HomeMy WebLinkAboutQuestion on TPB NCDOT - Wentworth Street Bridge Replacement (Bridge 239 on SR 1998)
Carpenter,Kristi
From:Conchilla, Ryan
Sent:Monday, October 31, 2022 10:40 AM
To:Parker, Jerry A
Subject:Question on TPB NCDOT - Wentworth Street Bridge Replacement (Bridge 239 on SR
1998)
Attachments:20210923 Ver 1_Approval Letter_20210728.pdf
Morning Jerry,
I’m checking in on the application question below for this project.
If you can let me know, I’d appreciate it.
Thanks-
Ryan Conchilla, PWS
Environmental Specialist II
401 and Buffer Transportation Permitting Branch (DOT Divisions 7+8)
Division of Water Resources, NC Department of Environmental Quality
919-707-9111 office
Ryan.Conchilla@ncdenr.gov
From: Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>
Sent: Friday, October 7, 2022 6:26 PM
To: Parker, Jerry A <japarker3@ncdot.gov>
Cc: Conchilla, Ryan <ryan.conchilla@ncdenr.gov>
Subject: Question on TPB NCDOT - Wentworth Street Bridge Replacement (Bridge 239 on SR 1998)
Jerry,
We received the application or TPB NCDOT - Wentworth Street Bridge Replacement (Bridge 239 on SR 1998).
I believe this is a project already in our system under DWR # 20210923 and wanted to double check the type of approval
you are seeking.
I have that we issued an approval for this project on 7/28/2021 and did not know if this was a re-issuance request for
the same project already on file as being issued.
I have attached the approval on file for what I believe is the same project so you can verify if I am correct and then let
me know how I need to proceed.
Please let me know if I need to be processing this as a re-issuance request.
Thanks,
Kristi Lynn
1
Kristi Lynn Carpenter
Administrative Assistant
401 & Buffer Transportation Permitting Branch
Department of Environmental Quality
Division of Water Resources
kristilynn.carpenter@ncdenr.gov
th
512 N Salisbury Street, 12 Floor
1617 Mail Service Center
Raleigh, NC 27699-1617
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
2