HomeMy WebLinkAboutNC0021547_2021 Pretreatment Annual Report Review_20220725Regional Pretreatment Annual Report Review
NC0021547_PAR Review Form 202116
Regional Pretreatment Annual Report (PAR) Review
Is the PAR on time? Does it have two copies?
Did they send any other submissions with it?
Included? ADEQUATE? POTW noted Corrections? Regional Office: ARO
Narrative YES NO NA YES NO NA POTW: Franklin
PPS Form YES NO YES NO NPDES Permit No. NC0021547
SNCR YES NO YES NO Report Period: 01/2021 to 12/2021
IDSF YES NO YES NO
Full Modified
For modified programs evaluate shaded
items only. A Narrative is required for a
modified program only if there are SIUs
in SNC.
Allocation Table YES NO YES NO
Compliance Schedules YES NO NA YES NO NA
Public Notice YES NO NA YES NO NA
Program Information YES NO YES NO YES NO
Historical SNC YES NO NA YES NO NA YES NO NA
If No, check recommendation below:
1. Have at least 90% of SIU permits been issued within 180
days of expiration? (See Allocation Table).
Yes No Not req’d NOD NOV QNCR NCP Civil Penalty
Assessment
2. Were at least 80% of SIUs inspected? (See PPS Form) Yes No Not req’d NOD NOV QNCR NCP Civil Penalty
Assessment
3. Has effective enforcement been taken against industries in
SNC, including those causing pass-through or interference? (See
Narrative and SNCR Form)
Yes No NA NOD NOV QNCR NCP Civil Penalty
Assessment
4. Does public notice cover all SIUs in SNC? Yes No NA NOD NOV QNCR NCP Civil Penalty
Assessment
Note: Exceptions should be explained in the comment section below:
Lauren Armeni should be added as the DWR Regional Contact.
Reviewed By: Lauren Armeni Date: 07/25/2022