HomeMy WebLinkAbout20211721 Ver 2_U-4015A Permit Permit Drawings_20221101North Carolina Department of Transportation // 1
5101'nitVHtCi'- Highway Stormwater Program
STORMWATER MANAGEMENT PLAN I
(Version 2.08; Released April 2018) FOR NCDOT PROJECTS
WBS Element: 35013.1.1 TIP No.: UAD15A Coun (ies): Guilford le— 1 of 1
General Project Information
WBS Element:
35013.1.1 ITIP Number: U-4015A
Project Type: Roadwa Widenin Date: 9/27/2022
NCDOT Contact:
Erik Seller, PE
Contractor /Designer:
Trent Cormier, PE
Address:
1202 Birch Ridge Drive
Raleigh, NC 27610
Address:
8601 Six Forks Road (Forum 1)
Suite 700
Raleigh, NC 27615
Phone:
919 707-6757
Phone:
984 238-7226
Email:
eoseileKrLncdat.gov
Email'
Ammar ar rkk.com
City/Tow:
Greensboro/Hi
h Point
Coun ies :
Guilford
River Basins :
Cape Fear
CAMA Countp
No
Wetlands within Project Limits?
Yes
Project Description
Project Length (lin. miles or feet):
1,057 MI SurroundingLand Use: Industrial, Farmland
Proposed Project
Existing Site
Project Built -Upon Area so.
9.5 so.
12.6 ac.
Typical Cross Section Description:
Typical cross-section consists of five 12' lanes with a center turn lane along the condor
and varinR locations of sidewalks and shoulders.
Typical cross-section is currently two to three lanes - 12.5'. Concrete median island -
13'+/-towards the end of the project,
Annual Avg Daily Traffic (veh/hr/day):
Design/Future: 18,800 Year 2024
Existing: 15,900 Year: 2018
General Project Narrative:
(Description of Minimization of Water
Quality Impacts)
Widen and improve Gallimore Diary Road (SR 1556)from NC 68 to Airpark Drive. This section of road Is currently two to three lanes and will be widened to five lanes. The
typical section includes five 12' lanes with a center turn lane along the corridor. The shoulders and sidewalks will vary along the condor. The jurisdictional streams within the
study area have biological impairments (benthos) and are listed on the draft 2020 303d list.
Design Mitigations for streams include:
1. Steepening of roadway fill slopes within jurisdictional areas.
2. Stormwater was designed to avoid direct discharge intojurisdictlonal features to maximum extent practicable.
3. Stormwater design velocitiesentering jurisdictional features have been mitigated to be non -erosive (less than 2 fps).
4. Open shoulder sections were maximized to promote sheet Flow from the roadway.
5. Diffuse flow provided at outlets that do not have a well defined ouffall.
6. Dissipater pads are provided in buffers at pipe outlets where channel change occurs.
Waterbody Information
Surface Water Body (1): East Fork Deep River
NCDWR Stream Index No.:
17-240.3
NCDWR Surface Water Classification for Water Body
Prima Classification:
Water Supply IV WS-IV
Supplemental Classification:
None
Other Stream Classification:
None
Impairments:
biological impairment
Aquatic T&E Species?
No Comments:
NRTR Stream ID: JEast
Fork Deep River
Buffer Rules in Effect: Randleman Lake
Project Includes Bridge Spanning Water Body?
INO IDeck
Drains Discharge Over Buffer? INO
Dissi ator Pads Provided in Buffer? lYes
Deck Drains Discharge Over Water Body?
INIA
(If yes, provide justification in the General Project Narrative)
I
(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative)
n1
_w•'��
s
SO
b0
?yel G1.
U
L NDTES: /
1. A PORTION OF THIS PROJECT IS WITHIN THE MUF
CLEARING ON THIS PROJECT SHALL BE PERFORMEI
GRAPIHC SCALES
DESIGN DATA
�1B3 140
is55
ADT 2018
200=15,900
AOT 204V50
MP H
PLANS
D=65%
s
'TT% DUDL=4%
PROFILE HORIZOMAL
FUND CLASS -
O51®�mo0U
o04 B
URBAN MINOR ARTERIAL
U
STATEWIDE TIER
STATE OF NORTH CAROLINA - - -4015A i
DIVISION OF HIGHWAYS
35013.1.1 ' WA 35013.2.4 WA ROW
35U13.2.5 WA UR
GUILFORD COUNTY
LOCATION.• SR 1556 (GALLIMORE DAIRY RD.) FROM NC 68
(LYNWOOD SMITH EXPY.) TO AIRPARK RD. IN GREENSBORO
TYPE OF WORT, GRADING, PAVING, WIDENING, DRAINAGE,
CULVERT, SIGNING, RETAINING WALLS,
AND SIGNALS
i� WETLAND & STREAM IMPACTS
L� PERMIT DRAWINGS
I
ROAD
3
o PERMIT DRAWING
m SHEET 1 OF 10
a GLI
V l
-YI-
5. CHIMNEY ROCK RD
R
\ /
\v/
SR 1554
GREEN POINTDRIVE
FF
SITE 2 (DISTURBED BY ADJACENT DEVELOPMENT)
AO
8
[PAL BOUNDARIES OF THE CITY OF THE CITY OF HIGH POINT.
HOD 1BORO
f0 THE LIMBS ESTABLISHED BY METHOD II.
vp1
mnRnuurs axcFNEER
PROJECT LENGTH
��
LENGTH ROADWAY TIP PROJECT U-1015A......._...
1.045 miles
rnw xoux awoa•.vn was 5n os�rw.wsrawv ev r nox
.w•nnnnsw sr,cuurms
SCOTT D. BLEVINS PE
LENGTH STRUCTURE TIP PROTECT W015A.......... 0.011 miles
��
TOTAL LENGTH OF PROJECT U-4015A...................
1.056 miles
RTG., ., WAY MT$ ewoisn cw•v°"
ROADIPAY DESIGN
05-21-2021 Z C WILSON, li
1.
ENGINSRR
LETTING LAISr noun vmuco oc
O
J3 W6L11E5I1[
O
10
M.
yq r.�r� /rPr .8/
�.K�
b ���
IE���
•e
5; 11
.�
R5�
PERMIT PAWING
I�
SHEEi R Of 10
mrweo m
F
SCALE FOR INSET
® ;
?
so zs p so iqo
G��
SCAM
to �
pM1 MfIEENf1A / i
JM%
PB
I.
ram nr uc.
1 wn umn muwuun ex r.rcn .
toO
O
O
N�
.1,,e,,, SITE 1
r,
� T t
JWAI
i
/r
b �
SHEET PSHEET 3 OF 1 G
f5® OF 10 ® of wm.wo
SCALE FOR INSET ir.ct w.nt
so ;s q m loa GLI
SCALE
to �
on a mrabmu ,
ld �ron�uaw�xma�o. ...cu i�
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size/Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
Ise)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(11)
Natural
Stream
Design
(ft)
-L- 24+03 to 25+45 LT
JB w/ MH & 54" RCP-1I I
Roadway Fill
< 0.01
153
1
-L- 25+30 to 25+89
Culvert Extension & Improvements
East Deep Fork River
0.05
< 0.01
49
11
-L- 25+15 to 26+46
Bank Stabilization
0.05
< 0.01
98
11
-L- 26+84 to 26+96 LT
Ditch Construction - WC
< 0.01
2
-Y2- 10+48 to 11+12 RT
42" RCP -IV - SC / W B
< 0.01
< 0.01
< 0.01
10
6
3
-L- 39+93 to 40+08 RT
66"/2 @ 48" RCP -IV - SD
< 0.01
< 0.01
36
1 9
TOTALS`:
< 0.01
< 0.01
0.11
0.02
346
38
0
*Rounded totals are sum of actual impacts
NOTES:
Site 1: Wetland WC will be a total take,
Site 2: Stream SC and Weiland WB have been obliterated within project limits by recent development on Parcel 14. Totals for Site 2 represent
project impacts under conditions present prior to this development.
Feb
STATE OF NORTH CAROLINA '" ""--'�_
.0 U-4015A 1
DIVISION OF HIGHWAYS
�/ asma.la µWA PE
1 35133.1 EA ROW
GREENSBORO a50ID.1,3 WA I)R
GUILFORD COUNTY
0
".END PROJECT LOCATION, SR 1556 (GALLIMORE DAIRY RD.) FROM NC 68
(LYNWOOD SMITH EXPY.) TO AIRPARK RD. IN GREENSBORO
a„
TYPE OF WORK: GRADING, PAVING, WIDENING, DRAINAGE,
Fy HIGH POINT BEGIN PROJECT 7d CULVERT SIGNING, RETAINING WALLS
U AND SIGNALS
W 6B _ __� '" g PERMIT DRAWING
14 VICINITY MAP (NTS) BUFFER IMPACTS SHEET 1 OF 5
PERMIT DRAWING /om
2 GLI
h
BEGIN TIP PROJECT U-4015A END TIP PROJECT U-4015A
-L- POT STA. 10+25.00 rSITE 3 —L— POT STA. 66+00.00
F-SITE 1 I
4 �Php 5
AO CC
�GA41MOSR G
ti. RF AIRY ROAD
40 / V I -Y2-
-YI- S. CHIMNEY ROCK RD
SR 1554
GREEN POINT DRIVE
y/Gy pSpD
/ O
2saa PF
O. .C3'pP
SITE 2 (DISTURBED BY ADJACENT DEVELOPMENT)
NOTES:
OO
C '
LA PORTION OF THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF THE CITY OF GREENSBORO a THE CITY OF HIGH POINT.
2, CLEARING DN THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
U
GRIPHlC SCALES
so j3 0 30 1Q0
DESIGN DATA
AGE 2018=15,900
ADT 2040=18,000
V=50 MPH
PROJECT LENGTH
LENGTH ROADWAY TIP PROJECT U-1015A......_....
1.045 miles
"" ° '
Ri('fCe
°`° ` , rrox
ureex�or°ru"xr ex e
mD uD ms ExcwEcx
P®
„;era u�w 1rwmu-me
SCOT D. BLENNS, PE
DHV=10%
D=65%
LENGTH STRUCTURE TIP PROJECT �015A ........... 0.011 miles
mil
UPR()f
50 ?3 4 50 loo
PROFILE (HORIZONTAL)ILSOHLEI
T=6%'
TTST=2X DUAL=d%
FLING CLASS-
URBAN MINOR ARTERIAL
STATEWIDE TIER
TOTAL LENGTH OF PROJECT U-1015A...................
1.056 miles
WGET OF IVAY Q9TS: nx ,w am..�••
°
0i21-2021 ZAC S
LRSA6 023DAT
05-16-2023 BRIAN mETNE R. PE.
r
ROaDIVAY DE.sTcv
sNGmIREx
�n
®
IIF 11Ri11<r1
O •
RgAfES LLC
WAl" SITE 1A
4
.ems.&
WC riSITE 113
w
n,A ~ �`�e\ S /f yl \ • �. `•� 11 y i ®and �� NE-�rv[ ��' -vW" _0
n1fOgSITEIA \"ems/ r/�i< ���_�-«��.._ .s �� -��'+ q ;'�•
SITE 1B
mo .ems
11111
SCAIE
® w
11,1 ' II' \ �pusoisn � .xwabxo
0
0
�ttl� I
"� \4 I 1 1 16 ILff
e�. s [ c 'I 1 \ pROfEi(XI NOI' IP I t6 L� p II'
p9UR8 EXI4/AG b j� t.
�N � i I •���.>� +�WE d �� a �� �� A yW
^' \ Y I �. & ,' ,... .......... ,.,.,................�.. [ears i
R...1 LM yb \ CR A[X1bN [4L..1
O \ :b SHEET ] Of 5
l e 0 54 140 ® uowuu wnn. mxe�
pk s®
0
RIPARIAN BUFFER IMPACTS SUMMARY
IMPACTS
Site
No.
Station
(From/To)
Structure
Size/Type
TYPE
ALLOWABLE
MITIGABLE
BUFFER
REPLACEMENT
ROAD
CROSSING
BRIDGE
PARALLEL
IMPACT
ZONE 1
(ft2)
ZONE 2
(ft)
TOTAL
(to)
ZONE 1
(ft)
ZONE 2
(ft2)
TOTAL
(ft)
ZONE 1
(ft2)
ZONE 2
(fl2)
-L- 20+21 to 24+44 RT
Easements / Road Widening
X
84
1428
1512
1 A
-L- 24+03 to 24+87 LT
3B w/ MH & 54" RCP -III
Roadway Fill
X
2806
1616
4422
1 B
-L- 24+44 to 27+43
Culvert Extension & Improvements
East Deep Fork River
X
11748
6993
18741
2
-Y2-10+48. to 11+12 RT
42" RCP -IV
X
3493
1641
5134
3
-L-39+38 to 40+52 RT
66"/2 @ 48" RCP -IV
X
2226
1533
3759
TOTALS*:
17468
10167
27635
2890
3044
6934
0
0
NOTES:
Stream SC and Wetland WS have been obliterated within project limits by recent development on Parcel 14. Totals for Site 2 represent theoretical project
impacts under conditions present prior to this development.
Feb