Loading...
HomeMy WebLinkAbout20220940 Ver 1_More Info Received_20220927Strickland, Bev From: Harbour, Jeff W <Jeff.Harbour@terracon.com> Sent: Tuesday, September 27, 2022 2:08 PM To: Kevin Varnell; Hopper, Christopher D CIV USARMY CESAW (USA); Cohn, Colleen M Subject: RE: [URL Verdict: Neutral][Non-DoD Source] FW: [External] RE: Project #: 20220940 Ver 1 The Laurel SAW-2021-02032 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Chris, I feel as though that stream will have baseflow throughout most of the year Jeff Harbour, PWS Senior Scientist I Natural Resources 2401 Brentwood Road, Suite 107 I Raleigh, NC 27604 D (919) 547-1080 I M (919) 805-4208 jeff.harbour©terracon.com I Terracon.com 1 From: Kevin Varnell <kvarnell@stocksengineering.com> Sent: Tuesday, September 27, 2022 2:01 PM To: Harbour, Jeff W <Jeff.Harbour@terracon.com>; Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil>; Cohn, Colleen M <colleen.cohn@ncdenr.gov> Subject: RE: [URL Verdict: Neutral][Non-DoD Source] FW: [External] RE: Project #: 20220940 Ver 1 The Laurel SAW-2021- 02032 Jeff, Yes. If there is any base flow, we will have to use a pump around operation which would maintain the flow downstream. By building the coffer dam, there will be no running water through the work area which would eliminate any sediment downstream. Sincerely, J. K.eV v var&eLL ENGINEERING �.MLL1 N S11 RLE. N.C. 27855 1 Our Competitive Advantage We build long term relationships with our clients by being Creative, Personable, Accessible, Responsive, and Knowledgeable. From: Harbour, Jeff W <Jeff.Harbour@terracon.com> Sent: Tuesday, September 27, 2022 1:15 PM To: Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil>; Kevin Varnell <kvarnell@stocksengineering.com>; Cohn, Colleen M <colleen.cohn@ncdenr.gov> Subject: RE: [URL Verdict: Neutral][Non-DoD Source] FW: [External] RE: Project #: 20220940 Ver 1 The Laurel SAW-2021- 02032 10-4. Kevin? Jeff Harbour, PWS Senior Scientist I Natural Resources 2401 Brentwood Road, Suite 107 I Raleigh, NC 27604 D (919) 547-1080 I M (919) 805-4208 jeff.harbour©terracon.com I Terracon.com From: Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil> Sent: Tuesday, September 27, 2022 1:13 PM To: Harbour, Jeff W <Jeff.Harbour@terracon.com>; Kevin Varnell <kvarnell@stocksengineering.com>; Cohn, Colleen M <colleen.cohn@ncdenr.gov> Subject: RE: [URL Verdict: Neutral][Non-DoD Source] FW: [External] RE: Project #: 20220940 Ver 1 The Laurel SAW-2021- 02032 I should add that there is still no guarantee. They may still request surveys — I'm just trying to minimize the potential. Christopher D. Hopper Regulatory Specialist U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 0: (919) 554-4884, Ext. 35 M: (919) 588-9153 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey can be accessed by copying and pasting the following link into your web browser: https://regulatory.ops.usace.army.mil/customer-service-survey/. Thank you for taking the time to visit this site and complete the survey. 2 From: Harbour, Jeff W <Jeff.Harbour@terracon.com> Sent: Tuesday, September 27, 2022 1:06 PM To: Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil>; Kevin Varnell <kvarnell@stocksengineering.com>; Cohn, Colleen M <colleen.cohn@ncdenr.gov> Subject: RE: [URL Verdict: Neutral][Non-DoD Source] FW: [External] RE: Project #: 20220940 Ver 1 The Laurel SAW-2021- 02032 I believe it would, however, would it be preferable to use the silt bags and maintain some discharge in lieu of stopping flow with a cofferdam? Jeff Harbour, PWS Senior Scientist I Natural Resources 2401 Brentwood Road, Suite 107 I Raleigh, NC 27604 D (919) 547-1080 I M (919) 805-4208 jeff.harbour©terracon.com I Terracon.com From: Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil> Sent: Tuesday, September 27, 2022 12:41 PM To: Kevin Varnell <kvarnell@stocksengineering.com>; Harbour, Jeff W <Jeff.Harbour@terracon.com>; Cohn, Colleen M <colleen.cohn@ncdenr.gov> Subject: RE: [URL Verdict: Neutral][Non-DoD Source] FW: [External] RE: Project #: 20220940 Ver 1 The Laurel SAW-2021- 02032 Thanks, Kevin: I'll run with this. For context though (and its USFWS, not us), the concerns are two -fold. First is containing any potential sediment. Second is maintaining hydration of any potentially suitable areas downstream. Jeff — you know the area pretty well. Would you feel confident the stream would continue to flow downstream during installation? Christopher D. Hopper Regulatory Specialist U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 0: (919) 554-4884, Ext. 35 M: (919) 588-9153 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey can be accessed by copying and pasting the following link into your web browser: https://regulatory.ops.usace.army.mil/customer-service-survey/. Thank you for taking the time to visit this site and complete the survey. 3 From: Kevin Varnell <kvarnell@stocksengineering.com> Sent: Tuesday, September 27, 2022 10:36 AM To: Harbour, Jeff W <Jeff.Harbour@terracon.com>; Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil>; Cohn, Colleen M <colleen.cohn@ncdenr.gov> Subject: RE: [URL Verdict: Neutral][Non-DoD Source] FW: [External] RE: Project #: 20220940 Ver 1 The Laurel SAW-2021- 02032 Jeff, The stream crossing will likely not be able to be performed in the dry unless the base flow is very low during implementation. The current plan would be to place a coffer dam upstream of the work area and allow the stream to back up during the installation. The pipe section should be able to be completely laid in one day. If the base flows are too high to allow the water to back up, the stream flows will be pumped through silt bag and allowed to discharge below the work area. The pipe and wingwalls should be able to be installed in no more than 2 working days. Let me know if you need anything else from me on this. Sincerely, J. K.eV v var&eLL ENGINEERING So1 £h51' WASHINGTON STREET •.hSr:^ I r. N.C. 27855 A'Mk ' Our Competitive Advantage We build long term relationships with our clients by being Creative, Personable, Accessible, Responsive, and Knowledgeable. From: Harbour, Jeff W <Jeff.Harbour@terracon.com> Sent: Tuesday, September 27, 2022 9:38 AM To: Kevin Varnell <kvarnell@stocksengineering.com>; Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil>; Cohn, Colleen M <colleen.cohn@ncdenr.gov> Subject: FW: [URL Verdict: Neutral][Non-DoD Source] FW: [External] RE: Project #: 20220940 Ver 1 The Laurel SAW- 2021-02032 Kevin, Can you answer Chris's question? Thx Jeff Harbour, PWS Senior Scientist I Natural Resources 2401 Brentwood Road, Suite 107 I Raleigh, NC 27604 D (919) 547-1080 I M (919) 805-4208 jeff.harbour©terracon.com I Terracon.com 4 tly Ell 0 ICI From: Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil> Sent: Tuesday, September 27, 2022 9:29 AM To: Harbour, Jeff W <Jeff.Harbour@terracon.com>; Cohn, Colleen M <colleen.cohn@ncdenr.gov> Cc: Kevin Varnell <kvarnell@stocksengineering.com> Subject: RE: [URL Verdict: Neutral][Non-DoD Source] FW: [External] RE: Project #: 20220940 Ver 1 The Laurel SAW-2021- 02032 Jeff: I'm writing up the project description for USFWS. It typically helps if I can say that if work cannot be done in the dry, a stream pump -around or similar means of protecting downstream reaches during construction would be employed. I should have asked this initially — but does this project propose anything like that? Christopher D. Hopper Regulatory Specialist U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 0: (919) 554-4884, Ext. 35 M: (919) 588-9153 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey can be accessed by copying and pasting the following link into your web browser: https://regulatory.ops.usace.army.mil/customer-service-survey/. Thank you for taking the time to visit this site and complete the survey. From: Harbour, Jeff W <Jeff.Harbour@terracon.com> Sent: Tuesday, September 27, 2022 8:51 AM To: Cohn, Colleen M <colleen.cohn@ncdenr.gov>; Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil> Cc: Kevin Varnell <kvarnell@stocksengineering.com> Subject: [URL Verdict: Neutral][Non-DoD Source] FW: [External] RE: Project #: 20220940 Ver 1 The Laurel SAW-2021- 02032 Colleen and Chris, Just wanted to check in on this review. The attached requested info was submitted on 9-6. Any update is appreciated. Thanks Jeff Harbour, PWS Senior Scientist I Natural Resources 2401 Brentwood Road, Suite 107 I Raleigh, NC 27604 D (919) 547-1080 I M (919) 805-4208 jeff.harbour©terracon.com I Terracon.com 5 tor ® t w'J CI From: Harbour, Jeff W Sent: Tuesday, September 20, 2022 2:02 PM To: Cohn, Colleen M <colleen.cohn@ncdenr.gov>; Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil> Cc: Kevin Varnell <kvarnell@stocksengineering.com>; Cynthia (Cindy) Szwarckop <cszwarckop@drbgroup.com> Subject: RE: [External] RE: Project #: 20220940 Ver 1 The Laurel SAW-2021-02032 Colleen and Chris, Just wanted to check in on this review. The attached requested info was submitted on 9-6. Any update is appreciated. Thanks Jeff Harbour, PWS Senior Scientist I Natural Resources 2401 Brentwood Road, Suite 107 I Raleigh, NC 27604 D (919) 547-1080 I M (919) 805-4208 jeff.harbour©terracon.com I Terracon.com NM I From: Harbour, Jeff W Sent: Tuesday, September 6, 2022 4:32 PM To: Cohn, Colleen M <colleen.cohn@ncdenr.gov>; Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil> Cc: Kevin Varnell <kvarnell@stocksengineering.com>; Cynthia (Cindy) Szwarckop <cszwarckop@drbgroup.com> Subject: RE: [External] RE: Project #: 20220940 Ver 1 The Laurel SAW-2021-02032 Colleen, Please see the responses to your questions below and attached. 1. SOA attached 2. We did not proposed a rip rap dissipator since the pipe was buried 12". There will be some rip rap inside the wing wall area but not 20 feet downstream. 3. Cross Section of the Culvert is shown on Sheet CE-04 4. Approved JoCo Buffer Permit attached. Let me know if you have further questions. Thank you Jeff Harbour, PWS Senior Scientist I Natural Resources 6 2401 Brentwood Road, Suite 107 I Raleigh, NC 27604 D (919) 547-1080 I M (919) 805-4208 jeff.harbour©terracon.com I Terracon.com 3 Ell 0 CS From: Cohn, Colleen M <colleen.cohn@ncdenr.gov> Sent: Tuesday, September 6, 2022 10:46 AM To: Harbour, Jeff W <Jeff.Harbour@terracon.com>; Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil> Cc: Kevin Varnell <kvarnell@stocksengineering.com>; Cynthia (Cindy) Szwarckop <cszwarckop@drbgroup.com> Subject: RE: [External] RE: Project #: 20220940 Ver 1 The Laurel SAW-2021-02032 Hi Jeff, 1' beginning my review, and in order to complete the review, some additional information is required: 1. A Statement of Availability from a private mitigation bank was not included for the 0.389ac of wetlands impacts. Please provide a Statement of Availability. [15A NCAC 02H .0502(c)] 2. Does the 106 linear feet of stream impact include a rip rap dissipator? [15A NCAC 02H .0502(c)] 3. Please provide a cross section of the culvert. [15A NCAC 02H .0502(c)] 4. It appears that this parcel falls under Johnston County's delegated authority for Neuse Riparian Buffers. Please provide confirmation that buffer impacts will be submitted to Johnston County for authorization or supporting documentation that this project is outside of Johnston County's delegated authority. [15A NCAC 02H .502(c)] Colleen Cohn Environmental Specialist II North Carolina Department of Environmental Quality Division of Water Resources Raleigh Regional Office 380o Barrett Drive Raleigh, NC 27609 Office: 919-791-4258 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Harbour, Jeff W <Jeff.Harbour@terracon.com> Sent: Friday, September 2, 2022 11:08 AM To: Cohn, Colleen M <colleen.cohn@ncdenr.gov>; Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil> Cc: Kevin Varnell <kvarnell@stocksengineering.com>; Cynthia (Cindy) Szwarckop <cszwarckop@drbgroup.com> Subject: [External] RE: Project #: 20220940 Ver 1 The Laurel SAW-2021-02032 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Colleen and Chris, Just checking in with you about this review. 7 Thanks Jeff Harbour, PWS Senior Scientist I Natural Resources 2401 Brentwood Road, Suite 107 I Raleigh, NC 27604 D (919) 547-1080 I M (919) 805-4208 jeff.harbour©terracon.com I Terracon.com From: Harbour, Jeff W Sent: Thursday, August 25, 2022 2:18 PM To: Cohn, Colleen M <colleen.cohn@ncdenr.gov>; Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil> Cc: Kevin Varnell<kvarnell@stocksengineering.com>; Cynthia (Cindy) Szwarckop <cszwarckop@drbgroup.com> Subject: Project #: 20220940 Ver 1 The Laurel SAW-2021-02032 Colleen and Chris Just wanted to check with you since the DWR PN period has ended and the RAI questions have been submitted back to you Thanks!!! Jeff Harbour, PWS Senior Scientist I Natural Resources 2401 Brentwood Road, Suite 107 I Raleigh, NC 27604 D (919) 547-1080 I M (919) 805-4208 jeff.harbour©terracon.com I Terracon.com i 10 ET, CO 8