Loading...
HomeMy WebLinkAbout20121054 Ver 2__20211207CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. <mailto:report.spam@nc.gov> Lyle, We agree that the Upper Pigeon House Interceptor Replacement project does not require an individual 401 water quality certification for the proposed activities. Please let me know if you have any questions. Thanks, Amir Amir R. Hadjimiry, PE Project Manager D 984.255.7047 <tel:984.255.7047> LICENSED NC www.dewberry.com <https://urldefense.com/v3/__https://www.dewberry.com/__;!!HYmSToo!Jwcs6tOKSh8m_l9qMp1vvTUKw48BKx4h4gWm-zaMCWK4a9XkybYN_UZI-CmIgpdOOPOn$> From: Phillips, George L CIV USARMY CESAW (USA) <George.L.Phillips@usace.army.mil> Sent: Friday, December 3, 2021 1:12 PM To: Cohn, Colleen M <colleen.cohn@ncdenr.gov>; Trone, Rick V <rick.trone@ncdenr.gov>; Toler, Todd <todd.toler@raleighnc.gov>; Hadjimiry, Amir <ahadjimiry@Dewberry.com> Subject: Corps Receipt of 401 WQC / Upper Pigeon House Interceptor Replacement / Raleigh / Wake County / SAW-2021-02115 [CAUTION] External Email. DO NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all suspicious emails. North Carolina Division of Water Resources (NCDWR): After review of the submitted Upper Pigeon House Interceptor Replacement project, dated 10/05/2021, and the enclosed Nationwide Permit 58 Water Quality General Certification (GC) 4256, dated December 18, 2020, it appears that an individual 401 water quality certification (WQC) is NOT required from the NCDWR for the proposed activities. If our assumption is incorrect and this proposed activity does require an Individual WQC, please respond to this notification as soon as possible in order for our office to meet the Corps’ Nationwide Permit 45-day review requirement. Applicant/Consultant: Please note, should we finalize our review prior to receiving the individual 401 WQC (if required), you will receive a provisional general permit verification from the Corps. If applicable, once a 401 WQC is issued or waived by the DWR, the Corps will provide you with a final general permit verification. If applicable, your proposed work shall not commence until after the 401 WQC has been issued or waived AND until a final general permit verification has been provided to you. Lyle Phillips Regulatory Specialist US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 25. Fax: (919) 562-0421 Email: George.L.Phillips@usace.army.mil <mailto:George.L.Phillips@usace.army.mil> We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at https://regulatory.ops.usace.army.mil/customer-service-survey/ <https://urldefense.com/v3/__https://nam02.safelinks.protection.outlook.com/?url=https*3A*2F*2Fregulatory.ops.usace.army.mil*2Fcustomer-service-survey*2F&data=04*7C01*7Cahadjimiry*40dewberry.com*7Cb6922ce4e634409b1cb108d9b688bfcc*7C84b7f537fb7642b2ac1b415a5597766c*7C0*7C0*7C637741521781284046*7CUnknown*7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0*3D*7C3000&sdata=2uX3znRu8oelCjU8*2F7eHBTFSSVKPvqHf0on4L9z1HVA*3D&reserved=0__;JSUlJSUlJSUlJSUlJSUlJSUlJQ!!HYmSToo!Jwcs6tOKSh8m_l9qMp1vvTUKw48BKx4h4gWm-zaMCWK4a9XkybYN_UZI-CmIgof57O0q$> . Thank you for taking the time to visit this site and complete the survey. Visit Dewberry’s website at www.dewberry.com <https://urldefense.com/v3/__https://www.dewberry.com__;!!HYmSToo!Jwcs6tOKSh8m_l9qMp1vvTUKw48BKx4h4gWm-zaMCWK4a9XkybYN_UZI-CmIggBl2rNr$> If you’ve received this email even though it’s intended for someone else, then please delete the email, don’t share its contents with others, and don’t read its attachments. Thank you.