Loading...
HomeMy WebLinkAbout310839_Compliance Evaluation Inspection_20221006V Division of Water Resources Facility Number ® ? O Division of Soil and Water Conservation O Other Agency Type of Visit: 1Co/r9pHance Inspection O Operation Review O Structure Evaluation Q Technical Assistance Reason for Visit: v Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access /' Date of Visit: Arrival Time: Departure Time: County: 174-2`// Region: Aj Farm Name: Owner Name: Mailing Address: Physical Address: Owner Email: Phone: Facility Contact: �JTitle: OnsiteRepresentative: V�9�1(n C�i ///4l/Pti. Certified Operator: Back-up Operator: Location of Farm: Swine to Finish to Feeder to Finish v to Wean to Finish Other J'V'kkj Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. La er p o2GI JNon-Layer Design Current Dry Poultry Canacitv Poo. Layers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes t 0 ❑ NA ❑ NE [:]Yes [:]No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes Io ❑ NA ❑ NE ❑ Yes L7 110 ❑ NA ❑ NE Page I of 3 511212020 Continued Facili Number: 3 1 - —1 Date of Inspection: d" Waste Collection & Treatment —1 / 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes EFK ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the strictures observed? ❑ Yes o ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes r Io ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑Yes Z44ul ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes EXo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes l.24o ❑ NA ❑ NE maintenance or improvement? Waste Application �--� Yes ,4o 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ E2 ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [_�o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NA ❑ NE 16, Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Io ❑ NA ❑ NE acres determination? / 17. Does the facility lack adequate acreage for land application? yes r?N'o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ NA ❑ NE Reunited Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes "L;J d i� ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes 0� ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes LJ.Na ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections [:]Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑.1Go ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes CS-Ko ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facilit Number: Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes E�>b ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ©'No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes EL New ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) ❑ Yes ❑ No RYA ❑ NE ❑ Yes Io ❑ NA ❑ NE ❑ Yes Io ❑ NA ❑ NE ❑ Yes [J],Wl ❑ NA ❑ NE 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 34. Does the facility require a follow-up visit by the same agency? ❑ Yes Po ❑ NA ❑ NE Wo ❑ NA ❑ NE [� ❑NA ❑NE No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other continents. Use drawings of facility to better explain situations (use additional pages as necessary). '50.I41 15sis (9AI/9� Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: 7/0S0 y t'%kq Date: m AAA 511212020