Loading...
HomeMy WebLinkAboutNC0005312_compliance (DMR waiver request)_20221028Via E-Mail October 28, 2022 North Carolina Department of Environmental Quality Division of Water Resources Water Quality Permitting Section - NPDES 1617 Mail Service Center Raleigh, NC 27699-1617 Attn: Mr. Douglas Dowden Re: Permit Parameters Waiver Request Elkin Mill WWTP 304 East Main Street Elkin, Surry County, NC NPDES Permit No. NC0005312 H&H Job No. VCP-002 Dear Mr. Dowden: 1.0 Introduction hart '1%. hickman SMARTER ENVIRONMENTAL SOLUTIONS On behalf of Duvaltex US, Inc (Duvaltex), Hart & Hickman, PC (H&H) is submitting this letter report to request that NPDES Permit No. NC0005312 (NPDES Permit) be set to an inactive status and that certain parameters of the NPDES Permit be waived for the Elkin Mill wastewater treatment plant (WWTP) located at 304 East Main Street in Elkin, Surry County, North Carolina. A Site Location Map is provided as Figure 1 and a Site Map showing the WWTP layout is provided as Figure 2. Duvaltex formerly leased a textile manufacturing facility and WWTP in Elkin, NC. The textile manufacturing facility ceased operations in 2019 and no longer leases the properties. However, Duvaltex has continued to operate the WWTP to satisfy the permit parameters. The facility previously finished woven upholstery fabric from primarily manmade and some natural fibers. Previous operations included fabric finishing, yarn extrusion, and limited weaving for sample 2923 South Tryon Street, Suite 100 Charlotte, NC 28203 704.586.0007 main 3921 Sunset Ridge Rd , Suite 301 Raleigh, NC 27607 919.847.4241 main www.harthickman.com Mr. Douglas Dowden October 28, 2022 Page 2 #C1269 - Engineering #245 - Geology fabrics. Influent to the WWTP historically consisted of wastewater produced by manufacturing operations and sanitary sewer from the manufacturing facility. The WWTP components related to water discharge include: • Equalization (EQ) basin; • Aeration basin; • Dual clarifiers; • Chlorine contact chamber; and • Post -chlorination aeration tank. The current NPDES permit NC0005312 was reissued on February 5, 2018 to reflect the transfer of the permit to Duvaltex from True Elkin, Inc. Duvaltex submitted a Permit Renewal Application dated June 11, 2018. A permit renewal receipt letter dated June 19, 2018 was issued by the North Carolina Department of Environmental Quality Division of Water Resources (DWR) stating that the permit renewal application was received and that Duvaltex should continue to operate under the existing permit until a new permit is issued. On May 30, 2019, Duvaltex ceased production at the facility, which eliminated the process wastewater discharges to the WWTP. By letter dated December 4, 2019, Duvaltex tendered the WWTP to its owner (i.e., James A Ovenden, Trustee of CMI Industries, Inc.) pursuant to the lease between the Trustee and True Textiles, Inc. dated June 15, 2007, as amended May 22, 2013. The Trustee refuses to take back the WWTP and operate or close the WWTP. As result of that refusal, Duvaltex has been forced to undertake and/or coordinate work to reduce flow to the WWTP. Since 2019, sanitary sewer from Mill property buildings that would continue to be used were connected to the Yadkin Valley Sewer Authority (YVSA) sanitary sewer system. In addition, the current owner of the Mill property continues to work to eliminate further discharge through repairs to various stormwater conveyances pursuant to the governing Brownfields Agreement. Mill property stormwater system repairs have reduced the flow of stormwater infiltrating process sewer piping and flowing to the WWTP. Currently, the influent flow has reduced; however, it currently appears 11 hart hickman https://harthick.sharepoint.com/sites/MasterFiles-1/Shared Documents/AAA-Master Projects/DuvalTex (VCP-002)/WWTP Closure Evaluation/Permit 11W- Waiver Request Letter/202210 Revision/NC0005312_ Waiver _ Request_ 20221028_FINAL.docx SMARTER ENVIRONMENTAL SOLUTIONS Mr. Douglas Dowden October 28, 2022 Page 3 #C1269 - Engineering #245 - Geology that some stormwater and groundwater infiltrate process sewer piping and flow to the WWTP during heavy rainfall events. The influent pumps that pump to the EQ basin remain active; however, the float switch has been raised within the sump to only activate during periods of heavy rainfall to prevent an overflow of the adjacent manhole. As of October 19, 2022, Duvaltex has dewatered the WWTP structures to the extent practical and discharged through the permitted outfall. Ms. Jenny Graznak and Mr. Lon Snider of the North Carolina Department of Environmental Quality (DEQ) visited the WWTP on October 20, 2022 and concurred that sufficient freeboard exists within the WWTP to prevent a discharge and that the NPDES permit could be placed in an inactive status. As part of placing the NPDES permit in an inactive status, Duvaltex is requesting to waive certain parameters of the NPDES permit, which are discussed in Section 2.0 below. 2.0 Permit Parameters Waiver Duvaltex is requesting a waiver of the following permit parameters: 1. Certified Operator Visitation — Under the current permit, a Grade 4 Operator in Responsible Charge (ORC) is to visit the facility at least 5 days a week and manage and document daily operation and maintenance of the facility. Currently, Duvaltex employs a Grade 4 ORC at the WWTP. The full-time employment of a Grade 4 ORC to operate an inactive WWTP is a significant and unnecessary financial burden. As part of this request to place the NPDES permit into inactive status, Duvaltex requests that the ORC visitation requirement under the permit be waived. 2. Electronic Reporting of Discharge Monitoring Reports — Under the current permit, Discharge Monitoring Reports (DMRs) are to be submitted monthly through the DWR's Electronic Discharge Monitoring Report internet application. As described in Section 3.0, a monitoring program will be implemented to ensure no discharge will occur from the https://harthick.sharepoint.com/sites/MasterFiles-1/Shared Documents/AAA-Master Projects/DuvalTex (VCP-002)/WWTP Closure Evaluation/Permit Waiver Request Letter/202210 Revision/NC0005312_ Waiver _ Request_ 20221028_FINAL.docx hart hickman SMARTER ENVIRONMENTAL SOLUTIONS Mr. Douglas Dowden October 28, 2022 Page 4 #C1269 - Engineering #245 - Geology WWTP while in inactive status. Therefore, monthly submittals of DMRs indicating no flow is unnecessary and Duvaltex requests a waiver of DMR submittals. 3.0 Proposed Monitoring Program Following approval of this waiver request, Duvaltex will implement a monitoring program to monitor the accumulation of rainwater within the WWTP and ensure no overflow or inadvertent discharge through Outfall 001 will occur. Monitoring activities will include measuring depth to ponded rainwater in each WWTP structure and documenting the condition of each WWTP structure. An environmental or wastewater consulting firm will be contracted to complete monitoring activities. Monitoring will occur monthly to establish WWTP accumulation patterns. Should a large rainfall event occur (greater than 1 inch), the contractor will be dispatched to evaluate conditions at the WWTP. Following six months of monitoring and determination of the correlation between rainfall and WWTP structure water levels, the rainfall action level and site visit frequency may be adjusted. The contractor will record the water levels in each WWTP structure in relation to its overflow outlet, record rainfall accumulation for the area based on a local weather station (National Weather Service Station 312740 or similar), and take photographs of the WWTP structures. Should the water level in the WWTP rise to a level that could potentially cause a discharge, the water will be pumped to the EQ basin. If the EQ basin does not have sufficient capacity, the water will be removed for proper off -site disposal by a waste contractor. https://harthick.sharepoint.com/sites/MasterFiles-1/Shared Documents/AAA-Master Projects/DuvalTex (VCP-002)/WWTP Closure Evaluation/Permit Waiver Request Letter/202210 Revision/NC0005312_ Waiver _ Request_ 20221028_FINAL.docx hart hickman SMARTER ENVIRONMENTAL SOLUTIONS Mr. Douglas Dowden October 28, 2022 Page 5 #C1269 - Engineering #245 - Geology If you have any questions or require additional information, please do not hesitate to contact me at (919) 847-4241. Sincerely, Hart & Hickman, PC Gregory Kanellis, PE Project Manager cc: Attachments Sergei Chernikov, DEQ (via email) Jenny Graznak, DEQ (via email) Lon Snider, DEQ (via email) Peter Paine, Duvaltex (via email) Amy Conner, Duvaltex (via email) Alex Elkan, Counsel for Duvaltex (via email) Daniel Smith, Counsel for Duvaltex (via email) https://harthick.sharepoint.com/sites/MasterFiles-1/Shared Documents/AAA-Master Projects/DuvalTex (VCP-002)/WWTP Closure Evaluation/Permit Waiver Request Letter/202210 Revision/NC0005312_ Waiver _ Request_ 20221028_FINAL.docx hart hickman SMARTER ENVIRONMENTAL SOLUTIONS Figure 1 Site Location Map 0 APPROXIMATE 2000 4000 SITE LOCATION MAP TITLE SCALE IN FEET PROJECT U.S.G.S. QUADRANGLE MAP ELKIN SOUTH, NORTH CAROLINA, 1996 QUADRANGLE 7.5 MINUTE SERIES (TOPOGRAPHIC) DUVALTEX (US), INC. ELKIN FACILITY 304 EAST MAIN STREET ELKIN, NORTH CAROLINA li hart hickman SMARTER ENVIRONMENTAL SOLUTIONS 2923 South Tryon Street -Suite 100 Charlotte, North Carolina 28203 704-586-0007 (p) 704-586-0373 (f) DATE: 5-12-22 REVISION NO: 0 JOB NO: VCP-002 FIGURE NO: 1 Figure 2 Site Map FIG 2, 5/12/2022 2:2 S:\AAA-Master Projects \DuvalTex (VCP-002)\Figures \Site Map.d HIGHWAY 268) .•.•**.**.*,::*•.**.*,,... Ci• EE (N• ,,..,,. • MAIN gTR ,,.. EAST i •..' ,Y.:••..•,,.. YApyUN RIVER CLARIFIERS OUTFALL 001 WWTP FEATURE - CHLORINE CONTACT CHAMBER AND POST -AERATION CHAMBER DRYING BEDS 0 LEGEND SITE PROPERTY BOUNDARY PARCEL LINE PROCESS SEWER LINE APPROXIMATE 120 240 SCALE IN FEET SITE MAP '''°JE`T DUVALTEX (US), INC. ELKIN FACILITY 304 EAST MAIN STREET ELKIN, NORTH CAROLINA hart hickman SMARTER ENVIRONMENTAL SOLUTIONS 2923 South Tryon Street -Suite 100 Charlotte, North Carolina 28203 704-586-0007(p)704-586-0373(f) License # C-1269 / #C-245 Geology REVISION NO. 0 FIGURE NO. 2