Loading...
HomeMy WebLinkAboutNC0043257_Compliance Evaluation Inspection_20221101DocuSign Envelope ID: 943EC068-268B-418F-BB6F-962C10606A67 ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Environmental Quality Matthew E. Raynor Nature Trails Associates Nature Trails MHC WWTP 524 Meadow Ave Loop Banner Elk, NC 28604 Dear Mr. Raynor: NORTH CAROLINA November 1, 2022 Subject: Compliance Evaluation Inspection Nature Trails Mobile Home Park WWTP NPDES Permit No. NC0043257 Chatham County On July 18, 2022, Colleen Cohn of the Raleigh Regional Office (RRO) conducted an inspection at the subject facility. The cooperation of Peter Salisbury, Operator in Responsible Charge (ORC) of the facility, was greatly appreciated. Findings during the inspection were as follows: 1. The current NPDES permit was issued effective on November 1, 2021 and will expire on April 30, 2026. 2. The 0.04 MGD treatment plant consists of an influent pump station, equalization basin, flow splitter box, aeration basins, dual clarifiers, aerobic sludge digesters, effluent chlorination, dechlorination, and flow monitoring. 3. The plant discharges to Cub Creek [16-41-2-10-(0.5)] which is classified as WS-IV;NSW waters in the Cape Fear River Basin. 4. The field parameters performed by the operator are pH and Dissolved Oxygen. Enco Laboratories performs analysis for all other permitted parameters. 5. A cursory review of laboratory data and discharge monitoring report (DMR) data for July 2021 and January 2022 showed one typo for the weekly composite TSS value for July 15, 2021. Please revise the eDMR values for TSS for the week of July 15, 2021. 6. A cursory review of DMR data for July 2021 and January 2022 showed a monthly average for Ammonia (NH3) as N in January 2022. The monthly average was 7.825 mg/L which exceeds the permit limit of 5.2 mg/L for the period of November 1 - March 31. A cursory review of data from July 2018 to July 2022 showed that the facility has had ten (10) Monthly Average Exceedances for Nitrogen, Ammonia. Within 30-days receipt of this letter, please provide a written response to this office outlining the Nature Trails Association CLP's efforts to analyze and/or investigate the cause for Nitrogen, Ammonia exceedances. NORTH CAROLINA Department M Environmental Quality North Carolina Department of Environmental Quality I Division of Water Resources Raleigh Regional Office I 3800 Barrett Drive I Raleigh, North Carolina 27609 919.791.4200 DocuSign Envelope ID: 943EC068-268B-418F-BB6F-962C10606A67 7. The facility has two equalization basins. The housing for both equalization basins appeared to be heavily corroded. The air pipe to one of the basins was rusted through and inoperable. Within 30- days receipt of this letter, please provide a written response to this office outlining the schedule you will take or have taken to repair the equalization basins and aeration system. 8. The dual clarifiers appeared to be operating satisfactorily. Effluent from the clarifier in Plant 1 was clear with minimal algae, and effluent from the clarifier in Plant 2 was slightly cloudy with some algae. 9. The aerobic sludge digesters appeared to be operating satisfactorily. Mr. Salisbury stated that the digesters hold approximately 12,000 gallons total and that 10,000 gallons of sludge are hauled by Granville Farms approximately every 1.5 months. 10. The liquid disinfection and tablet dechlorination systems appeared to be operating satisfactorily. 11. The digital flow meter and chart recorder were not working during the inspection. Mr. Salisbury stated that they stopped working over the weekend and a maintenance request had been submitted. Within 30-days receipt of this letter, please provide a written response to this office outlining the schedule you will take or have taken to repair the digital flow meter and chart recorder. 12. The effluent flow meter was calibrated on August 24, 2021. 13. Mr. Salisbury stated he did not believe the onsite diesel generator is working. Within 30-days receipt of this letter, please provide a written response to this office outlining the schedule you will take or have taken to repair the onsite diesel generator. Please also include information regarding the onsite diesel generator's maintenance and testing schedule. 14. The effluent discharge was clear and free of excess solids and foam at the time of the inspection. No detrimental impacts to Cub Creek were observed. 15. A daily operator logbook was readily available for review. Please respond in writing to items 5, 6, 7, 11, and 13 within 30 days of receipt of this letter describing how these items have been resolved. If you have questions concerning this report, please contact Colleen Cohn at 919-791-4258 or colleen.cohn@ncdenr.gov. LICb{f V IA,SDIA, BCDA9D825D4A46D... Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ Sincerely, DocuSigned by: Attachment 1: EPA Compliance Inspection Report cc: Laserfiche £ D_E NORTHCAROLINA Department of Environmental Deep North Carolina Department of Environmental Quality I Division of Water Resources Raleigh Regional Office I 3800 Barrett Drive I Raleigh, North Carolina 27609 919.791.4200 DocuSign Envelope ID: 943EC068-268B-418F-BB6F-962C10606A67 United States Environmental Protection Agency EPA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code 1 IN I 2 L 21IIIIII NPDES yr/mo/day Inspection 3 I NC0043257 111 121 22/07/18 117 Type 1810I IIIIIIIIIII Inspector Fac Type 191S I 2011 IIIIIIIIIII IIIIIII I IIIIII P6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 671 I 70I I 711 172 I N I 731 1 74 71 I I I I I I I I 180 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES oermit Number) Nature Trails Mobile Home Park WWTP 101 Nature Trl Chapel Hill NC 27514 Entry Time/Date 10:OOAM 22/07/18 Permit Effective Date 21/11/01 Exit Time/Date 11:OOAM 22/07/18 Permit Expiration Date 26/04/30 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Matthew E. Raynor,524 Meadow Ave Loop Banner Elk NC 286047402/Environmental Director/828-733-5028/9198691572 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Maintenar Records/Reports Facility Site Review Effluent/Receiving Wate Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) Colleen Cohn of Inspector(s) Agency/Office/Phone and Fax Numbers Date -DocuSignedby: DWR/RRO WQ/919-791-4258/ f //lam 11/1/2022 '-F13CB8277092044D... Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date DocuSigned by: 1 \fAit UutAhla, 11/1/2022 EPA Form 3-60 q290 4$41Previous editions are obsolete. Page# 1 DocuSign Envelope ID: 943EC068-268B-418F-BB6F-962C10606A67 31 NPDES yr/mo/day N C 0043257 I11 121 22/0 7/ 18 17 Inspection Type 18LI (Cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) On July 18, 2022, Colleen Cohn of the Raleigh Regional Office (RRO) conducted an inspection at the subject facility. The cooperation of Peter Salisbury, Operator in Responsible Charge (ORC) of the facility, was greatly appreciated. Findings during the inspection were as follows: 1. The current NPDES permit was issued effective on November 1, 2021 and will expire on April 30, 2026. 2. The 0.04 MGD treatment plant consists of an influent pump station, equalization basin, flow splitter box, aeration basins, dual clarifiers, aerobic sludge digesters, effluent chlorination, dechlorination, and flow monitoring. 3. The plant discharges to Cub Creek [16-41-2-10-(0.5)] which is classified as WS-IV;NSW waters in the Cape Fear River Basin. 4. The field parameters performed by the operator are pH and Dissolved Oxygen. Enco Laboratories performs analysis for all other permitted parameters. 5. A cursory review of laboratory data and discharge monitoring report (DMR) data for July 2021 and January 2022 showed one typo for the weekly composite TSS value for July 15, 2021. Please revise the eDMR values for TSS for the week of July 15, 2021. 6. A cursory review of DMR data for July 2021 and January 2022 showed a monthly average for Ammonia (NH3) as N in January 2022. The monthly average was 7.825 mg/L which exceeds the permit limit of 5.2 mg/L for the period of November 1 - March 31. A cursory review of data from July 2018 to July 2022 showed that the facility has had ten (10) Monthly Average Exceedances for Nitrogen, Ammonia. Within 30-days receipt of this letter, please provide a written response to this office outlining the Nature Trails Association CLP's efforts to analyze and/or investigate the cause for Nitrogen, Ammonia exceedances. 7. The facility has two equalization basins. The housing for both equalization basins appeared to be heavily corroded. The air pipe to one of the basins was rusted through and inoperable. Within 30-days receipt of this letter, please provide a written response to this office outlining the schedule you will take or have taken to repair the equalization basins and aeration system. 8. The dual clarifiers appeared to be operating satisfactorily. Effluent from the clarifier in Plant 1 was clear with minimal algae, and effluent from the clarifier in Plant 2 was slightly cloudy with some algae. 9. The aerobic sludge digesters appeared to be operating satisfactorily. Mr. Salisbury stated that the digesters hold approximately 12,000 gallons total and that 10,000 gallons of sludge are hauled by Granville Farms approximately every 1.5 months. 10. The liquid disinfection and tablet dechlorination systems appeared to be operating satisfactorily. 11. The digital flow meter and chart recorder were not working during the inspection. Mr. Salisbury stated that they stopped working over the weekend and a maintenance request had been submitted. Within 30-days receipt of this letter, please provide a written response to this office outlining the schedule you will take or have taken to repair the digital flow meter and chart recorder. 12. The effluent flow meter was calibrated on August 24, 2021. 13. Mr. Salisbury stated he did not believe the onsite diesel generator is working. Within 30-days receipt of this letter, please provide a written response to this office outlining the schedule you will take or have taken to repair the onsite diesel generator. Please also include information regarding Page# 2 DocuSign Envelope ID: 943EC068-268B-418F-BB6F-962C10606A67 Permit: NC0043257 Inspection Date: 07/18/2022 Owner - Facility: Nature Trails Mobile Home Park WWTP Inspection Type: Compliance Evaluation the onsite diesel generator's maintenance and testing schedule. 14. The effluent discharge was clear and free of excess solids and foam at the time of the inspection. No detrimental impacts to Cub Creek were observed. 15. A daily operator logbook was readily available for review. Please respond in writing to items 5, 6, 7, 11, and 13 within 30 days of receipt of this letter describing how these items have been resolved. Page# 3 DocuSign Envelope ID: 943EC068-268B-418F-BB6F-962C10606A67 Permit: NC0043257 Inspection Date: 07/18/2022 Owner - Facility: Nature Trails Mobile Home Park WWTP Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? • ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ � ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: Clean, but lots of rust and corrosion noted Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ � ❑ application? Is the facility as described in the permit? • ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ • ❑ ❑ Is access to the plant site restricted to the general public? • ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? • ❑ ❑ ❑ Comment: Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? • ❑ ❑ ❑ Is all required information readily available, complete and current? • ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? • ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? • ❑ ❑ ❑ Is the chain -of -custody complete? • ❑ ❑ ❑ Dates, times and location of sampling • Name of individual performing the sampling • Results of analysis and calibration • Dates of analysis • Name of person performing analyses • Transported COCs ■ Are DMRs complete: do they include all permit parameters? • ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ ❑ • (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified ❑ ❑ • ❑ operator on each shift? Is the ORC visitation log available and current? • ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? • ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility ❑ ❑ ❑ • classification? Page# 4 DocuSign Envelope ID: 943EC068-268B-418F-BB6F-962C10606A67 Permit: NC0043257 Inspection Date: 07/18/2022 Owner - Facility: Nature Trails Mobile Home Park WWTP Inspection Type: Compliance Evaluation Record Keeping Is a copy of the current NPDES permit available on site? Facility has copy of previous year's Annual Report on file for review? Comment: Pump Station - Influent Is the pump wet well free of bypass lines or structures? Is the wet well free of excessive grease? Are all pumps present? Are all pumps operable? Are float controls operable? Is SCADA telemetry available and operational? Is audible and visual alarm available and operational? Comment: Equalization Basins Is the basin aerated? Is the basin free of bypass lines or structures to the natural environment? Is the basin free of excessive grease? Are all pumps present? Are all pumps operable? Are float controls operable? Are audible and visual alarms operable? # Is basin size/volume adequate? Yes No NA NE • ❑ ❑ ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE ❑ • ❑ ❑ • ❑ ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ • Comment: Two EQ basins. Both show heavy corrosion. Air supply to one not functional at all, and the other was somewhat operational. Difficult to evaluate. Secondary Clarifier Is the clarifier free of black and odorous wastewater? Is the site free of excessive buildup of solids in center well of circular clarifier? Are weirs level? Is the site free of weir blockage? Is the site free of evidence of short-circuiting? Is scum removal adequate? Is the site free of excessive floating sludge? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ❑ • • ❑ ❑ ❑ ▪ ❑ ❑ ❑ Page# 5 DocuSign Envelope ID: 943EC068-268B-418F-BB6F-962C10606A67 Permit: NC0043257 Inspection Date: 07/18/2022 Owner - Facility: Nature Trails Mobile Home Park WWTP Inspection Type: Compliance Evaluation Secondary Clarifier Yes No NA NE Is the drive unit operational? Is the return rate acceptable (low turbulence)? Is the overflow clear of excessive solids/pin floc? Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) Comment: • ❑ ❑ ❑ Aeration Basins Yes No NA NE Mode of operation Ext. Air Type of aeration system Diffused Is the basin free of dead spots? ■ ❑ ❑ ❑ Are surface aerators and mixers operational? El El • ❑ Are the diffusers operational? El El El • Is the foam the proper color for the treatment process? • El ❑ ❑ Does the foam cover less than 25% of the basin's surface? • El El El Is the DO level acceptable? El El ❑ • Is the DO level acceptable?(1.0 to 3.0 mg/I) El El El • Comment: Audible air leak evident Disinfection -Liquid Is there adequate reserve supply of disinfectant? (Sodium Hypochlorite) Is pump feed system operational? Is bulk storage tank containment area adequate? (free of leaks/open drains) Is the level of chlorine residual acceptable? Is the contact chamber free of growth, or sludge buildup? Is there chlorine residual prior to de -chlorination? Comment: Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ❑ • De -chlorination Yes No NA NE Type of system ? Tablet Is the feed ratio proportional to chlorine amount (1 to 1)? El El El • Is storage appropriate for cylinders? El ❑ • ❑ # Is de -chlorination substance stored away from chlorine containers? El El ❑ ❑ Page# 6 DocuSign Envelope ID: 943EC068-268B-418F-BB6F-962C10606A67 Permit: NC0043257 Inspection Date: 07/18/2022 Owner - Facility: Nature Trails Mobile Home Park WWTP Inspection Type: Compliance Evaluation De -chlorination Yes No NA NE Comment: Are the tablets the proper size and type? ❑ ❑ ❑ • Are tablet de -chlorinators operational? • ❑ ❑ ❑ Number of tubes in use? 2 Comment: Standby Power Yes No NA NE Is automatically activated standby power available? • ❑ ❑ ❑ Is the generator tested by interrupting primary power source? ❑ ❑ ❑ • Is the generator tested under load? ❑ ❑ ❑ ■ Was generator tested & operational during the inspection? ❑ • ❑ ❑ Do the generator(s) have adequate capacity to operate the entire wastewater site? ❑ ❑ ❑ • Is there an emergency agreement with a fuel vendor for extended run on back-up ❑ ❑ ❑ ■ power? Is the generator fuel level monitored? ❑ ❑ ❑ ■ Comment: Another party responsible for testing generator. Mr. Salisbury does not believe it works. Effluent Pipe Is right of way to the outfall properly maintained? Are the receiving water free of foam other than trace amounts and other debris? If effluent (diffuser pipes are required) are they operating properly? Comment: Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ • ❑ Page# 7