage- discharge functions for the BMP. The rainfall /runoff hydrographs, stage- storage, and stage- discharge functions have been compiled to create a computer routing simulation model using Bentley Systems PondPack v1o.o software. This PondPack model was then used to assess the peak water surface elevations in the BMP forthe design rainfall events. The PondPack modeling results are provided as appendices to this report. HYDROLOGY The SCS Method, in conjunction with NOAA Atlas 14 rainfall data for Raleigh- Durham International Airport, was used to develop runoff hydrographs for the storm events. This method requires three basic parameters: a curve number (CN), time of concentration (tc), and drainage area. Curve numbers were based on soil type and land use. Soil types were delineated from the Soil Survey of Wake County, North Carolina (November 1970). The curve numbers used in this study are listed in the PondPack section of this report. Time of concentration for pre- and post- development drainage areas were developed using the TR -55 method. A minimum time of concentration of 5 minutes was used for the proposed piped drainage systems. NWCC - Commercial 2 W &R Project 02130427 Stormwater Management Plan Revised October 2014 HOWARD /EMERSON TRACT NORTHWEST COMMUNUNITY CHURCH - COMMERCIAL STORMWATER MANAGEMENT REPORT CARY, NORTH CAROLINA HYDRAULICS Computer simulated reservoir routing of the 1 -year, 2 -year, 5 -year, io -year, and loo -year design storms utilized stage- storage and stage- discharge functions. Stage- storage functions were derived from the proposed geometry of the BMP. A non - linear regression relation for surface area versus elevation was derived for each BMP. This relation estimates the incremental volume of the basin to the stage or elevation of the basin. Stage- discharge functions were developed to size the proposed outlet structures for the BMP. NITROGEN EXPORT The Nitrogen and Phosphorus export rates for the development were calculated using Jordan/ Falls Lake Stormwater Nutrient Load Accounting Tool. All onsite drainage areas, including roadway and driveway improvements, were used in the nutrient export analysis. The worksheet used to calculate the nutrient export loading rate can be found in the appendices. CONCLUSIONS Quality Based upon the routing study, the proposed stormwater management plan has sufficient measures to provide the necessary removal of nutrients as required by Town policy. The proposed stormwater wet pond has been designed to store and treat the water quality volume (runoff associated with the first 1" of rainfall, WQv) generated by the contributing drainage area, and draw down that volume in at least z days, but no slower than 5 days. Because the runoff resulting from the first i" of rainfall is being discharged perthe NCDENR standards for a wet pond, the appropriate reduction credits were taken for the area draining through the BMP. The BMP treatment resulted in bringingthe total site's Nitrogen and Phosphorus export down to below target levels. Quantity The peak flows from the site have been attenuated for predevelopment levels. Furthermore, the proposed BMP has sufficient storage to safely pass the loo -year storm event without overtopping. Future Expansion The proposed SWMP and BMP have been designed with possible future development in mind. The BMP has been sized to accommodate an additional 2.5 acres of impervious area for both water quality and quantity control. This analysis of future impervious assumes that all of it drains to the BMP without additional bypass. Although this SWMP and BMP have accounted for future impervious area in this study, any expansion to the site will still be subject to Town of Cary standards at the time of site plan submittal. NWCC - Commercial 3 W &R Project 02130427 Stormwater Management Plan Revised October 2014 HOWARD /EMERSON TRACT NORTHWEST COMMUNUNITY CHURCH - COMMERCIAL STORMWATER MANAGEMENT REPORT CARY, NORTH CAROLINA DESIGN SUMMARY BMP #1 - WET POND DRAINAGE AREA =16.10 ACRES PERCENT IMPERVIOUS AREA = 44% (INCLUDES OFFSITE AND FUTURE DEVELOPMENT) • 2.5" DRAWDOWN ORIFICE AT EL 351.0 • 2 -3' WIDE PEAK CONTROL WEIRS AT EL = 352.5 5'x5' RISER, CREST EL = 353.5 36" 0 -RING RCP OUTLET EL = 344.00 Top OF DAM EL = 356.00 BMP #1- Wet Pond Routing Summary Storm Event Peak Water Surface Elevation Freeboard Qpeak Outflow (total) (ft) (ft) (cfs) 1 -Year 353.30 2.70 13.17 2 -Year 353.70 2.30 27.88 5 -Year 354.03 1.97 50.28 10 -Year 354.20 1.8o 64.3 loo -Year 354.51 1.49 90.54 PEAK ATTENUATION SUMMARY NWCC - Commercial 4 W &R Project 02130427 Stormwater Management Plan Revised October 2014 Pre Development Post Development Net Change Net Change Peak Flow Peak Flow w /BMP (cfs) NO Storm Event (cfs) (cfs) 1 -Year 35.91 17.45 -18.46 -51% 2 -Year 52.36 36.24 -16.12 -31% 5 -Year 71.30 64.62 -6.68 -9% 10 -Year 86.36 84.33 -2.03 -2% loo -Year 125.04 119.24 -5.8o -5% NWCC - Commercial 4 W &R Project 02130427 Stormwater Management Plan Revised October 2014 HOWARD /EMERSON TRACT NORTHWEST COMMUNUNITY CHURCH - COMMERCIAL STORMWATER MANAGEMENT REPORT CARY, NORTH CAROLINA BACKGROUND INFORMATION NWCC - Commercial W &R Project 02130427 Stormwater Management Plan Revised October 2014 35° 47 41" N 35° 47 23" N 3 Hydrologic Soil Group —Wake County, North Carolina 3 (NWCC - Commercial) N m m 687430 697450 687550 6976.10 687670 687730 68877% 687430 667490 687550 687610 687670 3 Map Scale: 1:2,600 if printed on A portrait (8.5" x 11 ") sheet. N — ,Meters n 0 35 70 140 210 0 100 200 400 600 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 U Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 687730 687790 3 m 35" 47 41" N M m R O M M O R O N M O M mR N M N M O M n N M O n N M 7/8/2014 Page 1 of 3 35° 47 23'N M 0 f0 U L 0 0 Z C •N 7 2 O p) U E Y E O O U IU 0 ' � S Z 0 U) U O O T Z O F- 0 O LL Z Ca C 0 Z W 0 W J a d C C m N o N o N p� > N o U N .O f/7 O .' U f0 Q L O N p O m > ` N N U �� f0 a f0 E N N 3c o o a U O C V V a Cp Q) (0 0 L N O N ❑ U U N N 0 N 7 C O U fOUA N U E U) N N cD E � R d N 13 LL CL 7 *y N N � Y OI• C U 7 cm o� U N N O y� O 3 � CD .N U f0 U In N L N U O IO E N L O U N f0 N TM C Q N > 0 U M O O C '^ E m �p N Cn y N U) Z U U N Z L a) Z U N O a� U E N L a) cn E 0 1 Lil m t N o t ;" c ' (C IC Q r f0 L N 1] Q t N U) Z CD a. ❑ ❑ a¢ C N N IC N C Z 0 U l91 r C O T U 0 N N N O r fLA O ' N C 7 0 N l0 C• V f0 N w E C r 7 r O N L f0 Q E �" N L L C O 0 O N � nL _O 7 N t •O l0 O N O U p N Q L N� O >, Cj, C C N O N f0 U L N N V) 0 0 p_ p — Z O _O U L Y E N L- N E M l0 J U) N Q C C N > E E cD 0 IC > L Z �' L `� Q U N N l0 m 0 N 0 f0 M E c C w T� �L d N� O)N f0 E O.LM TC O L� C N Q O T N U Co M '� L N M z❑ 0 0- M> p o m 'o o m ) U L 3 c m m Y'i Q m t r- Q- U) N W U Np �" E V) N 0 E C 7 C 7 p N j O l9 o M C 7 '` E L 0 C U w ,O U 0 '� 0 cn O` y 7 T � N L� 2+ .Q rn f0 O N N N IO l0 > L p N C 7 Q .� Q N U) N — Z E� — N O N f0 N E l�0 E O C .N N '0 W E A N N N d E p 0 0 (/) U M O N L_ Q Q U L y H O U) U) V) O ❑ N O E H U .- O a� La La > N o U T L 0 a m m m 0 r a f0 E m o o a �° a ❑ U U N Q N 9 r 'w ❑ Z in O= N 5 V) Z) U < � R d N 13 LL CL 7 *y C U 7 cm 3 � m N O C O C O N O rn O N O a� N a o M 0 a. ❑ 0 0 0 C ❑ ❑ ❑ o a. ❑ ❑ a¢ m< m'o U L) in Z c¢ a m m L) ❑ Z 0¢ a m m n 0[1 F1 11 11� t/ 9 H a� •0 V) o Vl i l a .o fn a UY Hydrologic Soil Group —Wake County, North Carolina Hydrologic Soil Group NWCC - Commercial Hydrologic Soil Group— Summary by Map Unit— Wake County, North Carolina (NC183) Map unit symbol Map unit name Rating Acres in AOI I Percent of AOI CrB Creedmoor sandy loam, D 2 to 6 percent slopes CrB2 Creedmoor sandy loam, D 2 to 6 percent slopes, moderately eroded CrC Creedmoor sandy loam, D 6 to 10 percent slopes CrC2 Creedmoor sandy loam, D 6 to 10 percent slopes, moderately eroded CrE Creedmoor sandy loam, D 10 to 20 percent slopes WyA Worsham sandy loam, 0 D to 3 percent slopes Totals for Area of Interest Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie -break Rule: Higher 0.2 7.7 0.2 9.7 Iff 1.1 20.1 1.1% 38.4% 1.1% 48.3% 5.5% 5.7% 100.0% USDA Natural Resources Web Soil Survey 7/8/2014 Conservation Service National Cooperative Soil Survey Page 3 of 3 HOWARD /EMERSON TRACT NORTHWEST COMMUNUNITY CHURCH - COMMERCIAL STORMWATER MANAGEMENT REPORT CARY, NORTH CAROLINA BMP SIZING CALCULATIONS NWCC - Commercial W &R Project 02130427 Stormwater Management Plan Revised October 2014 Project Name: Howard /Eemerson Tract - Commercial City /State: Cary, NC BMP #1 Project #: 2130427 Date: 1- Oct -14 Table 10.3 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 90% Pollutant Removal Efficiency in the Piedmont % Impervious Permanent Pool Depth 3.0 4.0 5.0 6.0 (feet) 7.0 8.0 9.0 10 0.9 0.8 0.6 0.5 0.5 0.4 0.4 20 1.5 1.1 1.0 0.9 0.8 0.7 0.7 30 1.9 1.7 1.4 1.3 1.0 0.9 0.9 40 2.5 2.0 1.8 1.6 1.5 1.2 1.1 50 3.0 2.5 2.0 1.9 1.7 1.5 1.5 60 3.5 2.8 2.5 2.2 1.9 1.8 1.7 70 4.0 3.3 2.8 2.5 2.2 2.0 1.9 80 4.5 3.8 3.3 2.8 2.6 2.1 2.0 90 5.0 4.0 3.5 3.0 2.8 2.5 2.4 Source: NCDENP/DWQ Stormwater Best Management Practices, pg. 10 -15, July 2007 rev. 6/16/09 STORMWATER BMP #1- STORMWATER WET POND (25% TN Removal) Land Use Area (ac) % IA Imp. Area (ac) Impervious 3.44 100 3.44 Open Space 8.36 0 0.00 Future Impervious 2.50 100 2.50 OFFSITE impervious 1 1.80 1 60 1.08 Totals 1 16.10 1 1 7.02 Total % Impervious Surface Area = 43.6 % Surface Area of Permanent Pool: Average depth = 5.00 ft SA/DA ratio = 1.87 From Table 10.3 Minimum pond surface area (SA) = (DA * SA/DA ratio) /100 SA = 0.301 acres 13133 sq. ft. Normal pool elevation = 351.0 feet Surface area provided = 0.377 acres 16428 sq. ft. 1 -Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in. /in. I = Percent impervious Rv = 0.44 in. /in. Total runoff volume from 1 -inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.594 acre -ft 25871 cu. ft. Water quality pool elevation= 352.38 feet Overflow elevation= 352.50 feet Storage volume provided = 0.653 acre -ft 28445 cu.ft. K: \13 \13- 0420 \130427 - Northwest Community Church \H -H \Commercial \BMP #1 BMP #1 - Pond Design Project Name: Howard /Eemerson Tract - Commercial Project #: 2130427 City /State: Cary, NC BMP #1 Date: 1- Oct -14 STORMWATER BMP #1- STORMWATER WET POND (25% TN Removal) AVERAGE DEPTH Per NCDENR "Stormwater Best Management Practices ", the average depth of a wet pond is to be calculated by one of these two options: K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \BMP #1 BMP #1 - Basin Sizing Incremental Accumulated Below Normal Contour Contour Contour Pool Contours Area Volume Volume (feet) (SF) (CF) (CF) 343.00 5809 Abot_ pond 344.00 6613 6207 6207 — Sediment Storage Volume 346.00 8366 14945 21151 350.00 12457 41375 62527 Abot shelf 350.50 13737 6546 69073 Aperm pool 351.00 16428 7531 76604 —Total Pond Volume PPS = Total Volume - Sediment Storage Volume = 70,397 cf OPTION 1: Average Depth = Permanent Pool Volume / Surface Area PPV = 70,397 cf SA = 16,428 sf day = 4.29 ft OPTION 2: Use the following equation: da„ = 0.25 x (1 + Abot_ shelf )+ (Abot_ shelf + Abot_oond) x Depth Aperm_ pool 2 Abot shelf day, = (0.25 x (1 + 13737 )) + ( 13737+ 5473 ) x 6.5 16428 2 13737 day = 5.27 ft Use Average Depth = 5.00 ft OPTION 2 K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \BMP #1 BMP #1 - Basin Sizing Project Name: Howard /Eemerson Tract - Commercial Project #: 2130427 City /State: Cary, NC BMP #1 Date: 1- Oct -14 STORMWATER BMP #1- STORMWATER WET POND (25% TN Removal) Orifice Calculator Q = Cd *A *(2gh)'(1/2) 1" WATER QUALITY STORM VOLUME Variables Constants WQ Volume: 0.594 Acre -ft 25871 cf g = 32.2 ft/s2 Head / Driving Head: 1.38 ft 0.46 ft Cd= 0.6 Draw down time: 65 hrs 234099 s Orifice Area = 0.034 sq. ft Orifice Diameter = 2.491 in USE 2.5 INCH DIAMETER ORIFICE 4.873 sq. in K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \BMP #1 BMP #1- Orifice Calculator HOWARD /EMERSON TRACT NORTHWEST COMMUNUNITY CHURCH - COMMERCIAL STORMWATER MANAGEMENT REPORT CARY, NORTH CAROLINA NITROGEN LOADING CALCULATIONS NWCC - Commercial W &R Project 02130427 Stormwater Management Plan Revised October 2014 Jordan Lake Developer Nutrient Reporting Form Please complete and submit the following information to the local government permitting your development project to characterize it and assess the need to purchase nutrient offsets. Contact and rule implementation information can be found online at http: / /Dortal.ncdenr.org/ web /wq /ps /nps /nutrientoffsetintro. PROJECT INFORMATION (for Jordan Lake) Applicant Name: Northwest Community Church Project Name: Howard /Eemerson Tract - Commercial Project Address (if available): Street: City /Town: County: Morrisville Parkway and White Oak Church Road, Cary, Wake Date: (mo/d/yr) Project Lat: (decimal degrees) Long: (decimal degrees) 7/10/2014 Location : 35.791340° 1 - 78.925725° Is this Redevelopment? Yes Development Type (Please check all that apply) X No Impervious Cover ( %): 1 % HIndustrial Commercial Mixed -Use Single Fam. Residential (Pre- Construction) Duplex Residential HMulti-Fam. Residential Impervious Cover ( %): 19% Institutional (Post- Construction) I H JORDAN WATERSHED INFORMATION Small Watershed ID (6 digits): (See next page or online map.) New Development Load Requirements (See individual rules 60150 for a full description of nutrient requirements.) Jordan Subwatershed (Please check one) Loading Rate Targets Offsite Thresholds Nitrogen (N) & Phosphorus (P) Z.Z N iDiaciyr 0.82 P Ib /ac /yr 4.4 N Ib /ac /yr 0.78 P Ib /ac /yr he offsite thresholds — see above) 6 N Ibs /ac Residential; 10 N Ibs /ac Commercial (must meet all onsite treatment requirements) (D) Upper New Hope EX Lower New Hope NUTRIENT OFFSET REQUEST(Must meet t Nitrogen Loading / Offset Needs (A) (B) (C) Untreated Treated Loading Rate Loading Rate Loading Rate Target (Ibs /ac /yr) (Ibs /ac /yr) (Ibs /ac /yr) 3.52 2.41 4.40 Phosphorus Loading / Offset Needs Z.Z N iDiaciyr 0.82 P Ib /ac /yr 4.4 N Ib /ac /yr 0.78 P Ib /ac /yr he offsite thresholds — see above) 6 N Ibs /ac Residential; 10 N Ibs /ac Commercial (must meet all onsite treatment requirements) (D) (E) (F) (G) Reduction Need Project Offset Delivery (Ibs /ac /yr) Size (ac) Duration (yrs) Factor ( %) B -C Control of Peak Stormwater Flow (1 year 24 hour design storm) 0.00 20.07 30 88% (A) Untreated Loading Rate (Ibs /ac /yr) (B) Treated Loading Rate (Ibs /ac /yr) (C) Loading Rate Target (Ibs /ac /yr) (D) Reduction Need (Ibs /ac /yr) B - C (E) Project Size (ac) (F) Offs Duration 0.83 0.49 0.78 0.00 20.07 30 Control of Peak Stormwater Flow (1 year 24 hour design storm) Calculated Predevelopment Peak Flow 35.91 Calculated Post Development Peak Flow 17.45 (H) State Buy Down Amount (Ibs) D`E'F`G 0 (G) (H) et Delivery State Buy Down (yrs) Factor ( %) Amount (Ibs) D "E'F`G 91% 0 Flow Control Method Wet Detention Pond Authorizing Local Government Name: Town of Cary Staff Name: I Matt Flynn Staff Email: matt.flynn @townofcary.org Phone: 919.469.4347 Jordan Nutrient Load Reporting Form. September 12, 2012 Physiographic /Geologic Region: Piedmont Soil Hydrologic Group D Precipitation location: Raleigh COLUMN 1 -- NON- RESIDENTIAL LAND USES 874,191 TN EMC I TP EMC (rng /L) (mg /L) COMMERCIAL Howard /Eemerson Tract - Commercial Post - Development (ftz) Pre- Development (ftz) Parking lot 1.44 0.16 -ac lots 111,302 Roof 1.08 0.15 18,594 Open /Landscaped 2.24 0.44 1 -ac lots INDUSTRIAL Parking lot 1.44 0.39 2-ac lots Roof 1.08 0.15 Multi- family Open /Landscaped 2.24 0.44 Townhomes TRANSPORTATION High Density (interstate, main) 3.67 0.43 Custom Lot Size Low Density (secondary, feeder) 1.4 0.52 PART B Roadway Rural 1.14 0.47 12,900 1.0 1.44 Parking lot Sidewalk 1.4 1.16 32,000 Sidewalk /Patio PERVIOUS Lawn Managed pervious 3.06 0.59 3.06 416,523 1.47 Unmanaged (pasture) 3.61 1.56 244,917 Open water* Forest 1.47 0.25 616,374 295,772 JURISDICTIONAL LANDS* Natural wetland Riparian buffer Open water LAND TAKEN UP BY BMPs 1.08 0.15 *Jurisdictional land uses are not included in nutrient /flow calculations. Total Development Area (ft 2): 874,191 Development Name: Howard /Eemerson Tract - Commercial Model Prepared By: JCD COLUMN 2 -- RESIDENTIAL LAND USES Custom Age TN EMC TP EMC Pre- Post - Lot Size Development Development (ac) (yrs) (mg /L) (mg /L) (ftz) (ftz) PART A %-ac lots -ac lots Y. -ac lots 1 -ac lots 2-ac lots Multi- family Townhomes Custom Lot Size PART B Roadway 1.4 0.52 0.39 0.39 0.15 1.16 0.44 0.59 0.25 -- 0.15 Driveway 1.0 1.44 Parking lot 1.44 Roof 1.08 Sidewalk /Patio 1.4 Lawn 2.24 Managed pervious 3.06 Forest 1.47 Natural wetland* Riparian buffer* Open water* LAND TAKEN UP BY BMPs -- 1.0.0 8 LAND USE AREA CHECK Total Development Area Entered (ft'): 874,191 Total Pre - Development Calculated Area (ft): 874,191 Total Post - Development Calculated Area (ftz): 874,191 Type of BMP: If BMP is undersized, indicate the BMP's size relative to the design size required to capture the designated water quality depth (i.e. 0.75 = BMP is 75% of required design size): *For water harvesting BMP, enter percent volume reduction in decimal form. Catchment 1: Catchment 2: Catchment 3: Catchment 4: Catchment 5: Catchment 6: Drainage Area Land Use MMERCIAL Parking lot Roof Open /Landscaped )USTRIAL Parking lot Roof Open /Landscaped ANSPORTATION High Density (interstate, main) Low Density (secondary, feeder) Rural Sidewalk SC. PERVIOUS 2 -ac lots (New) 2 -ac lots (Built after 1995) 2 -ac lots (Built before 1995) 1 -ac lots (New) 1 -ac lots (Built after 1995) 1 -ac lots (Built before 1995) -ac lots (New) % -ac lots (Built after 1995) % -ac lots (Built before 1995) Y -ac lots (New) Y -ac lots (Built after 1995) X -ac lots (Built before 1995) % -ac lots (New) A -ac lots (Built after 1995) %-ac lots (Built before 1995) Townhomes (New) Townhomes (Built after 1995) Townhomes (Built before 1995) Multi- family (New) Multi- family (Built after 1995) Multi- family (Built before 1995) Custom Lot Size (New) Custom Lot Size (Built after 1995) Custom Lot Size (Built before 1995) Sidewalk Lawn Managed pervious Forest NO TAKEN UP BY BMP TOTAL AREA TREATED BY BMP (ftz): TOTAL AREA TREATED BY SERIES (ft): ......................."" BMP #1 Wet Detention Pond CATCHMENT 1 ----------------------------- BMP #2 BMP #3 no no no no no no no no no no no no no no no Area treated Area treated Area Treated by BMP #3 that is not by BMP by BMP #2 that is not treated by BMPs #1 treated by BMP #1 (ft z) or #2 1ft' 1 (ft) 106,300 16,042 16,042 325,907 158,617 622,908 0 0 622,908 3. Development Summary Development: Howard /Eemerson Tract - Commercial Prepared By: JCD Date: October 2, 2014 WATERSHED SUMMARY Ver2.0 REGION: Piedmont TOTAL DEVELOPMENT AREA (ft ): 874,191 Percent Impervious ( %) 17% 17% 0% Pre - Development Conditions Post - Development Conditions Post - Development w/ BMPS Percent Impervious 1,5% 18.5% 1815% ( %) Total Nitrogen Loading (lb /ac /yr) 189% 98% Annual Runoff Volume Total Phosphorus EMC (mg/L) -18% -59% (c.f.) 209,338 716,782 657,865 Total Nitrogen EMC 0.26 1.08 0.15 (mg/L) 1.87 1.58 1.18 Total Nitrogen Loading 1.20 0.15 Permeable (lb /ac/yr) 1.22 3.52 2.41 0% 1.44 0.39 Total Phosphorus EMC (mg /L) 0.59 0.48 0.24 user defined 1.08 0.15 Total Phosphorus Loading (lb /ac /yr) 0.38 0.83 0.49 Percent Difference Between: Negative percent difference values indicate a decrease in runoff volume, pollutant concentration or pollutant loading. Positive values indicate an increase. BMP SUMMARY Ver2.0 BMP VOLUME REDUCTIONS /EFFLUENT CONCENTRATIONS Pre -Dev. & Post -Dev. without BMPs Pre - Development & Post - Development with BMPs Post -Dev without BMPs & Post -Dev with BMPs Percent Impervious ( %) 17% 17% 0% Annual Runoff Volume (c.f.) 242% 214% -8% Total Nitrogen EMC (mg/L) -16% -37% -25% Total Nitrogen Loading (lb /ac /yr) 189% 98% -32% Total Phosphorus EMC (mg/L) -18% -59% -50% Total Phosphorus Loading (lb /ac /yr) 1 117% 1 29% 1 -41% Negative percent difference values indicate a decrease in runoff volume, pollutant concentration or pollutant loading. Positive values indicate an increase. BMP SUMMARY Ver2.0 BMP VOLUME REDUCTIONS /EFFLUENT CONCENTRATIONS `if treating commercial parking lot, TP effluent concentration = 0.16 mg/L Return to Instructions [ Return to Watershed Characteristics I Return to BMP Characteristics l Print Summary I CATCHMENT 1 Volume Reduction TN Effluent Concen. TP Effluent Concen. CATCHMENT 4 (%) (mg/L) (mg/L) Bioretention with BMP1 BMP2 BMP3 MIS 50% 0.95 0.12 Bioretention without BMP3 BMP1 BMP2 MIS 35% 1.00 0.12 Dry Detention Pond 0% 1.20 0.20 Grassed Swale 0% 1.21 0.26 1.08 0.15 Green Roof 50% Level Spdr, Filter 40% Strip 1.20 0.15 Permeable Pavement* 0% 1.44 0.39 Sand Filter 5% 0.92 0.14 Water Harvesting user defined 1.08 0.15 Wet Detention Pond 10% 1.01 0.11 Wetland 20% 1.08 0.12 `if treating commercial parking lot, TP effluent concentration = 0.16 mg/L Return to Instructions [ Return to Watershed Characteristics I Return to BMP Characteristics l Print Summary I CATCHMENT 1 CATCHMENT 2 CATCHMENT 3 CATCHMENT 4 CATCHMENTS CATCHMENT 6 BMP1 BMP2 BMP3 BMP1 BMP2 BMP3 BMP1 BMP2 BMP3 BMP1 BMP2 BMP3 BMP1 BMP2 BMP3 BMP1 BMP2 BMP3 39% - -- -- - -- Catchment Outflow Phosphorus EMC (mg/L) 0.134 Wet Detention Pond Catchment Outflow Total Phosphorus (lb /ac /yr) 0.311 - - -- Total Area Treated - Percent Reduction in Phosphorus Load ( %) 61% - -- -- - -- Total Inflow Volume 589,161 - - -- - -- -- - - - -- - -- - - - - - (c.f.) Percent Volume Reduced 10% Inflow Nitrogen EMC (mg/L) 1.57 Total Inflow Nitrogen (lb /ac /yr) 4.04 - - -- - -- Inflow Phosphorus EMC (mg/L) 0.306 -- - Total Inflow Phosphorus (lb /ac /yr) 0.79 BMP Outflow Nitrogen (Ibs /ac /yr) 2.48 - - -- - - - -- - - -- - -- - - - - - BMP Outflow Phosphorus (Ibs /ac /yr) 0.31 - - -- - - - - - - -- - -- - - - -- - Catchment Outflow Nitrogen EMC (mg/L) 1.07 - - -- - - Catchment Outflow 2.48 - - - - Total Nitrogen (lb /ac /yr) Percent Reduction in Nitrogen Load ( %) 39% - -- -- - -- Catchment Outflow Phosphorus EMC (mg/L) 0.134 _ Catchment Outflow Total Phosphorus (lb /ac /yr) 0.311 - - -- - - Percent Reduction in Phosphorus Load ( %) 61% - -- -- - -- HOWARD /EMERSON TRACT NORTHWEST COMMUNUNITY CHURCH - COMMERCIAL STORMWATER MANAGEMENT REPORT CARY, NORTH CAROLINA PONDPACK ROUTING CALCULATIONS NWCC - Commercial W &R Project 02130427 Stormwater Management Plan Revised October 2014 pre R Q Q 5' O to bmp Q Q x N O A w bmp PRE �©v 76 bypass Q Q W O A& o Job File: K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \NWCC- COMM.PPW Rain Dir: K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial\ JOB TITLE Project Date: 7/9/2014 Project Engineer: jdiaz Project Title: 2130427 Project Comments: Revised 10/1/14 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014 Table of Contents Table of Contents i * * * * * * * * * * * * * * * * * * * * ** MASTER SUMMARY * * * * * * * * * * * * * * * * * * * * ** Watershed....... Master Network Summary ............. 1.01 * * * * * * * * * * * * * * * * ** DESIGN STORMS SUMMARY * * * * * * * * * * * * * * * * * ** RDU 24 Hour Desi Design Storms ...................... 2.01 * * * * * * * * * * * * * * * * * * * * ** TC CALCULATIONS * * * * * * * * * * * * * * * * * * * ** BYPASS.......... Tc Calcs ........................... 3.01 PRE ............. Tc Calcs ........................... 3.03 TO BMP.......... Tc Calcs ........................... 3.05 * * * * * * * * * * * * * * * * * * * * ** CN CALCULATIONS * * * * * * * * * * * * * * * * * * * ** BYPASS.......... Runoff CN -Area ..................... 4.01 PRE ............. Runoff CN -Area ..................... 4.02 TO BMP.......... Runoff CN -Area ..................... 4.03 * * * * * * * * * * * * * * * * * * * * * ** POND VOLUMES * * * * * * * * * * * * * * * * * * * * * ** BMP ............. Vol: Elev -Area ..................... 5.01 SIN: Bentley PondPack (10.00.027.00) 4:59 PM Bentley Systems, Inc. 10/1/2014 Table of Contents Table of Contents (continued) ii * * * * * * * * * * * * * * * * * * ** OUTLET STRUCTURES * * * * * * * * * * * * * * * * * * * ** Outlet 1........ Outlet Input Data .................. 6.01 Composite Rating Curve ............. 6.04 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \NWCC- comm.ppw MASTER DESIGN STORM SUMMARY Network Storm Collection: RDU 24 Hour Desi Total Depth Return Event in 1 2.8300 2 3.4400 5 4.3000 10 4.9800 100 7.3700 Rainfall Type --------------- - Time -Depth Curve Time - Depth Curve Time -Depth Curve Time -Depth Curve Time -Depth Curve RNF ID RDU NOAA lyr RDU NOAA 2yr RDU NOAA 5yr RDU NOAA 10yr RDU NOAA 100yr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method ( *Node= Outfall; +Node = Diversion;) (Trun= HYG Truncation: Blank =None; L =Left; R =Rt; LR= Left &Rt) SIN: Bentley PondPack (10.00.027.00) 4:59 PM Bentley Systems, Inc. 10/1/2014 Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event ac -ft Trun hrs cfs ft ac -ft ----------- BMP - - - - -- IN - - -- POND - - - - -- 1 ---- - - - - -- 2.238 -- --- - - - - -- 12.1000 -- - - - - -- 48.71 -- - - - - -- ------ - - - - -- BMP IN POND 2 2.971 12.1000 63.51 BMP IN POND 5 4.037 12.1000 78.65 BMP IN POND 10 4.898 12.1000 90.47 BMP IN POND 100 7.988 12.1000 118.20 BMP OUT POND 1 2.216 R 12.3000 13.17 353.30 1.054 BMP OUT POND 2 2.948 R 12.2500 27.88 353.70 1.265 BMP OUT POND 5 4.012 R 12.2000 50.28 354.03 1.443 BMP OUT POND 10 4.872 R 12.1500 64.39 354.20 1.538 BMP OUT POND 100 7.961 R 12.1500 90.54 354.51 1.715 BYPASS AREA 1 .512 12.1000 10.98 BYPASS AREA 2 .731 12.1000 15.79 BYPASS AREA 5 1.063 12.1000 21.27 BYPASS AREA 10 1.339 12.1000 25.62 BYPASS AREA 100 2.368 12.1000 36.67 SIN: Bentley PondPack (10.00.027.00) 4:59 PM Bentley Systems, Inc. 10/1/2014 Type.... Master Network Summary Page 1.02 Name.... Watershed File.... K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \NWCC- comm.ppw MASTER NETWORK SUMMARY SCS Unit Hydrograph Method ( *Node = Outfall; +Node = Diversion;) (Trun= HYG Truncation: Blank =None; L =Left; R =Rt; LR= Left &Rt) SIN: Bentley PondPack (10.00.027.00) 4:59 PM Bentley Systems, Inc. 10/1/2014 Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID ----------- - - Type - - -- - - -- Event - - - - -- ac -ft ---- - - - - -- Trun -- hrs --- - - - - -- cfs ft ac -ft -- - - - - -- -- - - - - -- ------ - - - - -- *POST JCT 1 2.728 R 12.2000 17.45 *POST JCT 2 3.678 R 12.2000 36.24 *POST JCT 5 5.075 R 12.1500 64.62 *POST JCT 10 6.211 R 12.1500 84.33 *POST JCT 100 10.328 R 12.1500 119.24 PRE AREA 1 1.688 12.1000 35.91 PRE AREA 2 2.428 12.1000 52.36 PRE AREA 5 3.561 12.1000 71.30 PRE AREA 10 4.507 12.1000 86.36 PRE AREA 100 8.048 12.1000 125.04 *PRE JCT 1 1.688 12.1000 35.91 *PRE JCT 2 2.428 12.1000 52.36 *PRE JCT 5 3.561 12.1000 71.30 *PRE JCT 10 4.507 12.1000 86.36 *PRE JCT 100 8.048 12.1000 125.04 TO BMP AREA 1 2.238 12.1000 48.71 TO BMP AREA 2 2.971 12.1000 63.51 TO BMP AREA 5 4.037 12.1000 78.65 TO BMP AREA 10 4.898 12.1000 90.47 TO BMP AREA 100 7.988 12.1000 118.20 SIN: Bentley PondPack (10.00.027.00) 4:59 PM Bentley Systems, Inc. 10/1/2014 Type.... Design Storms Name.... RDU 24 Hour Desi Page 2.01 File.... K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \NWCC - comm.ppw Title... Project Date: 7/9/2014 Project Engineer: jdiaz Project Title: 2130427 Project Comments: Revised 10/1/14 DESIGN STORMS SUMMARY Design Storm File,ID = RDU 24 Hour Desi Storm Tag Name = 1 ---------------------------------------------------------------- - - - - -- Data Type, File, ID = Time -Depth Curve RDU NOAA 1yr Storm Frequency = 1 yr Total Rainfall Depth= 2.8300 in Duration Multiplier = 1 Resulting Duration = 23.9999 hrs Resulting Start Time= .0000 hrs Step= .0833 hrs End= 23.9999 hrs Storm Tag Name = 2 Data Type, File, ID = Time -Depth Curve RDU NOAA 2yr Storm Frequency = 2 yr Total Rainfall Depth= 3.4400 in Duration Multiplier = 1 Resulting Duration = 23.9904 hrs Resulting Start Time= .0000 hrs Step= .0833 hrs End= 23.9904 hrs Storm Tag Name = 5 Data Type, File, ID = Time -Depth Curve RDU NOAA 5yr Storm Frequency = 5 yr Total Rainfall Depth= 4.3000 in Duration Multiplier = 1 Resulting Duration = 23.9904 hrs Resulting Start Time= .0000 hrs Step= .0833 hrs End= 23.9904 hrs Storm Tag Name = 10 Data Type, File, ID = Time -Depth Curve RDU NOAA 10yr Storm Frequency = 10 yr Total Rainfall Depth= 4.9800 in Duration Multiplier = 1 Resulting Duration = 23.9904 hrs Resulting Start Time= .0000 hrs Step= .0833 hrs End= 23.9904 hrs Storm Tag Name = 100 Data Type, File, ID = Time -Depth Curve RDU NOAA 100yr Storm Frequency = 100 yr Total Rainfall Depth= 7.3700 in Duration Multiplier = 1 Resulting Duration = 23.9990 hrs Resulting Start Time= .0000 hrs Step= .0833 hrs End= 23.9990 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014 Type.... Tc Calcs Name.... BYPASS Page 3.01 File.... K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \NWCC - comm.ppw .......................................... ............................... ......................................... ............................... TIME OF CONCENTRATION CALCULATOR ......................................... ............................... ......................................... ............................... Segment #1: Tc: Kirpich (TN) Hydraulic Length 841.00 ft Slope .042000 ft /ft Multiplier 1.000 (Tc Adjustment) Avg.Velocity 2.97 ft /sec Segment #1 Time: .0787 hrs ------------------------------------------------------------------ - - - - -- ------------------ - - - - -- Total Tc: .0787 hrs Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014 Type.... Tc Calcs Name.... BYPASS Page 3.02 File.... K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \NWCC - comm.ppw ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------ - - - - -- Kirpich (TN) Tc = 0.00013 * (Lf* *0.77) * (Sf * *- 0.385) * Mt Where: Tc = Time of concentration, hrs Lf = Flow length, ft Sf = Slope, ft /ft Mt = Tc Multiplier (Tc adjustment) SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014 Type.... Tc Calcs Name.... PRE Page 3.03 File.... K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \NWCC - comm.ppw .......................................... ............................... ......................................... ............................... TIME OF CONCENTRATION CALCULATOR ......................................... ............................... ......................................... ............................... Segment #1: Tc: Kirpich (TN) Hydraulic Length 841.00 ft Slope .042000 ft /ft Multiplier 1.000 (Tc Adjustment) Avg.Velocity 2.97 ft /sec Segment #1 Time: .0787 hrs ------------------------------------------------------------------ - - - - -- ------------------ - - - - -- Total Tc: .0787 hrs Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014 Type.... Tc Calcs Name.... PRE Page 3.04 File.... K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \NWCC - comm.ppw ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------ - - - - -- Kirpich (TN) Tc = 0.00013 * (Lf* *0.77) * (Sf * *- 0.385) * Mt Where: Tc = Time of concentration, hrs Lf = Flow length, ft Sf = Slope, ft /ft Mt = Tc Multiplier (Tc adjustment) SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014 Type.... Tc Calcs Name.... TO BMP Page 3.05 File.... K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \NWCC - comm.ppw .......................................... ............................... ......................................... ............................... TIME OF CONCENTRATION CALCULATOR ......................................... ............................... ......................................... ............................... Segment #1: Tc: User Defined Segment #1 Time: .0833 hrs ------------------------------------------------------------------ - - - - -- ------------------- - - - - -- Total Tc: .0833 hrs Calculated Tc < Min.TC: Use Minimum Tc... Use Tc = .0833 hrs ------------------ - - - - -- SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014 Type.... Tc Calcs Name.... TO BMP Page 3.06 File.... K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \NWCC - comm.ppw ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------ - - - - -- User Defined Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014 Type.... Runoff CN -Area Name.... BYPASS Page 4.01 File.... K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \NWCC - comm.ppw RUNOFF CURVE NUMBER DATA ........................................... ............................... ........................................... ............................... SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014 Impervious Area Adjustment Adjusted Soil /Surface Description CN acres %C %UC CN -------------------------- - - - - -- open - - -- 80 --- - - - - -- 2.710 - - - -- - - - -- - - - - -- 80.00 woods 77 2.820 77.00 Impervious Areas 98 .240 98.00 COMPOSITE AREA & WEIGHTED CN - - -> ............................................ ............................................ 5.770 ............................... ............................... 79.28 (79) SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014 Type.... Runoff CN -Area Name.... PRE Page 4.02 File.... K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \NWCC - comm.ppw RUNOFF CURVE NUMBER DATA ........................................... ............................... ........................................... ............................... Impervious Area Adjustment Adjusted Soil /Surface Description CN acres %C %UC CN open 80 5.920 5.00 80.45 woods 77 14.150 77.00 COMPOSITE AREA & WEIGHTED CN - - -> 20.070 78.02 (78) ............................................ ............................... ............................................ ............................... SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014 Type.... Runoff CN -Area Name.... TO BMP Page 4.03 File.... K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \NWCC - comm.ppw RUNOFF CURVE NUMBER DATA ........................................... ............................... ........................................... ............................... SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014 Impervious Area Adjustment Adjusted Soil /Surface Description CN acres %C %UC CN -------------------------- - - - - impervious -- - - -- 98 --- - - - - -- 3.440 - - - -- - - - -- - - - - -- 98.00 open 80 8.360 80.00 Future 98 2.500 98.00 Off -Site 80 1.800 60.00 90.80 COMPOSITE AREA & WEIGHTED CN - - -> 16.100 87.85 (88) SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014 Type.... Vol: Elev -Area Name.... BMP Page 5.01 File.... K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \NWCC - comm.ppw Elevation Planimeter Area Al +A2 +sgr(A1 *A2) Volume Volume Sum (ft) (sq.in) ------------------------------------------------------------------------ (sq.ft) (sq.ft) (ac -ft) (ac -ft) 351.00 - - - -- 16428 0 .000 .000 352.00 - - - -- 20161 54788 .419 .419 353.00 - - - -- 21974 63183 .483 .903 354.00 - - - -- 23843 68706 .526 1.429 355.00 - - - -- 25769 74399 .569 1.998 356.00 - - - -- 27751 80262 .614 2.612 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2 -EL1) * (Areal + Area2 + sq.rt.(Areal *Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014 Type.... Outlet Input Data Name.... Outlet 1 Page 6.01 File.... K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \NWCC - comm.ppw REQUESTED POND WS ELEVATIONS: Min. Elev.= 351.00 ft Increment = .20 ft Max. Elev.= 356.00 ft OUTLET CONNECTIVITY - - -> Forward Flow Only (UpStream to DnStream) < - -- Reverse Flow Only (DnStream to UpStream) < - - -> Forward and Reverse Both Allowed Structure ----------- - - - - -- No. - - -- Outfall - - - - - -- E1, ft --- - - - - -- E2, ft --- - - - - -- Weir- Rectangular WO - - -> CO 352.500 356.000 Inlet Box RO - - -> CO 353.500 356.000 Orifice - Circular 00 - - -> CO 351.000 356.000 Culvert - Circular CO - - -> TW 344.000 356.000 TW SETUP, DS Channel SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014 Type.... Outlet Input Data Name.... Outlet 1 Page 6.02 File.... K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \NWCC - comm.ppw OUTLET STRUCTURE INPUT DATA Structure ID Structure Type -------- - - - - -- # of Openings Crest Elev. Weir Length Weir Coeff. WO Weir - Rectangular ---------------- 1 352.50 ft 6.00 ft 3.100000 Weir TW effects (Use adjustment equation) Structure ID = RO Structure Type = Inlet Box ------------------------------------ # of Openings = 1 Invert Elev. = 353.50 ft Orifice Area = 25.0000 sq.ft Orifice Coeff. _ .600 Weir Length = 14.00 ft Weir Coeff. = 3.100 K, Reverse = 1.000 Mannings n = .0000 Kev,Charged Riser = .000 Weir Submergence = No Structure ID = 00 Structure Type = Orifice- Circular ------------------------------------ # of Openings = 1 Invert Elev. = 351.00 ft Diameter = .2083 ft Orifice Coeff. _ .600 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014 Type.... Outlet Input Data Name.... Outlet 1 Page 6.03 File.... K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \NWCC - comm.ppw OUTLET STRUCTURE INPUT DATA Structure ID = CO Structure Type = Culvert - Circular ------------------------------------ No. Barrels = 1 Control K = Barrel Diameter = 3.0000 ft Upstream Invert = 344.00 ft Dnstream Invert = 342.15 ft Horiz. Length = 187.00 ft Barrel Length = 187.01 ft Barrel Slope = .00989 ft /ft OUTLET CONTROL DATA... Mannings n = .0130 Ke = .5000 Kb = .007228 Kr = .5000 HW Convergence = .001 INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW /D) = 1.155 T2 ratio (HW /D) = 1.302 Slope Factor = -.500 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 347.47 ft - - -> Flow = 42.85 cfs At T2 Elev = 347.91 ft - - -> Flow = 48.97 cfs Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 40 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .00 cfs Max. Q tolerance = .00 cfs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014 Type.... Composite Rating Curve Name.... Outlet 1 Page 6.04 File.... K: \13 \13- 0420 \130427- Northwest Community Church \H -H \Commercial \NWCC - comm.ppw * * * ** COMPOSITE OUTFLOW SUMMARY * * ** WS Elev, Total Q Notes ---------- - - - - -- -- - - - - -- Converge ------------------------- Elev. Q TW Elev Error ft cfs ft + / -ft Contributing Structures -- - - - - -- 351.00 - - - - - -- .00 -- - - - - Free -- - - - -- Outfall -------------------------- (no Q: WO,RO,OO,CO) 351.20 .05 Free Outfall OO,CO (no Q: WO,RO) 351.40 .09 Free Outfall OO,CO (no Q: WO,RO) 351.60 .11 Free Outfall OO,CO (no Q: WO,RO) 351.80 .14 Free Outfall OO,CO (no Q: WO,RO) 352.00 .15 Free Outfall OO,CO (no Q: WO,RO) 352.20 .17 Free Outfall OO,CO (no Q: WO,RO) 352.40 .19 Free Outfall OO,CO (no Q: WO,RO) 352.50 .19 Free Outfall OO,CO (no Q: WO,RO) 352.60 .79 Free Outfall WO,OO,CO (no Q: RO) 352.80 3.24 Free Outfall WO,OO,CO (no Q: RO) 353.00 6.70 Free Outfall WO,OO,CO (no Q: RO) 353.20 10.88 Free Outfall WO,OO,CO (no Q: RO) 353.40 15.65 Free Outfall WO,OO,CO (no Q: RO) 353.50 18.23 Free Outfall WO,OO,CO (no Q: RO) 353.60 22.32 Free Outfall WO,RO,OO,CO 353.80 33.78 Free Outfall WO,RO,OO,CO 354.00 48.08 Free Outfall WO,RO,OO,CO 354.20 64.56 Free Outfall WO,RO,OO,CO 354.40 82.95 Free Outfall WO,RO,OO,CO 354.60 96.48 Free Outfall WO,RO,OO,CO 354.80 101.89 Free Outfall WO,RO,OO,CO 355.00 104.87 Free Outfall WO,RO,OO,CO 355.20 106.56 Free Outfall WO,RO,OO,CO 355.40 107.61 Free Outfall WO,RO,OO,CO 355.60 108.65 Free Outfall RO,CO (no Q: WO,O0) 355.80 109.69 Free Outfall RO,CO (no Q: WO,O0) 356.00 110.71 Free Outfall RO,CO (no Q: WO,O0) SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014 Appendix A Index of Starting Page Numbers for ID Names - - - -- B ----- BMP... 5.01 BYPASS... 3.01, 4.01 - - - -- 0 - - - -- Outlet 1... 6.01, 6.04 - - - -- P ----- PRE ... 3.03, 4.02 - - - -- R - - - -- RDU 24 Hour Desi... 2.01 - - - -- T - - - -- TO BMP... 3.05, 4.03 - - - -- W ----- Watershed ... 1.01 A -1 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:59 PM 10/1/2014