Loading...
HomeMy WebLinkAboutRevised SuppEZ-2020-Version-2.1.3SUPPLEMENT-EZ COVER PAGE FORMS LOADED 1 Project Name Huber Tech Manufacturing Ex. & Passivation 2 Project Area (ac)20.06 3 Coastal Wetland Area (ac)0 4 Surface Water Area (ac)0 5 Is this project High or Low Density?High 6 Does this project use an off-site SCM?No 7 Width of vegetated setbacks provided (feet)50 8 Will the vegetated setback remain vegetated?Yes 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project?No 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 1 17 Rainwater Harvesting (RWH) 18 Green Roof 19 Level Spreader-Filter Strip (LS-FS) 20 Disconnected Impervious Surface (DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED 27 Name and Title:Riyad Baroudi, Project Manageer, PE 28 Organization:Stewart 29 Street address:101 N. Tryon Street 30 City, State, Zip:Charlotte, NC, 28202 31 Phone number(s):704-909-3543 32 Email:rbaroudi@stewartinc.com Certification Statement: Designer ______________________________________________ Signature of Designer ______________________________________________ Date I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. PROJECT INFORMATION NUMBER AND TYPE OF SCMs: DESIGNER CERTIFICATION COMPLIANCE WITH 02H .1003(4) Seal 10/24/2022 DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions?No FORMS LOADED Entire Site 1 2 4 Type of SCM Sand Filter 5 Total drainage area (sq ft)206474 362855 6 Onsite drainage area (sq ft)206474 362855 7 Offsite drainage area (sq ft)0 0 8 Total BUA in project (sq ft)180774 sf 251341 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft) sf sf 10 New BUA not on subdivided lots (subject to permitting) (sf)26572 sf 260477 sf 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft)60971 sf 4408 sf - Sidewalk (sq ft)2482 sf 827 sf - Roof (sq ft)68816 sf 124248 sf - Roadway (sq ft)48505 sf 121858 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) 13 New infiltrating permeable pavement on subdivided lots (sq ft) sf sf 14 New infiltrating permeable pavement not on subdivided lots (sq ft) sf sf 15 Existing BUA that will remain (not subject to permitting) (sq ft)154202 sf 9136 sf 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 13% 48% 19 Design storm (inches)1.0 in 1.0 in 20 Design volume of SCM (cu ft)15836 cf 15836 cf 21 Calculation method for design volume Schueler's Method Schueler's Method 22 DRAINAGE AREA INFORMATION ADDITIONAL INFORMATION Drainage area #1 contains existing impervious area and discharges to the south west. Drainage area #2 contains new impervious area and discharges north to the stream buffer. This run-off is collected into a Sandfilter and treated before it discharges to the stream. Please use this space to provide any additional information about the drainage area(s): 251341 sf 260477 sf 1 Drainage area number 2 2 Minimum required treatment volume (cu ft) 15836 sf 3 Is the SCM sized to treat the SW from all surfaces at build-out?Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)?Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume?Yes 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)?N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes 18 SHWT elevation (fmsl)754 19 Type of sand filter (open or closed)Open 20 If closed, will the filter will be pre-cast or pour-in-place? 21 If closed, top of grate elevation (fmsl) 22 Is this sand filter designed to attenuate peak flows? No 23 Volume that can be retained in the sediment chamber (cubic feet) 16200 cf 24 Will there be a permanent pool in the sediment chamber? No 25 Bottom of the sediment chamber (fmsl)769.00 26 Area of the sediment chamber (square feet)2700 sf 27 Physical depth of the sediment chamber (inches)36 in 28 Ponding depth in the sediment chamber, above any permanent pool (inches)36 in 29 Elevation of top of weir between chambers (fmsl) 772 30 Volume that can be retained in the sand chamber (cubic feet)20996 cf 31 Bottom of the sand chamber (fmsl)769.00 32 Area of the sand chamber (square feet)2700 sf 33 Physical depth of the sand chamber (inches)36 in 34 Ponding depth in the sand chamber, above the sand surface (inches)36 in 35 Elevation of the bypass device (fmsl)772 36 Type of bypass device Outlet Structure (4- sided weir) 37 Mechanism for distributing flow over the sand surface rip-rap dissipater 38 Sand specification for sand chamber ASTM C-33 39 Depth above underdrain pipe (inches)12" Min. 40 Will the media be maintained to drain at least two inches per hour at the sand surface?Yes 41 Is at least one clean-out pipe provided at the low point of each underdrain line?Yes 42 Will clean-out pipes be capped? Yes 43 Please use this space to provide any additional information about the sand filter(s): SAND FILTER Sand Chamber Sediment Chamber ADDITIONAL INFORMATION GENERAL MDC FROM 02H .1050 SAND FILTER MDC FROM 02H .1056 Sand Filter 3 11:07 AM 10/31/2022