Loading...
HomeMy WebLinkAboutNCG590013_Compliance Evaluation Inspection_20221019ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director City of Burlington Attn: David Cheek, Interim City Manager P.O. Box 1358 Burlington, NC 27216-1358 NORTH CAROLINA Environmental Quality October 191h, 2022 Subject: Compliance Evaluation Inspection J.D. Mackintosh, Jr., Water Treatment Plant NPDES General Permit: NCG590000, Certificate of Coverage: NCG590013 Alamance County Dear Mr. Cheek: Ron Boone of the North Carolina Division of Water Resources (NCDWR), Winston-Salem Regional Office (WSRO), conducted a compliance evaluation inspection of the City of Burlington's J.D. Mackintosh, Jr., water treatment plant on September 29th, 2022. Dennis Thomas was present for the inspection. Inspection findings are detailed in the attached Water Compliance Inspection Report. Please be aware that the Division may take enforcement action against any individual who fails to comply with the requirements of all applicable permits, regulations, and/or statutes. Pursuant to NC General Statute (NCGS) 143-215.6A, a civil penalty of not more than twenty-five thousand dollars ($25,000.00) may be assessed against any person who violates or fails to act in accordance with the terms, conditions, or requirements of any permit, or applicable regulations, issued pursuant to G.S. 143-215.1. If you have any questions or concerns, please do not hesitate to contact Mr. Boone by phone at 336-776- 9690, or by email at ron.boone@ncdenr.gov. Thank you in advance for your time and attention to this matter. Sincerely, DocuSiTgned by: 945B49E225C94EA... Lon T. Snider, Regional Supervisor Water Quality Regional Operations Section Winston-Salem Regional Office Division of Water Resources, NCDEQ Attachments: 1. Water Compliance Inspection Report, NCG590013 DffNorth Carolina Department of Environmental Quality I Division of Water Resources oan caaouNn Winston-Salem Regional Office 1 450 W. Hanes Mill Rd, Suite 300 I Winston-Salem, North Carolina 27105 M336.776.9800 oep.m.m or em�nmen� ouaim, United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 u 3 I NCG590013 I11 121 22/09/27 I17 18I � I 19 I S I 201 I 21111I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved ------------------- 67 I 72 I ni I 71 I 74 79 I I I I I I I80 701 I 71 I LL -1 I I LJ Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES Dermit Number) 10:OOAM 22/09/27 19/09/01 J.D. Mackintosh, Jr. WTP 3400 Harris Rd Exit Time/Date Permit Expiration Date Burlington NC 27215 11:OOAM 22/09/27 24/07/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Dennis K Thomas,Po 1358 Green Level NC 27217//336-584-1394/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Flow Measurement Operations & Maintenar Records/Reports Self -Monitoring Progran 0 Sludge Handling Dispo: Facility Site Review Effluent/Receiving Wate Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Rorb Bo�p9ned by: DWR/WSRO WQ/336-776-9690/ osier& Boo., 10/19/2022 B20F8DD5F2A3460... Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date DocuSigned by: 10/19/2022 FL- -T. EPA Form4(ev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type NCG590013 I11 12I 22/09/27 117 18 i „ i (Cont.) Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Ron Boone, of the NC Division of Water Resources (DWR), Winston-Salem Regional Office (WSRO), conducted a compliance evaluation inspection of JD Mackintosh, Jr. water treatment plant on September 29th, 2022. Dennis Thomas was present for the inspection. Inspection findings are detailed below and in the following inspection checklist: The Mackintosh plant is issued certificate of coverage (COC), COC#NCG590013 under NC general wastewater permit NCG590000. The Mackintosh plant discharges decanted and dechlorinated water treatment plant filter backwash. All laboratory monitoring is being done as required. All required documentation, i.e., laboratory and sampling records, certificates of coverage, operator logs, spill plan, etc., were readily available for inspection. The is in excellent condition and well operated and maintained. Mr. Boone noted no deficiencies or violations during the inspection. Page# Permit: NCG590013 Owner -Facility: J.D. Mackintosh, Jr. WTP Inspection Date: 09/27/2022 Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ ■ ❑ application? Is the facility as described in the permit? ■ ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ ■ ❑ ❑ Is access to the plant site restricted to the general public? ■ ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? ■ ❑ ❑ ❑ Comment: None Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? ■ ❑ ❑ ❑ Is all required information readily available, complete and current? ■ ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? ■ ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? ■ ❑ ❑ ❑ Is the chain -of -custody complete? ■ ❑ ❑ ❑ Dates, times and location of sampling ■ Name of individual performing the sampling ■ Results of analysis and calibration ■ Dates of analysis ■ Name of person performing analyses ■ Transported COCs ■ Are DMRs complete: do they include all permit parameters? ■ ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ ■ ❑ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified ❑ ❑ ■ ❑ operator on each shift? Is the ORC visitation log available and current? ■ ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? ■ ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility ■ ❑ ❑ ❑ classification? Is a copy of the current NPDES permit available on site? ■ ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? ❑ ❑ ■ ❑ Comment: None Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory? ■ ❑ ❑ ❑ Page# 3 Permit: NCG590013 Inspection Date: 09/27/2022 Laboratory Owner -Facility: J.D. Mackintosh, Jr. WTP Inspection Type: Compliance Evaluation Are all other parameters(excluding field parameters) performed by a certified lab? # Is the facility using a contract lab? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? Comment: None Effluent Sampling Is composite sampling flow proportional? Is sample collected below all treatment units? Is proper volume collected? Is the tubing clean? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type representative)? Comment: None Upstream / Downstream Sampling Is the facility sampling performed as required by the permit (frequency, sampling type, and sampling location)? Comment: None Lagoons Type of lagoons? # Number of lagoons in operation at time of visit? Are lagoons operated in? # Is a re -circulation line present? Is lagoon free of excessive floating materials? # Are baffles between ponds or effluent baffles adjustable? Are dike slopes clear of woody vegetation? Are weeds controlled around the edge of the lagoon? Are dikes free of seepage? Yes No NA NE ■ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ Yes No NA NE ❑ ❑ ■ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ Yes No NA NE ■ ❑ ❑ ❑ Yes No NA NE 1 Parallel ❑ ❑ ❑ ■ ■ ❑ ❑ ❑ ❑ ❑ ❑ ■ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Page# 4 Permit: NCG590013 Inspection Date: 09/27/2022 Lagoons Are dikes free of erosion? Owner -Facility: J.D. Mackintosh, Jr. WTP Inspection Type: Compliance Evaluation Are dikes free of burrowing animals? # Has the sludge blanket in the lagoon (s) been measured periodically in multiple locations? # If excessive algae is present, has barley straw been used to help control the growth? Is the lagoon surface free of weeds? Is the lagoon free of short circuiting? Comment: None De -chlorination Type of system ? Is the feed ratio proportional to chlorine amount (1 to 1)? Is storage appropriate for cylinders? # Is de -chlorination substance stored away from chlorine containers? Are the tablets the proper size and type? Comment: None Are tablet de -chlorinators operational? Number of tubes in use? Comment: None Flow Measurement - Effluent # Is flow meter used for reporting? Is flow meter calibrated annually? Is the flow meter operational? (If units are separated) Does the chart recorder match the flow meter? Comment: Calibrated quarterly. Reports to SCADA. Effluent Pipe Is right of way to the outfall properly maintained? Are the receiving water free of foam other than trace amounts and other debris? If effluent (diffuser pipes are required) are they operating properly? Comment: None Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ■ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Yes No NA NE Liquid ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Page# 5 Permit: NCG590013 Inspection Date: 09/27/2022 Owner - Facility: J.D. Mackintosh, Jr. WTP Inspection Type: Compliance Evaluation Standby Power Is automatically activated standby power available? Is the generator tested by interrupting primary power source? Is the generator tested under load? Was generator tested & operational during the inspection? Do the generator(s) have adequate capacity to operate the entire wastewater site? Is there an emergency agreement with a fuel vendor for extended run on back-up power? Is the generator fuel level monitored? Comment: None Yes No NA NE ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: None Page# 6