HomeMy WebLinkAboutNCC215772_NOT Closeout Documents_20221031ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
October 10, 2022
SEDIMENT AND EROSION CONTROL & CONSTRUCTION STORMWATER
INSPECTION REPORT
Kinston Development Group, LLC
Attn: Gavin Melia, Member
155 West New York Avenue, Suite 200
Southern Pines, North Carolina 28387
Dear Sir:
Attached is a copy of the inspection report prepared following an onsite inspection of the project
referenced on the report. This report is intended to inform you of the project's compliance with
the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES
Stormwater General Permit.
Please review this report carefully as it may contain corrective actions needed and/or comments
which will assist you in meeting the required performance standards.
It is our desire that any and all possible problems be discussed and resolved at the earliest
possible time. To facilitate this effort, please contact me at the address/phone number below
should you have any questions.
Sincerely,
x4o-� 4��
Bradley West
Environmental Specialist II
(252) 946-6481
Enclosure: Sediment/Construction Stormwater Inspection Report
rr.. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Washington Regional office 1 943 Washington Square Mail Washington, North Carolina 27889
oeux ttorrnwio�m nntm� ,�rr"�✓ 252.946,6481
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Lenoir Project: Tractor Supply Company Kinston River basin: Neuse
Person financially responsible: Kinston Development Group LLC - Gavin Melia, Project #: LENOI-2022-002
Member
Address: 155 West New York Ave. Suite 200, Southern Pines, NC
1. Project Location: HWY 70, Kinston
Pictures: No
2. Weather and soil conditions: Sunny, warm, dry
Initial inspection: no
3._ _ Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one
Title:
Inspection report: Sent Report Date given/sent: October 10, 2022
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -
inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the
10. Comments: NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice
of Termination (NOT). The NOT is available at: https://edocs deg nc gov/Forms/NCG01 Termination. Please note that this
correspondence must be uploaded as part of completing the NOT process.
Reported by: Bradley West Others present:
Date of inspection: October 06, 2022 Time arriving on site: 12:30 PM Time leaving site: 12:50 PM
cc: