HomeMy WebLinkAbout310444_Compliance Evaluation Inspection_20221006Facility Number - ti (
V Division of Water Resources
O Division of Soil and Water Conservation
O Other Agency
FType of Visit: (!TC�om Hance Inspection O Operation Review O Structure Evaluation O Technical Assistance
Reason for Visit: C7Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: Arrival Time: Departure Time: County: 1/I
Farm Name: lG^ L l j�t y Owner Email:
Owner Name: Lr LL—C Phone:
Mailing Address:
Physical Address:
Facility Contact:
Title:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feede
Farrow to Finish
Gilts
Boars
Other
Latitude:
Phone:
Integrator:
Region: W
Certification Number: 100 4_�8)_
Certification Number:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
Layer
Non -La er
Design Current
Dry Pmdtry Canaetty Pon.
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)? _
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Longitude:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes 241 ❑ NA ❑ NE
❑ Yes
[:]No
❑ NA
❑ NE
[—]Yes
[-]No
❑ NA
❑ NE
❑ Yes
❑ No
❑ NA
❑ NE
❑ Yes
❑ NA
❑ NE
❑ Yes
No
❑ NA
❑ NE
Page 1 of 3 511212020 Continuer!
Facility Number: Date of Inspection: Q d
Waste Collection & Treatment /
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [Lk' o ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Struc,wre 1 Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in): 3� 31
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
Z:r `o
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health
or environmental
threat,
notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes
L]-T�o
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
Q-<o
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes
�Vo
[j NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes
[CJKo�
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes
L ],°
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate
Manure/Sludge
into
Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application
Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
ELLA
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
�,�dQcy
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
[] No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
E[ <oo
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
Cj>
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
0 o
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements
❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
❑ Yes
e'5o'
❑ NA
❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
❑ Weather
Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections
❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
❑ Yes
E�1`&o
❑ NA
❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes
No
❑ NA
❑ NE
Page 2 of 3
511212020 Continued
Facili Number: Lf Lk Date of Inspection: p
24. Did the facility fail to calibrate waste application equipment as required by the permit?
❑ Yes
`(;/_ ❑ NA
❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check
❑ Yes
❑,ble--❑ NA
❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
❑ Yes
Lo— ❑ NA
❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
❑ Yes
❑ No Q- A
❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes
/
®�16 ❑ NA
❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
[]Yes
o ❑ NA
❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
[:]Yes
tU""o
❑ NA
❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
[E]>d
❑ NA
❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
E�,�,/°
❑ NA
❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
R 24o
❑ NA
❑ NE
34. Does the facility require a follow-up visit by the same agency?
of facility to better
50r/ r.�. ()ftJ
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
any Mi answers and/or any addii
situations (use additional paces as
3&lzo
❑ Yes �o ❑ NA ❑ NE
ons or any other comments.
Phone: ll //0155106 V9
Date: /6 ! � /eb,
511212020