HomeMy WebLinkAbout20220937 Ver 2_Provisional RGP 80 Verification_20221021Strickland, Bev
From: Norton, April R CIV USARMY CESAW (USA) <April.R.Norton@usace.army.mil>
Sent: Friday, October 21, 2022 11:57 AM
To: conceptcontractdesign@gmail.com
Cc: Cohn, Colleen M
Subject: [External] Provisional RGP 80 Verification, SAW-2022-02249, Riley Waterfront: 683
Sagamore Drive
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Dear Shaun Liggett,
This is a provisional general permit verification. Your proposed work may be authorized by the above referenced general
permit provided a 401 Certification is issued or waived. Once a 401 Certification is issued or waived, the Corps will
provide you with a final general permit verification. Your proposed work shall not commence until after the 401
Certification has been issued or waived and until a final general permit verification has been provided to you. Additional
special conditions may be added to the final general permit verification.
Please contact me if you have any questions regarding this provisional verification or the Corps of Engineers regulatory
program.
April R. Norton
Regulatory Division
US Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 441-3637
Fax: (919) 562-0421
Email: April.R.Norton@usace.army.mil
1