HomeMy WebLinkAbout310226_Compliance Evaluation Inspection_20221025Division of Water Resources
Facility Number - ® O Division of Soil and Water Conservation
O Other Agency
Type of Visit: _o/mpHance Inspection O Operation Review O Structure Evaluation O Technical Assistance
Reason for Visit: ('� Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: j� Arrival Time: /�,, Departure Time: County
IFarm Name: Q/t�Cf C Owner Email:
Owner Name: #</-CTI ��Qj �L Phone:
Mailing Address:
Physical Address:
Facility Contact:
Title:
Onsite Representative: U/J,g/T�/I/7w� [,/ /i `1.2.
Certified Operator: J�{J d ,,, /&# / r�edMA�
Back-up Operator:
Location of Farm:
Swine
to Finish
to Feeder
,to Finish
to Feede!
to Finish
Other
Latitude:
Phone:
Integrator:
Certification Number:
Certification Number:
Longitude:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
Layer
Non -Layer
Design Current
Dry Pmdtry Canaeity Pon.
Layers
Non -Layers
Pullets
Turkeys
Turkey Pouets
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify D WR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Regionio
1011CM.t
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes No ❑ NA ❑ NE
❑ Yes
❑ No
❑ NA
❑ NE
❑ Yes
❑ No
❑ NA
❑ NE
❑ Yes
❑ No
❑ NA
❑ NE
❑ Yes
❑ NA
❑ NE
[-]Yes
No
❑ NA
❑ NE
Page 1 of 3 511212020 Continued
Facilit Number: j Date of Inspection: (e)�
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier: I_
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in): ION
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes EPdo ❑ NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ❑ No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes � ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes bIo ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes [�14 ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes gXo
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No
❑ NA
❑ NE
❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground
❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure
to Incorporate Manure/Sludge into
Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift
❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes eNo
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes �Io
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes &o
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes 0;iNo
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes o
❑ NA
❑ NE
Reauired Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes E;J I ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes [2t'llro ❑ NA ❑ NE
the appropriate box.
❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other.
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [+]No
❑ Waste Application ❑ Weekly Freeboard []Waste Analysis []Soil Analysis ❑ Waste Transfers
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections
22. Did the facility fail to install and maintain a rain gauge?
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes Z�No
[—]Yes L2-No
❑ NA ❑ NE
❑ Weather Code
❑ Sludge Survey
❑ NA ❑ NE
❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facility Number: 11- Date of Inspection: l
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ELLNo ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes 61q-0-11 ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes Da-M ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No [.itY ❑ NE
Other Issues /
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes 9'IQO ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes Io ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes
LP
❑ NA
❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
Q./o
❑ NA
❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
LT'eo
❑ NA
❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
�Nq
❑ NA
❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes,ZNo ❑ NA ❑ NE
Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional paves as necessary).
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Phone:
Date:
Page 3 of 3 511212020