Loading...
HomeMy WebLinkAbout20141238 Ver 1_Application_20141203AWA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P.E. Governor Director Attachment L: Low Impact Bridge Replacement Process Low Impact Bridge Project No.: _ County Nash Bridge No._32 over _Turkey Creek WBS Element Number 17BP.4.R.52 John E. Skvarla, III Secretary This project is subject to the Low Impact Bridge Process as agreed to on October 6, 2009. This project meets the documentation requirements and approval procedures under NEPA, as defined by FHWA, for Low Impact Bridge Replacements. This project meets the standards of NCDOT's Minimum Criteria Rules. Date: 12/03/14 Applicant Name: NCDOT Applicant Address: NCDOT Division of Highways P.O. Box 3165 Wilson, NC 27895-3165 Primary Contact for Project: Chad Coggins Phone No.:(252) 296-3532 Is this an after -the -fact application: Yes X No River Basin: Neuse Stream Classification: C; NSW Regulatory Authorization Options for this Activity Federal: USACE Nationwide General Permit 3 — Maintenance State: General Water Quality Certification #3883 and/or Buffer Authorization Local: None Project Description — NCDOT proposes to replace Bridge #32, which is currently a single span 45' x 30' bridge, with a 153'x 30' (3) span bridge over Turkey Creek in Nash County. Stormwater will be discharged onto a riprap dissipator pad outside of Buffer Zone 2, in the northwest quadrant of the project area. There are 40 linear feet of temporary stream impacts associated with the placement of a temporary causeway to facilitate construction. There will also be 4,243 square feet impacted in Buffer Zone 1 and 1,206 square feet of impacts i u r Zon 2. I • Signature: V ti Title: NCDOT Div. 4 DEO ev Transportation Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX: 919-733-6893 Internet: http://h2o.enr.state.nc.us/ncwetands/ An Equal Opportunity 1 Affirmative Action Employer Nne orthCarolina Naturall,ff Attachment G: Low/Minimal Impact Bridge Project Data Sheet 1 TIP NO Division Managed 2 WBS Element No. 1713P.4.R.52 3 County Nash 4 Bridge Number 32 5 Description Turkey Creek 6 187 Stream Basin Neuse Classification C,NSW SIN 27-86-3-(1) Type Inland Size 35' 11 12 13 Existing Structure Type 1span Size 45'LX30'W Suff. Rating 4748 14 Proposed Structure 15 Type 3 span Size 153'LX30'W 16 17 Stream USACE (LF) 40 LF temp causeway for bent consruction INCDWQ Impacts (LF) 0 18 19 20 Wetlands USACE Impacts (AC) 0 INon 404 Impacts (AC) 0 1 CAMA Impacts (SF) 0 21 NC DWQ Buffers Impacts (SF) BZ1=4243SF, BZ2=1206SF 22 Buffer Applicaton Required (>40 ft) (Y/N) Y 23 State Stormwater Permit Required (Y/N) No 24 25 26 Habitat T&E Species Present Bio Conclusion No No No affect 27 28 Moratorium Type Dates No N/A 29 30 31 32 Native/Hatchery Trout Species Present Trout Waters Trout Conditions (Y/N) WRC Reviewer No No No No 331 CAMA AECs No/GIS Confirmed 34 Essential Fish Habitat No/GIS Confirmed 35 Nay. Opening No/GIS Confirmed 36 USCG Permit No/GIS Confirmed 37 Historic Properties YES/MOA attached 38 Archaeological Resources No/HEU Confirmed 39 Tribal Lands No/GIS Confirmed 40 4(f) Resources No/GIS Confirmed 41 6(f) [LWCF] Resources No/GIS Confirmed 42 Wild and Scenic River No/GIS Confirmed 43 Federal Lands No/GIS Confirmed 44 TVA Area No/GIS Confirmed 45 FEMA Buyout No/GIS Confirmed 46 FEMA Flood Study MOA/Hydro 471 USTs Haz Mats No/GIS Confirmed 48 lRelocatees No/GIS Confirmed 49 50 Location LAT LONG 358659 78 1771 51 Project Comments Completed by: 9 Division Environmental ar 12/2/2014 DEPARTMENT OF THE ARMY 'T, CORPS OF ENGINEERS WILMINGTON DISTRIC 69 DARLINGTON AVENUE W11-MINGTON, NORTH -CAROLINA 28403-1343 ATTENHON', (W December 10. 2013 Regulatory Division Action ID No.: SAW 2012-001 06 Icahn °I'. 1"Iddins, Ph.D. Advisory C.ouncil on Ffistoric PreservatioP Office offederal (-ICIICV Programs 1100 Pennsylvania Avenue, NW Suite 803 Washington. D.C., 20004 Re: Memorandum of AEZ reenient (M(,)A) for the prOPOSed. reptacernent d Bridge 32 on NC"? 31 over Turkey ot",Aiddlesex. Nash County'. North Carolina, Dear Dr. V'ddins: Enclosed find tI Copy ofthe; 11\10A bemeen the US Arrny Corps of Engineers WOWS), the State I listoric Prcservalion Office (Sl 11)0) <ind the North Carolina Departmeat of Transportation (NC, DOT), that was developed to address the adverse effect of the proposed replacement of Bridge 31.2 oji NC23 I ever Turkey= ("reek in Nash County. Inasmuch as Clic 17ederal I lighway Administration did not fund this project, but it Nvas necessary to secure a Corps -s permit under the authority of the Clean Water Act, the Wilmington District Corps of 1"noineTI served as (tic lead Federal agency with respect to ensuring conipliance -vith Section 106 ofthe 1. Z� Historic Preservation Act. A perruit for the referenced pro?jcct., if issued, will contain a condition that obligates the; NC DoTto-comply with the pro-vislons contained therein. The Corps of` t-,mulnecrs defined the undertaldm,,. the boutidaries of'thc permit area. and evaduated the of,the undertal,',irq, on historic proncrtlies for this proiect pursuant to 3`� CFR, Part 325, 1 lie result of [Ilis amflysis -,A"as the decision Illat the CrItIve proje0 �j area sho v I d t1°dic S6:(,qw eel 'the perimi defined by thisarmlysis is idem the scope Ihal would be IdenilIjed bthe rezpilatlowa al 36 C1,R Part 900. we are vvifl"1141 10 "12n, the, attached %10,A, w1hich dQfine,,,; ific I)Io'cct are:A \�;Jtjj re 1 ,rencc 10 the 1-eLWk0i0)1S ill ;6 CFV Part 800. In accordance vl'ilh ,6 C1A §800,6(b)( wearc ,-i copy of tbe tbr Vour rccofi It'vou have any qLICSfi0fIS or need additional inrormation, please contact Tom Sleffel's at the Washington Regulatory uiew Office. telephone (910) 251-4615. Sincerely, Scott M, cLendOTI, Chief Re6lLdatory Division Wilmilluton District Office F,�[Iclosm-c Co pies IbIlliShed (NN ith(All ClICIOSUIV). Ms. Renee Gledhill-Larley North Cawlina Department of Cultural Resource$, State Historic Preservation Office 4617 Mail Service Cemer Raleigh, NC 27699-4617 Ms. Mary Pope FUrt, Supervisor, I-listoric. ArchitCCLUre SCC6011 Century Center Bildinp, B 1020 Birch Midge Drive Rale4th, North Carolina '27610 N1 I �'.,MORA IN D ULM OF ACJ� I ,LNIFAT ANIONGTHE UNITED S`1A1'ES,kRN'TY CIORPS OF UNCINEERS, '1141, NOICHI CAROLINA DEPARIA11,141, OF TRAMPOICIATION, AND 1 11E NORT*14 CAROLINONSFATE HISTORIC MESERVATION 01TWER FOR THE REITACFMENT OF BRIDGE 32 ONAC.'231 FOCI MUNTY, NORT11 CAROLINA NCDOT11ROJECTNO. 17141"AA WHERE,AS. the U'nited`l'iates Army Corps o H ";ngi rice rs (IJSA(,I,',) hz'is determillc;d that the ncplacement cW Wye 32 on NC 231 over Turkey Creek i q Nash County,,Nlorth (Andba (be lhiderLikinp') ;vfll imve an MWA upm Nash County Bridge I'N'o. 3,2. r,i strt'lculm elit r listing _�iblc i'm , in IS AM& HeMister (Q lisalric Placm, (NRI Hj as acowributing wource to Me Murrt�h"s IMill I jir;loric Oistrict; nnod WHIMEAN, to I jSMAT has mQuAd Mh the 'North ('m-o1imiS'uate I listoric Prcscrv'mon' Offit:er piursuant to'30 CRT Part 0100, regukiUmis implemetwing Ste tion 106 oVth, National Historic Flreservat,iw pow ( 16 USA7.4701): arxi WHERE,AS, thUNACT", has tictilted dhe ""Id'viSMY COMICil 011 1 IiStOFiC, 1'rCSCYV,111k-471 Qkamcil) of the adverse eflect. abd it has declined to comment or participate in the n; consl':!Lttio� an �d WHEREAS. the Nlorth Cm-olimt D�:parhncni of"I'mnsport-,ition (NCDO F) has jr,irtio,ipatcd ira iho emmuhm4n wml hawkeen hwited by INME mul A: North Carulhvi SHIJ-10 to I -,,c a,signatory to (his Montorandoini ol'Agrectnent (MOA), 74OWTHEREPT) RIL No US),ACI�, and Ow No�'th that the QW06ny shall ho nnpk-aie„ntud in zhwwdmwc,, v%,ith the Foilo"ing QNsions in ordw w Me n90 account the Mus Whet o tho historic p-mperly, MLA IO I h",-, � `-t \CE of "M A I Aludimme thy m Won, mqmnaways wo 00"le w "I am, p, mi, 'Jlc k I 1. I'hth)rcvl;nf a I hall Mor U, lot puuatloy)'i-'' "'t `Vol WOU 1 n I out a: VAPAIng V _ .won Rr'die and ip; "mmunG:,-z ium, Kai, Am or nyurn, wMA 1.12,{`minow gni Anmy's 410r Mom Wynn ii acconhyn.- vvidt the allayHod I lismin ImMura, and j :Wbuqw40"ordali '', Plk'lv� Gives OC Me"', i- Amp 14� --Alwon-T (TO : smi IL Inclusion of Bridge Na. 32 fir the Ifistoric Bridges of North Carolina Wellsite, NCDOT is currently Jovelopliqr; as public website that will provide intbrinatiOn about Iiistoric, bridge.5 �,�jnd the history ofbi-id( ge construction in Noilh Since Nash Bridge No: 32 is an elioible wtructurc it will be included in the inventory of" bridges willi, photographs and a narrative histoty. 111. Uiminticipated Diss: very fn accordaTICC with 30 (IR 800.1 I(a), it'NC)OT Identifies additional cultural resource(s) durini; I g construction and deten-nine them to be eligible for tlieNTRIAP. all work will be halted within the limits of the NRI I P -eligible resource(s) and the USACE,a,rid S111`10 contacted. Ifafter consultation with the 84,)nalory Parties additional 'mitigatioti is dktennhicd necessary, the NCIN)"J", in constiltation with the Si,patory Parties:, will devetop and Implement appropriate protection/mitigation nicasuret; for the reSOLircc(s), fnadvertent, or aceidental'(fiscovery of human, relliallis will be handled iii aceordarice with North Carolimi General Statutes 65 and X (V. Dispute Resolution 'Should any of the Signatory or Parties ol>jcu within (30) days to any plans or documentation provided for review pursuant. to this A4reenieiit, the USACEshall consult with the ob * iectirt�g party(ies) to resolve the objection. Irlhe USACA, or the obj)eeting party(ies) dOerfi,iiiies that the otjeetiori eminot be resolved, the USACE ,Vvilt rom'ard Call documentation relevant to'the disputc to tho Council. Within thirty, (:HCl) Buys after.reccipt ol'all pertinent documentation, the Council ,viil either: t. Provide the USACE Nvith recotinyiendations, which the OSACE will takc into riccolult it) rcaching a filial decision regarding OiQ dispute, or 2. Notify kie'USACE that it will coinnicin pursuant 10 CFR Sucfio) 80M(c) -and proceed to conimejit, Any Council Couirriont provided irr responsc to such a request will be takeii Into account by the USACE In accordancc with 36 CFR Section 800 7 (c) (4) with rCk"relice to the, subicct ,,fl (I)c dispute, Any - iccoinmendation �Jr comment providcd by the Council %,vill be under�lood cc) I t� , pel-taill ortk- to The sub`ccl of the disj,,)uw: IJSACI--'Bifid NCUOT's respon's"bili y to Carry old all t:"I; uQ nol the ofllw d I Sp uIII---- -vvd! rern'�,Iin VAmendments should alry odic P�-.�nies to thi. MOA belie-ve lhat it, lexuls lie carrj,:,� ,,w -r Olw �m t�o 'HIC, IvIIIIS TlMdc, dk, :3 '111 � r-Iflu t 1", S 111 'ACC with 36 CFR 00.6(c)(7). Warn 4arnnencfrrrent, caxmot he agree upon, the clisfiute resolution processset forth in Stipulation IV will be fcnllcnwcef. VI. Termination Any a the sip atnry Paarty(ics) may terminate the agreement by providing notice to tine ether parties, provided that the si natofies will consult clurirnf7 the Iaetunc# pricer -tea 'termination to seed 4agreennent enn.aarnnendine ntscar Cather actions that would avoid termination. Terunitnatio n of this t\4O will require, ccannpliaance with 36 CFR 800. This MOA i nays be terminated by the, execution of at subsccluernt. MOA that explicitly terminates or supersiwdes its terrnns. VD. Duratiirrr U nlcss ien ninatcd pursuant to Stipulation VI aab6ve, this MOA will bre in effect until USACIT,", in consultarllon with the other° Sigrn,atanry Partii s, determines.thart all €al`its terrnnr lnararo satisl ne;torily been fullillvd or ih N('DO F is t. mtble ur decides not, to culstruct the tfiaa.lc'rtaaking' FIxecution ofthis LMemorarncla.rrn. €nf &m.,emem by IjSAC t", NC" 'l..)OT, and the North Carolina SLIP', ,,inn implernentatio n vi` its wrinns, �;videncc that l„ISAC E haps afforded the Council all crpporturnity to ccrinment on the l.Indertaakin(.1,1. and ihaat L..ISAC E has taken into account the effects oFthe l..irncle.rta irnt,, on the hista)r-.ic l�rcrtaertie;. r I3y,� r � �.� .._ _ .... � ._. Date: L% 13 Scott,fmcLendon, Chief ; Regulatory Division United States Army Corps of F'rngirnews, Wilmingt« ar District l°CVii) t lit`1'l �, l`Llwl. Nfirth Caandip.rnatState lIlsterrie: Preservaa6kon a?Ific,cv North t`aarerfianaa Department rat`Clulturaal 7 Rohert Andrenv (:,'y n I luman E nviro nrn'rent Scc.0 o n Ilead Hearth Carolina Department tit l r<anrsr c rtaatralra iNII EMO RA ND UNII 0 11 A CxR F, E M 1', NT AMONGTHE UNITEM STATES ARMY CORPS OF ENGINEERS, THE, NOWIM CAROLINA DEPARTMEN' (')FTRANSPORTATTON, AND THE' NORTI-t CAROLINA STATE HIS '1'01),'I(,'Il.t�ESEI�,,VA'I'ION OFFICER FOR THE REPLACENNU'NTOF BRIDGE 32 0 N NC 231 OVER TIJ ETURK ],�',Y CRE P' , K NASH COUNTY, NORTII CAIMLINA NCi)o,rPjzoJECA'N(,). 171111.4.1 I 'PILED: Date: Advisory CmimCil on I'lisloric Preservallorl APPENDIX A I listoric Structures and Landscape Rccordatiotl Plan NCDOT'F'rojcct No7BPAJ The Replacement ot'llridge 32 On NC 231 over Tu rkey Creek Nash County, North Carolina Photouraphic Requirements • Elevations and oblique vlcv,.,''s of Bridge Not 32 and its ,setting. • Reprcs�:nwtive, sti'uctui'al and ornamental details of the bridoe. • Rqi�cscntativc photc)graphs of historic district. 1"'hotographic Format, * Color (111,1,itat imaocs (all views). linages are to be shot on as SLR digital cai-nei-a with as n'unimut'n i'esolutiora of6 megabyte pixels, at a high quality (pirefcrably RAVY') settirlg To be saved in TIF 'fimn'i,ai as the archival masters, and libeled accoj-dijig 1c, flies SUate 11,istofic, 11i,eservatioln Oflice standards, * All processing to be clone to archival standw-ds. * The accompanying printed inventory ofthe imalges hicluding subject, tocatimi, date, abd phuto-gaphcr infloi-maticin for each is iage is to be conij)leted accoi'diticx to the St"Ite f fisto6c Preservation Office: standurls. Copies an(] Curation One (1) ,,cf of fill abccc niontlom'd photogl-'Iphic dcXunicntation. ;i '(anj)aci disc of labeled irnae., wl'I] be d �? eposiwd with thc orth Carona li0I fice ofAiviiivos g,,I N and f listory/1--fistoric Pcoscivatikm Office to be nia& i peraianent, part of the tilalewide swvey and lconogniphic collection One (I'l cmraact qh"'et -Jh all be dcPo'-5-Qd iii the Orouj') o!'N(T'I('YI '3 i\ J f co Preserving America's Heritage December 24, 2013 Scott McLendon Chief, Regulatory Division Wilmington District Office Corps of Engineers 69 Darlington Avenue Wilmington, NC 28403-1343 Ref: Proposed Replacement of Bridge 32 on NC231 over Turkey Creek Town of Middlesex, Nash County, North Carolina Dear Mr. McLendon: The Advisory Council on Historic Preservation (ACHP) has received the Memorandum of Agreement (MOA) for the above referenced project. In accordance with Section 800.6(b)(1)(iv) of the ACHP's regulations, the ACHP acknowledges receipt of the MOA. The filing of the MOA, and execution of its terms, completes the requirements of Section 106 of the National Historic Preservation Act and the, ACHP's regulations. We appreciate your providing us with a copy of the MOA and will retain it for inclusion in our records regarding this project. Should you have any questions or require additional assistance, please contact Mr. Anthony Guy Lopez at (202) 606-8525 or alopez@achp.gov. Sincerely, Z LaShavio Johnson Historic Preservation Technician Office of Federal Agency Programs ADVISORY COUNCIL ON HISTORIC PRESERVATION 1100 Pennsylvania Avenue NW, Suite 803 • Washington, DC 20004 Phone:202-606-8503 • Fax: 202-606-8647 • achp@achp.gov • www.achp.gov 1 � __ ,_, � > � �0� � � �„������ q � .� `ti.� �� � � 11T1 �•_ r", 4i �I!_� . � �.1 � � ���i ,; � ' ti BRI GE No.32 �} ; `� 1�1�_;� '-�� �i�r f, �x�:iar � s a� 4e 1� ,- I I,� i � {'SiY''?4�i , fi' ' , ' . r I��. �.;�1 • p'� ' . � �`e r- I . ..r' • !-, � 'ti .1�� y•e;� � '1�4L' � y •ir.��. � l.r� ,_ J _ � } • +, , ! ;L'• .a �,�ti[r" •' I' •� ' r ��_ 1•�;�. �^ t- �+Mr�� �,�3 ' � r� . ` , � i �i �? �.�, - K � � ;1��, � - ... ��� r� � � � _ .. _ �} � . � . 'ISFi '�H" � ,;• 'lal �- �. . ' c,'i'�rs:n7 'o- lal — � .Y�LE ; � � �,dp j•�• _, ; , : , ks�:t�'�. �:s��a�� . - � � � , � r.rc�.,r:�r,e�� — , e • ' �, '9-r' ti�l•ill �•'u ? 19,�'I ` , �I � . 5.i ' f � u . �- I . � I'3� ; wr,��.- _ a . 4:ras-. _ � , s. ' F � ti .�i�. � ' I: . 6.�+r� ��t.k . -.}., 7iti,' .+ } 'ift1G c� :'� a^" n :p t � .. . }.� `��� F •� � � � � , `i.�� � � h i�a- � � 1`G❑ _'� - i . — I`�_x ..4 , � �. — ����� I[D1[\V'][���1� �1F 1�[l[�islf��i%.S1�I'� � � � ��� � � �� I'�A��1FII �C'��JI��°�Y 1�1[8��J1�E��[°o ll�1B1�o�lo�do�� � � � T�][:11�][e��]E 1�1Eg1[��sl� ��� �� l�� ��]L ��]Ell$ Q1���°l� °l��v 5�C_r�IL,]�D °�°gJlE�l[�i��Y �lt$lE]El[� � „H��� ,, ° � VI �=,.�z + •`�" � _wt_k r'� � i a� i � �, 1�j1� �'� h-.,q��- ��.. '�'��'� _ � � �} 1 � : .;. ,� � x `� ,,. �'. �� � � • r �' — � � . �1 11 r" ti ' �.` 1 r� �"r��f��� ,� ���=-s � }� ��+ Y� ,� ��'l��"C��t�f � �'�. I R� J .�_ se=.,r. , �� `� f _m , . . ti f t �� �. '�� � i' r��� I' 1?: l � ��}7 `''h� +; y i' � � I� �1�[1G�`][° �1F' ]�� % �� % ���� _I�` ���1La�� i� � V'�Y ,l_\ 1L"eJ��� i'�iA�l�l[i,�� Alap� ���1fg1G��1�� �1GIq �ll�.���� � �o °v ��"Il�� A��1R�1CS�1�� i� % � N � • � • � � � + � 0 1� �� � � � � �`� V � � d: O � V \� BONNIE RUTH PERRY \ DB 117i PG 155 RAYMOND PERRY & ��` WIFE BONNIE Re PERRY ��� � DB 1128 PG 731 ____ f�'� 36"CONC _,_ � `,R�TATN � BEGIN PAVCMCNI � BEGIN APPROACH SLAB STA, 14+ 8,38 -L- STA.13+00.00 -L-� � � ` � '� N I I C� LENGTH 75'-0" � � R DIUS = �'-0" FX. R/W� i � PP �� � � /� / / �''� �. ly '�/�, � �GRAVEL -��� X \ X X X � � - _ , '�J�j�'�.Vtl�l� � uh�ux ]52'-105�$" I OTAL LENG i H � �_:LI_ FACE �i0 FILL FACE ALONG ... SURVFY A6'-A115" � 60'-13�G" � 46'_4 � SPAN � I S�AN e I ��AN C �\ `-��' ) � Z �. �_ TEMPQRARY CAUSEWAY � LAS� II RIP RAP ��RkEr R = - _ ,+. �.67 � FFK ' I ��__� — � 1`:r �� _ � � ,= - � _ � �Cn nnn n'.n,�u�.���. � _ � _ �"� _ ' ,_ xxx �rxuxxuxux'�� � ,- ' � ,- '% T — � ��' _ � �X�unnn�u� ,,--�"� ,,- " o o�-g n ��, nn: F_--' _ - _ '-- -- ----- - - _-r=-- - -- _ - � --- -- - ' �_, ,�� -- t - �, ��_ � ---�;, -- - TO NC 97 GR LENGTH = 50'-0" �,A i��, � o�, RADTUS = 15' " � °o� � SIJRV�" L WC 2'li �i �°il 58 C �,� °QO'00" � i0' 3� I �,°Pe)�� °� , ,� � -- -- --- - -EB1B - ` -° --- -- -- , „� � , , - ---- --------------- � _ ----- i8"RCP- ' _ ��L; - -�- -�- - -- - -�- -,- - - - - - _ ----- �'� � �s�rt= � .. . _ _ '' 1S 1.,s.:_ -- �j/ - — - —.. — .. j -- �- \\T- J = - ///ij/ SLOPE STAKE � �� � �, : �/ �� LINE (TYPJ A -1 1��T � RLML] [�/�/� V'' i . —__ __ T --��� - �* � � r� �2n � ��� __ �� _ � �-- - -��- ----� � k�Ci�; � � �k \ \ LOLA MURRAY BASS DB 1650 PG 918 � A��,�o�c�� s�AB A� 16+i8e96 -L- =V uFNCI,�ITE' �AT_ SFT IN �0" ��J,�I � R=F 75e76' LEFT OF -L- STA� 15+83v09 ELEVa 213e72 NAVD F38 CLASS 'B' RIP RAP � 2 TON W/ 7 S.Y. GEOTEXTILE (TYPo) � GR LENGTH = 93'- F + _ / _ - � . �a _ s� �-5�ao�� � �n�� _ cYJ� � a�8 00 � 00[�5� � - - `-� _ � G '��__ � o� � ��'�, v' �o�no (���0� Jo � l5" CSP W/2 ELBQWS _� � EXIS I�C 3,?_J' Voe 32 20�-o c �A:� �oaowa� SPANS: ] C� 45-0" RC DECK GIRDCRS END o�NIS r�EZNr. couc� �>>-� ��zcHr a�u�v_nn s -NOTE:WETLANDS ARE BEYOND PROJECT LIMITSa — �� � / ��ND PAVLMENT I S � ld�7+25v00 -L �� V � ; 7 � � � � � � I EX. R/W � � � � I�� � PP -' � � �ISTTI� � � � w� � � L 9 RCBC � � � ,�. �r�`� �r�NE�, _ ° °o�oY N ��d `o � — — �T =� �J ��til-�,F ' � � i� � - ` ���,� 0 - r - � � � ,, - ---- � --- - --- - - - _ --° � -- -- ---; — _ — -_-. �� L - --- --- ~ TBDI W/ NARROW �`. �"� SLOT FLAT GRATE � , � � r F -0 SR 1�i58 � - O --- -----_f ��l-� °� -- rn� ��fl° -------- - �TYPE-350 G.R. ANCHOR � � GR LENGTI, 81'-3" \ � ) (TYP. U.O.NJ M + SHLDR. BFRM GJTTFR ('YPJ �'� v`�� Q� � X�X X X �% / / / 7 �'� .,_ � r '� - � � �'l� � �� � , �r�'l, �i�' � -rEX R/W �c���., �'l�/ ! � � ` ��1�[` � ',— a _ ��1� �� _ -LXe R/W � � — � - , ���. � WOODS _,� � � �� N WQ�! �' NT 2 � � WORK PO NT 3 WORK POTNT 4 � WOODS � � �� � -- �" STAe1�l+9ne"0 -L� ��" SIA.15+5 74 -L- STA.I6+OS,ll -L- � � ��; - - �s°RC�-� 'PDE-I 6' �� � � � � _ � -' ---- - - -- - REMOV�� WOODS �J � � � � � � � � RELOCATED�BY�Oi�ERS�O �� '"� �yF „ 1?_" C0�'C � � � � �� ������ -�� --------- ELGIA Re MORGAN �CITY 0 WILSON LOL-�- Mk�2 AY BASS � � , PB 3 PG 46 � A DB 1599 G 841 � �DB 1650�G 918 � � i� � �E�' F C � i � ��� �GENE T. VICK & �=. ' w PLAN � I ' WIFF CIN�Y P. VICK F� `� � scA_�_ �= - 20' � iYPicA� cHOSS sECrioN AI.DNG CAUSEWAY rNnr ro sc�,� E� TOP WIDThl=36' , NW S + � iv r �. FLOW� � � �� o°o � �o °'8 °,� CHANNEL � rTYP.1 ��EM�'ORFlRY C�IUSEWAY GEOTEXTILE CLASS l l RlP RAP FABRIC IBELOW USE COARSE AGGREGATE ALl_ RlP RAP PLACED SURFACE AS NEEDED lN THF �,H�NNFU BEGIN PAVEMENT CT4 1�:(1(1 M -I - � �ENOTES GLO���IECFI BORE FIQLF LOCATIONSe DENOTES TYPF III GUARDRAIL CONNECTION REQ'D. �UNK I_N. � SEE "GUARDRAIL ANCHORAGE FOR VERTICAL CXIS I WG 30' EASEMENT CONCRETE GARRTER RAIL" SHEETe !'B 26 PG 391 N07E,GUARDRAIL LENGTHS AS SHOWN INCLUDE ANCHOR UNIIS. N OTE: FoR PAVEMENT LAYOUT & EASEMENT LAYOUT 0.01 ACRES OF SEE "ROADWAY DETAILS" SHEET I OF 2. TEMPORARY IMPACT FoR o�zvEwav �avouT FOR EC DEVICES s�t ��ROAOwAV oETAZ�s�� sHEEr 2 oF z. STA. 14+52e23 -L- STAe 14� 9He60 -L-. WORK POINT I WORK POINT 2 FILL FACE END BFNT 1 � BENT i G.P. ELEV. 224.10 l��ze 1 SLOPE NORMAL STAa1A+3g 3g -L- TO FND BENI CAP� BCGIN APPRO�C;- SLAB �TYPa) � 240 7'-7„ LOW CHORD 230 ELtV. 221.3� 220 MILLING LIMITS 210 L00 � qPPROXIMATE NAIURAL GROUND LINF_ 13+00 HP 12 X 53 SIEEL PTLE (TYPJ 1'-0" N E3GRM ( I 14+G0 F � S'-6� (TYPJ Ov08 FTe/FTe (TYPe) �TA.15+5Be74 -L- WORK POINT � � BENT 2 ,�� h3RIDGE STA, 15+28e67 -L- �I I 100 YEI�I� hlehleWe HIGH WATCI� � ELLV.219e5 ELEV.219.3 �i (9/96) F F � -- -- �- - —=� --- ELEV. 209.6 N,W.S. ELEV. 208o6J � (10/7/04) 3'-0"� DRILLED PIER� (TYPJ LOW CHORD FLEV, 219.8 � � � � � � � � � � � � � c9, � � � SITE 1 TEMLORARY � � I� � �\� � � I FI L IN � � I� SURFACE IF � � — _\ {� I WATER � � � � � � � � _WL�- SITE 1 414 SF STREAM & WETLAND IMPACTS I NOTES TOTAL 414 SF I ll METHOD II CLEARING AND GRUBBING 2)NO MORATORIUM FOR NASH °32 STAe 16+o5.i1 -�- LNOTE: WETLANDS ARE BEYOND 3) TURKEY CREEK IS A BWE LINE STREAM WORK POINT 4 PROJECT LIMITS. SHOWN ON THE BUNN EAST USGS QUAD FILL FACE END BFN'f ? MAP G. P. ELEVo 222.59 PROJECT N0, 17BPo4oRo52 sTA �0+��_9h �- NASH ENO Ai r��oa� � s At COUNTY Nn I>AVEMENr _ �rao � r+2seoo –�– STATION� 15+28067 —L— � /�i// - � � Mz��1N� uMl�rs (TYP.) �CLASS II RIP RAP DENOTES UNCLASSIriF_D 2' IIiICK W/ GEOTEXTILC � (TYPJ STRUCIURE EXCAVAT-ON EXISTING SUBSTRUCTURF (RETAIN BELOW FLEV.209,6) � �IOP OF CAUSEWAY � 15+00 (TYPICAU t6=00 FLFV. = 7_09a5 PROFILE ALONG � SURVEY SCALE : 1" = 2Q' F - F I.X�U F.I�D 17+00 PAaEO A.: -�MULKEY ���OG�I���S� Df�G1 r��I�� �� s �66��.4�.s �� �I��3 IN�L G�� ��P6�4f�t��YB�� www.M�,�..E,���.�o., �roLACrS DR�DG� N0.32 SFIEET 1 OF 2 N � • � • � � � + � � 1� �� � � � � �`� V � � d: O � V \� BONNIE RUTH PERRY \ DB 117i PG 155 RAYMOND PERRY & ��` WIFE BONNIE Re PERRY �, °, DB 1128 PG 731 =_—S- -=- ---- fC�_ I --- 3��„-CONC �-�-_�� `�R�T4TN � / 5��� N APPROACH SLAB � F3EGIN PAVEMENT SiA �:+�8,38 -L- �STA.13+00.00 -L-� � � �� '� N � � � � G� ���vcTH - r�� o° , � r� o tos = �� u��-i �'�� EX. R/W� ,� � i�' I �i . �t"' _ � ' J �`�� i y��k�� ��l�x / � y � �� � x'°� x��C� n� � GRAVEL LL � i, �y � � � _ � x�xx ]52'-105�$" I OTAL LENG i H � �_:LI_ FACE �i0 FILL FACE ALONG ... SURVFY A6'-47 „ 60'-l3 " � 46'-4' SPAN A S�AN e I ��AN C �\ `-��' ) � Z �. � TEMPQRARY CAUSEWAY � LAS� II RIP RAP � � � ,,, ' _ �Er �, �_ - - . _,-.3.6� RF �� e�� � � � — , �'.�_ �__ � �\ �I--- -� ?�;. � _ I— � � -'"�� _ � - � � I �� XXX � XXYXXXXX � j � _--�"� ' T — � _ � � .� n,�,�nnn,�nn � _ � � -�" - �o � �� u�z ���u�u _ r - 1- IF �_-- _,� �- ° i g�� _ .x.x�n�n� ���nnnn��� 1 ---- - _ - - -'. --- - : -��--- - - - -- -- � _ � � 1 �"v�� i 's.z.x cx -_" u; GR LENGTH - 50 -0" �,A ' �G�, � oV -- ------ � TO NC 97 � RADTUS 15' a�`` �o� � SlJ'�V�`! L ;�C 2�1) � _ �� 0'_1 58 L QO'00" , � �0 3�I -- -- -- - � - 'E61B - - _ , ., ° ? �P )�� � � � �0�� _ a ,� � � ------- ��\ ' -" �'�� �� _ - - - � ------ _ � 8 � RCP-� - - ,,�j oL� " , - ��i i F ►\� r�"" `e�. .. � CrCn�� : �u;.�.CE . � �- -�- -�--�-- - -�- - ` - = ° - � � � �C � -,�s> - , � — �- - - -- �" �- � �'� p�, � � ��\ � \ \ � ��� ��s��- �� X�*fj� � �C� — — — - � — - - T , ;� �� ,�` F��,;,' �� K� �� ��� y \ � � � ��'� � s�oPE sTAK� A. i 1\T ' i��MO %��i i �%�����'��� � x �� i_Tti� �TYi�o� , � � � '� `�,( p��i�i�i \ � , , , � �� � � �� ,' - -� Y- , � �i�7���i i` i��� �� x`� __.�-�r� �-r t x e R i w �-r''���— , Q. ;�? � __- -�� \ , ii ~ WOODS /-�, �" � � N WORK P NT 2 \(� ��_VJORK P0._�'T 3\. �,� - - _ - _ � S�I�Ae1�l+g��� L� � SIA.15+5 74 -L-� �,�,,,-,�; -� - �5° Rcr-� PDE i� 6,1 � � _ , � �� � - "' ------ _� - ?;=MOV°- WOODS J � _- "" /y �. � � °co�c ELGIA Re MORGAN \� -' � � � �� �� � � ' PB 3 PG 46 � � -' � � - �,� . ��� ' � P�AN � � '�GENE T. VICK & F� �, "'' `�' seA_�_ � �-�� = zo� � WIFF C;IN�Y P. VIC;K � �ENOTES GLO���IECFI BORE FIQLF LOCATIONSe iYPicA� cHOSS sECrioN AI.DNG CAUSEWAY rNnr ro sc�,� E� TOP WIDThl=36' , NW S + � iv r �. FLOW� � � �� o°o � �o °'8 °,� CHANNEL � rTYP.1 ��EM�'ORFlRY C�IUSEWAY GEOTEXTILE CLASS l l RlP RAP FABRIC IBELOW USE COARSE AGGREGATE ALl_ RlP RAP PLACED SURFACE AS NEEDED lN THF �,H�NNFU BEGIN PAVEMENT CT4 1�:(1(1 M -I - DENOTES TYPF III GUARDRAIL CONNECTION REQ'D. �UNK I_N. � SEE "GUARDRAIL ANCHORAGE FOR VERTICAL CXIS I WG 30' EASEMENT CONCRETE GARRTER RAIL" SHEETe !'B 26 PG 391 N07E,GUARDRAIL LENGTHS AS SHOWN INCLUDE ANCHOR UNIIS. N OTE: FoR PAVEMENT LAYOUT & EASEMENT LAYOUT 0.01 ACRES OF SEE "ROADWAY DETAILS" SHEET I OF 2. TEMPORARY IMPACT FoR o�zvEwav �avouT FOR EC DEVICES s�t ��ROAOwAV oETAZ�s�� sHEEr 2 oF z. STA. 14+52e23 -L- STAe 14� 9He60 -L-. WORK POINT I WORK POINT 2 FILL FACE END BFNT 1 � BENT i G.P. ELEV. 224.10 l��ze 1 SLOPE NORMAL TC FND BENI CAP STAa 1A+38 38 -L (TYPa) � BEGIN APPRO�C;- SLAB 240 7 _7„ LOW CHORD 230 ELtV. 221.3� 220 MILLING LIMITS 210 L00 � qPPROXIMATE NAIURAL GROUND LINF_ 13+00 HP 12 X 53 SIEEL PTLE (TYPJ 1'-0" N E3GRM ( I 14+G0 F � S'-6� (TYPJ Ov08 FTe/FTe (TYPe) �TA.15+5Be74 -L- WORK POINT � � BENT 2 ,�� h3RIDGE STA, 15+28e67 -L- �I I 100 YEI�I� hlehleWe HIGH WATCI� � ELLV.219e5 ELEV.219.3 i (9/96) F F � -- -- �- - —=� --- ELEV. 209.6 N,W.S. ELEV. 208o6J � (10/7/04) 3'-0"� DRILLED PIER� (TYPJ LOW CHORD FLEV, 219.8 LOLA MURRAY BASS DB 1650 PG 918 =V uFNCI,�ITE' �AT_ SFT IN �0" ��J,�I � R=F 75e76' LEFT OF -L�� STA� 15+83v09 ELEVa 213e72 NAVD F38 EXIS I�C 3,?_J' Voe 32 20�-o c �A:� �oaowa� SPANS: ] C� 45-0" RC DECK GIRDCRS END o�NIS r�EZNr. couc� �>>-� ��zcHr a�u�v_nn s Sl A� 16+i8e96 -L- -NOTE:WETLANDS ARE BEYOND CLASS 'B'RIP RAP PROJECT LIMITS. — �� � � 2 TON W! 7 S,Y. GEOTEXIILE � (TYPo) � NJ ?AVLMGNT % � s � n �71 z5voo -�� � � �, �n GR LENGTH = 93'-9"� �� � � + / � � � �x. Riw � _���� - _- � i� � �v I I � � ,o� �� � ,,_ —� r � � � �� � w �� 4�a�_ .w��r�, _, �- � I� �zsuiv � � rq �'�'a � � L Ca�3' 9' R BC � � ��� � � � t�" CSr W/ � i �Ov� � � � = v'YC.��\ �f� �3� �Ti1�INED / c' j� � �' � � : � � I. �,�;; ;�n°s���L���. .� U r� �^�' `-"�% _�'�, � � � - �'I� � � � \ T � � a � `�' � � w � � �" a - -- - --- - - - - \_ �- — _ — -- -. _ ---.-.. � , ', L ,,,', , � . i ~ TBDI W/ NARROW � � SLOT FLAT GRATE o � � � �, , i S� 11�8 � � - -- -....-- - --- - -- -- -- -------- - - - - Y - - -....-- �° � ----- -------- V � _N`l- °�a -- ,� �� 000�,� �� __ �,� LENGTH 81� �>" �iYFF 350 f�.R. ANi FiOR �� ��� ���-� . � r � �� �,o,No� � � ��oR. �F� �� eu � rE� .: , �.� Y, "�'. � �� � � � _-,_ �� � x XX x x'i i i'� �� �'�--r�=�—r�- _-��F''i� � � r�'l, o� ���� _ �t. — �re�riw � � WORK POTNT 4 �� WOODS � sTA, i6=os,i; -! - � �� � '� EXT.S?ING UTILITIES TO �"c \ I� r �FI.00ATED BY O i�ERS� TY 0 WILSON LOL-�- Ml�2 AY BASS< � � \\\\\� DB 1599 , r, gq� �» DB 1650�G 918 � � i�� � � � � � � � � V IF IF If � \ � � I � SITE 1 TEMPORARY � � I� � � � � FILL IN � � � � I� � � SURFACE IF � � — _\ {� I WATER � � � � � � � � _WL�- SITE 1 414 SF STREAM & WETLAND IMPACTS I NOTES TOTAL 414 SF I ll METHOD II CLEARING AND GRUBBING 2)NO MORATORIUM FOR NASH °32 STAe 16+o5.i1 -�- LNOTE: WETLANDS ARE BEYOND 3) TURKEY CREEK IS A BWE LINE STREAM WORK POINT 4 PROJECT LIMITS. SHOWN ON THE BUNN EAST USGS QUAD FILL FACE END BFN'f ? MAP G. P. ELEVo 222.59 PROJECT N0, 17BPo4oRo52 sTA �0+��_9h �- NASH ENO Ai r��oa� � s At COUNTY Nn I>AVEMENr _ �rao � r+2seoo -�- STATION� 15+28067 -L- � /�i// - � � Mz��1N� uMl�rs (TYP.) �CLASS II RIP RAP DENOTES UNCLASSIriF_D 2' IIiICK W/ GEOTEXTILC � (TYPJ STRUCIURE EXCAVAT-ON EXISTING SUBSTRUCTURF (RETAIN BELOW FLEV.209,6) � �IOP OF CAUSEWAY � 15+00 (TYPICAU t6=00 FLFV. = 7_09a5 PROFILE ALONG � SURVEY SCALE : 1" = 2Q' F - F I.X�U F.I�D 17+00 PAaEO A.: -�MULKEY ���OG�I���S� Df�G1 r��I�� �� s �66��.4�.s �� �I��3 IN�L G�� ��P6�4f�t��YB�� www.M�,�..E,���.�o., �roLACrS DR�DG� N0.32 SFIEET 1 OF 2 N � • � • � � � + � � 1� �� � � � � �`� V � � d: O � V \�\ BONNIE RUTH PERRY SITE 1 DB 117i PG 155 RAYMOND PERRY & �- WIFE BONNIE Re PERRY ��� ^ � \ DB 1128 PG 731 ____ _ f�'� 36"CONC `,R�TATN BEGIN PAVCMCNI � BEGIN APPROACH SLAf STA, 14+ 8,38 -L- STA.13+00.00 -L-� � � ` � '� N I I C� I ENGTH 75'-0" � R DIUS = �'-0" FX. R/W� i � PP ��� y� � ; i� / / //A,, \ yGRAVEL lL.� X ��� f� � � ]52'-105�$" I OTAL LENG i H � 6_:LI_ FACE �i0 FILL FACE ALONG ... SURVFY A6'-A115" � 60'-13�G" � 46'_4 � SPAN A I SPAN B I �f�AN C �\ `-��' ) � Z %. �T�Rk�� � k � - _ � � ,-� � ; � �Cn nnn nnn�uv.��,�s..� _ � _ �"� _ xxx �rxuxxuxuxx � � , - ,--' T — _ ��, � 'nnnnnnnnn. � c�`h°` I .�.�- XSZSl�S���X`. �" -' - ° g nnn , nl�nn , ,_ � F _-"' - - - -- - _ _ - _ _ _- - - -- -- = F =- -- -- - - - � �t o� ����_ � _ ���� '��n GR LENG i I I- h0' � 0" �\ i�O�r, � ��� �-� TO NC 97 RA�,i uS 1� �` o� � � SIJRV�" L WC 2°ll I. � `'� � 0'11' S8`C '.� °00'00" ?0' 3S ` �,°Pe)�� ����,. . `� � G `�� � � , � � a --- �- � ------ -------- -------- � 1= ---- ----- "------- !8"RCP- `- _�. �jv' ---- �- �tr- ��O , � . - -'- -'--'-'-'-'-'- - '---- �_,,/r15 i.,s....= �% '--- ------ --- - �'" � , r .. . _ _ _ - —�� — — ` i j � + � � �,'— / / � / ��'f I i �, � SLOPE STAKE � � �/���� � ��� LINE (TYPJ A -1 1 �T � -RLMO [�/�/ /� ��� � ii h�. � � \� � STA. 15+28,67 TI — . �v * �, �' I I��2� �� LOLA MURRAY BASS DB 1650 PG 918 SITE 2 EI�D APPROACH SLAB � S�fA� 16+ISe96 -L- =V uFNCI,�ITE' �AT_ SFT IN �0" ��J,�I � R=F 75e76' LEFT OF -L- STA� 15+83v09 ELEVa 213e72 NAVD F38 CLASS 'B' RIP RAP � 2 TON W/ 7 S.Y. GEOTEXTILE (TYPo) � GR LENGTH = 93'- F + / — � / �a _ s� K�-6�ao�� � \���_ �r ryJc�G�? 0.��, oC VVGO{3�� = , - �_� G o� �_ ;� ,o�n� �� ��r �°��,� �„ CSF W/2 eL t�( W5 � EXIS I�C 3,?_J' Voe 32 20'-0 C FA:� �OADWA' SPANS: ] C� 45-0" RC DECK GIRDCRS END o�NIS REINF. CONC� �l�_� �EIGHT ASU�M_i�iTS -NOTE:WETLANDS ARE BEYOND PROJECT LIMITSa — �� � / ��ND PAVLMENT I S � ld�7+25v00 -L �� V � ; � � � � � � � I EX. R/W � � � � I�� � PP -' � � �ISTTI� � � � w� � � L Ca�3 �9 RCBC � � � _ vc, �f ���E 'Fj E Ti1�I N E D _, ; A � � ,�" � � � �� J� F � � i� � - - >- � — _ \ L —-- - �o , ' � . -- .. H ��� � BDT W/ NA�xOW �, �� SI Q? FI.A GF2A1`�. -- � -= � . _ — — � _ _ — , -_ -.. o � � �� - � �, -� S� 1�i58 � � , � 0 _-. _°-- �1� -��a� �� � ��`B2A-- ------- - -- ----------------------.... ------ � ��� � �� k,�� � ��� ��SJo� O _�-_ --- � �� �� � �� ,�� � L ,��,Oo00�°� ______ - ----" �iYFE-350 G.R. ANCHOR ���-� � � ,� GR LENGTI, 81' 3" � � � �k / � � (TYP. U.O.NJ '� V `�1 �X + SHLDR. BFRM GJTTrR ('YPJ �'� `��� Q� �� x\'� x�i �c� X X si i i i7 �- �r �_�-�_-����.�' � ��\ �r,'�-. �� ' � -�—,- , ��r� �t� � � - — �� - � �� ��xe Riw �-�'�>��`���`j � - � ..— �, �-i � � � � � � / ��� �Xe r�iw WOODS � ___-�� � � � N WQ�! �' NT 2 � WORK POINT 3 WORK POTNT 4 � WOODS � �" STAe1�l+9ne"0 -L� ��" � SIA.15+5&e74 -� STA.I6+OS,ll -L- � � � ��; - - �s°RC�-� -- PDE-I 6�� �� \ � � - _-- REMOVI� WOODS J � \ \ �� I� r RELqCATED BYLOiy�R��O 3;� _ '"� �yF „ 1?_" C0�'C � � i� -I� ������ -�� --------- EL IA Re MORGAN CITY 0 WILSON LOL-�- Mk�2 AY BASS � ' ,"�� �� � PB 3 PG 46 � DB 1599 G 841 �� �DB 1650�G 918 � � i� � �� ; w S I T E�, �� V I� I� I� I � P � � � �� - � �'�, SITE 4 P�AN �° J -'�GENE T. VICK & � `�' - BUFFER BUFFER � I� I F\ ' S�A-r `- 20 ZONE 1 ZONE 2 ��\����� ' WIFF CIN�Y P. VIC;K IMPACTS IMPACTS \ � � � \ � � ,K�;xS��5�5�5� euFFER zoNE � ���NOTts �r�fl � � E��� BoRE ��o�� �o��TZONSe � ��� � B U F F ER I M P A C T S DENOTES TYPF III GUARDRAIL CONNECTION REQ'p, SITE 1 2.122 SF 216 SF � � � GUNK I_N. � SEE "GUARDRAIL ANCHORAGE FOR VERTICAL \� � ��� {L I V V V V V V V CONCRETE GARRTER RAIL" SHEETe ������� BUFFER ZONE 2 ExISiwG 30' EASEMENT SITE 2 661 SF 327 SF � ;� � IF � NOTES �� �����- PB 26 PG 39I N07E, GUARDRAIL LENGTHS AS SHOWN INCLUDE � WLg -- ll METHOD II CLEARING AND GRUBBING ANCHOR UNIiS. �— 2)NO MORATORIUM FOR NASH �32 �- �� SITE 3 622 SF 194 SF EXCAVATION h oR PAVEMENT LAYOUT & EASEMENT LAYOUT 3) TURKEY CREEK IS A BLUE LINE STREAM 3,856 SF ��E "ROADWAY DETAILS" SHEET I OF 2. SHOWN ON THE BUNN EAST IJSGS OIJAD SITE 4 838 SF 469 SF MAP FOR DRIVEWAY LAYOUT `i3oap��o�nc�' CLASS II RIP RAP s�t RoAOwAr oETAZ�s sHEEr 2 oF 7. ' 00�o Oo00o � = 2,636 SF TOTAL A,243 SF 1,206 SF �000 o� o0 od STA. 14+52e23 -L- S7Ae 14�9He60 -L-_ I �TA. 15+5Be74 -L- STAe 16+05.11 -L- WORK PO1Ni I WORK POINT 2 WORK POINT � WORK POINT 4 -NOTE: WETLANDS ARE BEYOND EXISTING TRANSPORTATION FACIUTY � BENT 2 �LLL FACE �ND B�N"f 2 FILL FACE END �3fNT 1 � BENT i G.P. ELEV. 224.10 G, P, ELEVo 22?_.59 PROJECT LIMITS. BEGIN PAVEMENT l��ze 1 SLOPE NORMAL STA.13'00.00 -L- STAa1A+3g3g -L TO FND BENI CAP� BCGIN APPRO�C;- SLAB �TYPa) � 240 7'-7„ LOW CHORD 230 ELtV. 2i1.3 220 MILLING LIMITS 210 ' L00 � qPPROXIMATE NAIURAL GROUND LINF_ 13+00 F � ,�� h3RIDGE STA, 15+28e67 -L- �I I 100 YLI�I� HIGH WATCIZ � ELEV.219.3 �i� F vi-iewe ELLV.219e5 LOW CHORD �g�96� FLEV, 279.8 rF PROJECT N0, 17BPo4oRo52 sTA �0+��_9h �- NASH ENO Ai r��oa� � s At COUNTY Nn I>AVEMENr _ �rao � r+2seoo –�– STATION� 15+28067 —L— �_ __ _ �roLACrS DR�DG� N0.32 SFIEET 1 OF 2 HP 12 X 53 ��������� � � -�- - --���� ,�+— -_ - - - _ -�- STEEL PILES� ELEV.209.6 ��-y�� MILLING LIMLTS , (TYP.) (TYPJ ���„ Ov08 N,W.S. E� ------- --- �---- ��� ( fYl J LEV. 20806 �CLASS II RIP RAP 1'-0"MINe (Il�/�/l�4) 2' I IiICK W/ GEOTEXTILC �'i;�i�j DENOTES UNCLASSIr i F_D FTe/FTe � (TYPJ YCIIlL/1�l STRUCIURE EXCAVALON E3CRM (TYPe) (T;pe) �'-0"� DRILLED PIER (TYPJ EXISTING SUBSTRUCTURF (RETAIN BELOW FLEV.209,6) I � 14+00 15+00 ?6=00 PROFILE ALONG � SURVEY SCALE : 1" = 2Q' F - F I.X�U F.I�D 17+00 r;PaaEO er: -�MULKEY ���OG�I���S� Df�G1 r��I�� �� s �66��.4�.s �� �I��3 IN�L G�� ��P6�4f�t��YB�� www.M�,�..E,���.�o., N � • � • � � ��\ + t \ � 1� �� � � � � �`� V � � d: O � V \�\ BONNIE RUTH PERRY SITE 1 DB 117i PG 155 RAYMOND PERRY & �-_ WIFE BONNIE Re PERRY �, � �', DB 1128 PG 731 = _ — S- - = ----�fC�_ � 36„CON� �-_-� � `,f�ETATN / S��GIN APPROACH SLAf F3EGIN PAVEMENT SiA,14+�8,38 -L- �STA.13+00.00 -L-� � � � N � � C� L�NGTH - l i'-0" � � R D [OS = �' U"-� _ EX. R/W� I � i:, � i � ,'J / � / � . y %�/ / yX �'i� � /� � , GRAVEL ���� I��\ 'O/ ]52'-105�$" I OTAL LENG i H � 6_:LI_ �ACE i0 FILL FACE ALONG ... SURVFY A6'-47 „ 60'-l3 " � 46'-4' SPAN A SPAN B I �f�AN C �\ `-��' ) � Z %. ��I�V�CEr � \ yREFI� � �— ��„ � � , -�'� � � � �Cn nnn n'.nn�,nu�.��ls..� � � �"�� - � � ! � �xux �rxux�xuxuxx � _ � - _ - " — � T _ �a 1- ,� !r;nn,� �nnn,�nn '. - - " '� � -� ' -� x�� � � �u �u _-�- ,= ' � ��� �'� � i g_ � x. .. ,n�� �� ��nnnn� T � , �F-,-- _ _ _- ---- - ° , _ - - -- - - _ \ -�� _- - - - � �;1 \"v�� i 's.z.x� ` � �_ � a� - .�. cr� �EN�; �i : �o _o„ �;A �c�, - 'o�, �� `-- ��o Nc y� � RA�,� us � i5� a�O`� °o� � su:�v�� � ;�c z�i� i � � 0'11' S8`L °00'00„ 20' BS' �P,)�� ���,� �, ' ,�� � STA. 15+28,��7 I �I---- � � �i�+ � r�� i r _ _ s� ,�. ?;'� "' LOLA MURRAY BASS DB 1650 PG 918 SITE 2 EI�D APPROACH SLAB � S�fA� 16+ISe96 -L- =V uFNCI,�ITE' �AT_ SFT IN �0" ��J,�I � R=F 75e76' LEFT OF -L�� STA� 15+83v09 ELEVa 213e72 NAVD F38 CLASS 'B' RIP RAP � 2 TON W! 7 S,Y. GEOTEXIILE (TYPo) � GR LENGTH = 93'- s� � 6����� ��k`' - _ ` —�l� r� / cO�co a�� �a�_ W'OElf3�, =-�, --��� � �,; ��� ���� ���`: , , _ , r -o� � ��,e �a — wi, ; ����� � r, ---- � \�,��o' �, � \ ��. -° -- � -_- =-= -- -- - r— - - - - - k� '� � �` � � , �� ,. -------- -- �;� ` " ��� �l � �a , =�, � -- _ -- -.... ------- , ��� , _ I- -�- -�- - - - - - - - _ ------- - - -- -- - - - - - ----- ---- --- ------ -- — __ 8 R P � �i � � � �� y� _ -� � � `� „r � � � r ° / � i �� � � K � � � � � � N �, ?�'� � � � � �� — — � — � � � � �_' � ��� � ��,j��� � �� �� '�� u��-0� )On�-- -- -- GR LENGTH 81, 3„ ��YNF-350 C.R. ANCHOR � � �- ���1-, _ _ 1 1�� � � — - — � , -� �/ � X f - � '<i< /l\ , � T (P� :J,O,IVo) �y SLOPE STAKc A 1 1�� s �RL'M� F����/ /�'�i�������i`� � ��jc�,,,,� � '—� ILDR. BFr�i�� C�TTER f PJ �f�'� �`� � � �� L L� I_ T'v � T Y � o � � � �� � � / '� ��,� p��/�/�/ V � % _ �, - � , �- �� _ �� � -� ��'l�` \ ��� ( ' � � � � � -�. -� ' � / / ,�i�7���.i�>i��i�� � �� '�, X�i ">( X>CX X X� �% �/� � � �_�'� C �_�''_„z— _ _ � - -- ��, _ j _-- °--� — — -- � % � � —�� �� �'�xe Riw ��'_���— - � � � � %; � � � i ��e ��iw i � WOODS � -�� � � N WQRK P NT 2 � WORK POINI 3_� WORK POTNT 4 � WOODS � -- �" S�I�Ae1�1+9n�0 L� ��" � �SIA.15+58e74 -L-` STA,16=05,ll -L- � � -�s°RC� -;PDE-� � � I� �%` � EXT.S?ING UTILITIES TO �c � `��� "� -- - ---� - -- � �r�_MOV� ��� �„ � �` . � -� I� � � �Fi_ocATE� aY o���RS� ��, � , ____ � w000s __--- � ,��1�„�0 ,-� � � � _� \���� � ---------- , � EL IA Re MORGAN CITY 0 WILSON LOL-�- Mk�2 AY BASS � � , ' PB 3 PG 46 DB 1599 , r 841 � �DB 1650�G 918 � � i�� � ��E�. F C � �-o � � � � � � � `� � �� -�"�� �'�, ; w SITE 4 PLAN < SITE �, � � � -'�GENE T. VICK & � `�' - BUFFER BUFFER � I� I F\ ' S�A-r `- 20 ZONE 1 ZONE 2 ������� ' WIFF CIN�Y P. VICK IMPACTS IMPACTS \ � � � \ � � ,K�;xS��5�5�5� euFFER zoNE � ���NOTts �r�fl � � E��� BoRE ��o�� �o��TZONSe � ��� � B U F F ER I M P A C T S DENOTES TYPF III GUARDRAIL CONNECTION REQ'p, SITE 1 2.122 SF 216 SF � � � GUNK I_N. � SEE "GUARDRAIL ANCHORAGE FOR VERTICAL \� � ��� {L I V V V V V V V CONCRETE GARRTER RAIL" SHEETe ������� BUFFER ZONE 2 ExISiwG 30' EASEMENT SITE 2 661 SF 327 SF � ;� � IF � NOTES �� �����- PB 26 PG 39I N07E, GUARDRAIL LENGTHS AS SHOWN INCLUDE � WLg -- ll METHOD II CLEARING AND GRUBBING ANCHOR UNIiS. �— 2)NO MORATORIUM FOR NASH �32 �- �� SITE 3 622 SF 194 SF EXCAVATION h oR PAVEMENT LAYOUT & EASEMENT LAYOUT 3) TURKEY CREEK IS A BLUE LINE STREAM 3,856 SF ��E "ROADWAY DETAILS" SHEET I OF 2. SHOWN ON THE BUNN EAST IJSGS OIJAD SITE 4 838 SF 469 SF MAP FOR DRIVEWAY LAYOUT `i3oap��o�nc�' CLASS II RIP RAP s�t RoAOwAr oETAZ�s sHEEr 2 oF 7. ' 00�o Oo00o � = 2,636 SF TOTAL A,243 SF 1,206 SF �000 o� o0 od STA. 14+52e23 -L- S7Ae 14�9He60 -L-_ I �TA. 15+5Be74 -L- STAe 16+05.11 -L- WORK PO1Ni I WORK POINT 2 WORK POINT � WORK POINT 4 -NOTE: WETLANDS ARE BEYOND EXISTING TRANSPORTATION FACIUTY FILL FACE END �3fN1" 1 � BENT i � BENT 2 �LLL FACE �ND B�N"f 2 G.P. ELEV. 224.10 G, P, ELEVo 22?_.59 PROJECT LIMITS. > >�/ze � s�oPE NoRMA� 'i��T��`1D zae67 -�- PROJECT N0, 17BPo4oRo52 BEGIN IAVEMENT STA.13=00.00 -L- TO FND BENI CA� � STA lo+ige9h -L- � --- NASH �a + - - - e�czN APPROnc';: s�n� i ENO Ai rs�aoa� � s A� COUNTY _:Nn I>AVEMENr 240 7'-7" 100 YEI�R I�II hI W -- - - LOW CHORD 230 ELtV. 2i1.3 220 MILLING LIMITS 210 ' L00 � qPPROXIMATE NAIURAL GROUND LINF_ EXIS I�C 3,?_J' Voe 32 20'-0 C FA:� �OADWA' SPANS: ] C� 45-0" RC DE�K GIRDCRS END o�NIS REIN� CONC� �l�_� �EIGHT ASU��M_i�iTS -NOTE:WETLANDS ARE BEYOND PROJECT LIMITS. — �� � / � NJ ?AVLMGNT � % I S i ld�71 25v00 -L I� V � ; � � �� � ER. R!W � � � �\ \_I �J I � \ i � � � � ��� , w � � ' \ � L Ca�3 9' RCBC � ; � ; „c � �f� �3� �Ti1�INED I : X ���J-`-,, � ,� \> I� �;! - ;i� �� r.�' �� ���� �"� � \� — �� i H �en� wi NA�xow ���� si or F�.a �Ha�r�. _� — ,- -�—, -- � o � � � 0 S� 1158 � - 13+00 F � HIGH WATCIZ � ELEV. 219.3 � F ELLV.219e5 LOW CHORD �g�96� FLEV, 279.8 rF s � ao . r+2�eoo -�- STATION� 15+28067 —L— �_ __ _ �roLACrS DR�DG� N0.32 SFIEET 1 OF 2 HP 12 X 53 ��������� � � —�- - --���� ,�+— -_ - - - _ -�- STEEL PILES� ELEV.209.6 ��-y�� MILLING LIMLTS , (TYP.) (TYPJ ���„ Ov08 N,W.S. E� ------- --- �---- ��� ( fYl J LEV. 20806 �CLASS II RIP RAP 1'-0"MINe (Il�/�/l�4) 2' I IiICK W/ GEOTEXTILC �'i;�i�j DENOTES UNCLASSIr i F_D FTe/FTe � (TYPJ YCIIlL/1�l STRUCIURE EXCAVALON E3CRM (TYPe) (T;pe) �'-0"� DRILLED PIER (TYPJ EXISTING SUBSTRUCTURF (RETAIN BELOW FLEV.209,6) I � 14+00 15+00 ?6=00 PROFILE ALONG � SURVEY SCALE : 1" = 2Q' F - F I.X�U F.I�D 17+00 r;PaaEO er: -�MULKEY ���OG�I���S� Df�G1 r��I�� �� s �66��.4�.s �� �I��3 IN�L G�� ��P6�4f�t��YB�� www.M�,�..E,���.�o.,