Loading...
HomeMy WebLinkAboutNCC215772_NOT Closeout Documents_20221031ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality October 10, 2022 SEDIMENT AND EROSION CONTROL & CONSTRUCTION STORMWATER INSPECTION REPORT Kinston Development Group, LLC Attn: Gavin Melia, Member 155 West New York Avenue, Suite 200 Southern Pines, North Carolina 28387 Dear Sir: Attached is a copy of the inspection report prepared following an onsite inspection of the project referenced on the report. This report is intended to inform you of the project's compliance with the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES Stormwater General Permit. Please review this report carefully as it may contain corrective actions needed and/or comments which will assist you in meeting the required performance standards. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact me at the address/phone number below should you have any questions. Sincerely, x4o-� 4�� Bradley West Environmental Specialist II (252) 946-6481 Enclosure: Sediment/Construction Stormwater Inspection Report rr.. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Washington Regional office 1 943 Washington Square Mail Washington, North Carolina 27889 oeux ttorrnwio�m nntm� ,�rr"�✓ 252.946,6481 North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Lenoir Project: Tractor Supply Company Kinston River basin: Neuse Person financially responsible: Kinston Development Group LLC - Gavin Melia, Project #: LENOI-2022-002 Member Address: 155 West New York Ave. Suite 200, Southern Pines, NC 1. Project Location: HWY 70, Kinston Pictures: No 2. Weather and soil conditions: Sunny, warm, dry Initial inspection: no 3._ _ Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one Title: Inspection report: Sent Report Date given/sent: October 10, 2022 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self - inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the 10. Comments: NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs deg nc gov/Forms/NCG01 Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Bradley West Others present: Date of inspection: October 06, 2022 Time arriving on site: 12:30 PM Time leaving site: 12:50 PM cc: