HomeMy WebLinkAboutNCC223692_Site Plan or Location Map (2)_20221028III PHASING SEQUENCE
INSTALL TEMPORARY CONSTRUCTION ENTRANCE
I` 2. INSTALL SEDIMENT BASIN AND BAFFLES
3. INSTALL PERIMETER SILT FENCE
II III 4. CONST. ALL STRUCTURAL FILL FOR BUILDING PAC
LOT, AND LANDSCAPE AREAS
m' a 5. INSTALL STORMWATER CONVEYANCE SYSTEM
ICI �I 6. INSTALL STORMWATER INLET PROTECTION DEVIC
llll p 7. CONST. BUILDING
' 7'
V �
CONTRACTOR SHALL IDENTIFY & MARK AREAS ON THIS
PAGE FOR THE FOLLOWING: ,
Vap unit Symbol
4013p Lfn rt NamLL
Aue s }n A0I
Parma nt of AGI
Ro
Rmar Ae 3rrd 'It03rne 5o{5. 0 b:�
ant slops,
ianally faud-ed
WmB
Wicl hwn firm sandy loam, 1
0 pnarnt slopes, rarer
fled
4-4
gfl.6-"
Totals far Areat of In-tei est
u
00.0%
GENERAL NOTES
1. ALL MEASURES INSTALLED FOR SEDIMENT CONTROL SHALL BE CHECKED AT THE BEGINNING AND
END OF EACH DAY WHEN CONSTRUCTION IS OCCURRING TO ASCERTAIN THAT THE MEASURES ARE
IN PLACE AND FUNCTIONING PROPERLY. ANY DAMAGE OBSERVED WILL BE REPAIRED BY THE END
OF THAT WORKING DAY. MEASURES SHALL BE MAINTAINED UNTIL THE ARCHITECT/ENGINEER
DETERMINES THAT THEY ARE NO LONGER NEEDED.
2. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED
ACCORDING TO THE STANDARDS OF THE CITY/COUNTY AND AS REQUIRED BY STATE AND FEDERAL
LAWS.
3. A COPY OF THE APPROVED EPSC (EROSION PREVENTION SEDIMENT CONTROL) PLANS SHALL BE
MAINTAINED AT THE PROJECT SITE AT ALL TIMES. THIS COPY SHALL BE PRESENTED TO THE
CITY/COUNTY REPRESENTATIVES UPON REQUEST.
4. PRIOR TO COMMENCING LAND -DISTURBING ACTIVITIES IN ANY AREA NOT ON THE APPROVED
EPSC PLAN, THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EPSC PLAN TO THE CITY/COUNTY
FOR APPROVAL.
5. ALL EPSC MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING AND
GRADING. THE CONTRACTOR IS RESPONSIBLE FOR ANY ADDITIONAL EROSION CONTROL MEASURES
NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE CITY/COUNTY.
DURING DEWATERING OPERATIONS WATER MUST BE PUMPED THROUGH AN APPROVED FILTERING
DEVICE. THE CITY/COUNTY MAY SUSPEND DEWATERING OPERATIONS IF POLLUTION IS OBSERVED.
6. THE CONTRACTOR SHALL INSPECT ALL EROSION AND SEDIMENT CONTROL DEVICES AT LEAST
ONCE A WEEK AND AT LEAST ONCE A DAY DURING RAINFALL EVENTS. THE CONTRACTOR SHALL
PERFORM ANY REPAIRS OR MAINTENANCE IMMEDIATELY IN ORDER TO ENSURE EFFECTIVE EROSION
AND SEDIMENT CONTROL. THE CONTRACTOR SHALL MAINTAIN A RECORD OF ALL INSPECTIONS AND
MAINTENANCE ACTIVITIES AT THE PROJECT SITE. THIS RECORD SHALL BE MADE AVAILABLE UPON
REQUEST TO THE CITY/COUNTY.
7. ALL AREAS DISTURBED SHALL BE STABILIZED ACCORDINGLY. WHEN THE SITE IS BROUGHT TO
FINAL GRADE IT MUST BE STABILIZED WITHIN 14 DAYS EXCEPT SWALES, DITCHES AND STEEP
SLOPES WHICH REQUIRE GROUNDCOVER WITHIN 7 DAYS. DISTURBED AREAS NOT AT FINAL GRADE
MUST BE STABILIZED WITHIN 21 DAYS.
SEED AND SOD NOTES
1. ALL DISTURBED AREAS INCLUDING WASTE AREAS TO BE SEEDED OR SODDED (IF NOT NOTED TO
BE RDBIP-RAPPED, OR HARD SURFACED). THE AREA NOTED ON THE PLAN TO BE SEEDED SHALL BE
SPREAD WITH 4" MINIMUM OF TOPSOIL. ALL AREAS TO BE DISKED, LEVELED, AND HAND RAKED. THE
TOPSOIL LAYER SHALL BRING ALL TURF AREAS TO FINISH GRADE. SURFACE AREA SHALL BE ROLLED
TO REMOVE LUMPS. FOREIGN MATERIALS SUCH AS ROCKS, LIMBS, STICKS, ETC. TO BE COLLECTED
AND REMOVED DURING CULTIVATION AND RAKING OPERATIONS.
2. INSTALLATION OF SEED SHALL BE BETWEEN MARCH 1 TO JUNE 15 OR SEPTEMBER 1 TO OCTOBER
15. IF SEEDING IS DONE IN BETWEEN OCTOBER 15 AND MARCH 1, A SEED BLEND WILL BE USED
CONSISTING OF 20% ANNUAL RYE.
3. GRASS SEED SHALL BE A TYPE WHICH WILL THRIVE IN THIS PROJECT AREA. SUBMIT PROPOSED
SEED MIXTURE TO OWNER FOR APPROVAL. FERTILIZER SHALL BE 10-10-10 TYPE 1 GRADE A. USE
APPROXIMATELY 5 LBS. OF GRASS SEED, 10 LBS. OF FERTILIZER FOR EACH 1000 SQ.FT. OF GROUND
AREA TO BE SEEDED. COVER ALL SEEDED AREAS WITH 3 BALES OF WHEAT STRAW FOR EACH 1000
SQ.FT. WATER DAILY FOR 15 DAYS OR AS REQUIRED BY WEATHER CONDITIONS. AFTER SEED HAS
GERMINATED, ALL THIN SPOTS SHALL BE RE -SEEDED.
4. THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR WATERING, MOWING AND OTHER
MAINTENANCE TO SEEDED AREAS UNTIL THE PROJECT IS ACCEPTED BY THE OWNER. A MINIMUM OF
90% COVERAGE OF SOUND, HEALTHY GRASS SHALL BE REQUIRED FOR ACCEPTANCE.
5. EMBANKMENTS/SLOPES GREATER THAN 3:1 SHALL BE EITHER BE SEEDED AND COVERED WITH AN
EROSION CONTROL MAT (JUTE MESH ENKAMAT) OR INSTALLED WITH SOD FOR PROPER
STABILIZATION. SOD TO BE STAKED WITH EITHER WOOD STAKES OR U-SHAPED METAL PINS FLUSH
WITH GRADE.
:�Y�]��ya_1��:3�:�Xe]N]►/_1:ALe]:Z�D01►I_1►1�Z�]�_Ry9x�ll��1a_\r�011��1a:�1t'/�1►■1:1�9:Z�111x�1/_1:��_1
I�:1'��]:Z�b9���7_1��►1��O�I_\�01►I_1:7�_Fy_F�9,xylI1��1:1►1���9�I_1►6Y�L1��7i]:�Y�7�
8. MIX SEED, FERTILIZER AND PULVERIZED MULCH WITH WATER USING EQUDBIPMENT SPECIFICALLY
DESIGNED FOR HYDROSEED APPLICATION.
9. APPLY SLURRY UNIFORMLY TO ALL AREAS BEING SEEDED. RATE OF APPLICATION AS REQUIRED
TO OBTAIN SPECIFIED SEED SOWING RATE.
10. THE SOD SHALL BE RELATIVELY FREE OF DISEASES AND WEEDS. STONES LARGER THAN 1 %" IN
ANY DIMENSION, PLANT ROOTS AND OTHER MATERIAL DETRIMENTAL TO A HEALTHY STAND OF TURF
SHOULD BE REMOVED. DELIVERED SOD THAT HAS BECOME DRY, MOLDY OR YELLOW FROM
HEATING, OR HAS IRREGULARLY SHAPED PIECES THAT ARE TORN OR HAVE UNEVEN ENDS SHALL BE
REJECTED.
11. THE SOD BED WILL BE LOOSENED TO A DEPTH OF 3" TO A SMOOTH, EVEN SURFACE AND SHALL BE
GRADED TO SUCH AN ELEVATION SO THE SOD, WHEN IN PLACE, SHALL BE FLUSH WITH ANY
ADJACENT SEEDED TURFED AREA, PAVEMENT, CURB OR OTHER STRUCTURES EXCEPT WHEN
OTHERWISE NOTED.
12. LAY SOD WITHIN 24 HOURS OF STRDBIPPING. DO NOT LAY DORMANT SOD OR IF GROUND IS
FROZEN. LAY SOD TO FORM A SOLID MASS WITH TIGHTLY FITTED JOINTS. DO NOT OVERLAP.
13. WATER SOD WITH FINE SPRAY IMMEDIATELY AFTER PLANTING. DURING FIRST WEEK, WATER
DAILY OR MORE FREQUENTLY AS NECESSARY TO MAINTAIN MOIST SOIL TO DEPTH OF 4 INCHES.
14. PRIOR TO PLACING THE SOD, FERTILIZER 10-10-10 TYPE 1 GRADE A SHALL BE APPLIED
UNIFORMLY. SOD SECTIONS SHALL BE HARROWED, RAKED OR OTHERWISE INCORPORATED INTO
THE SOIL. THE SOIL BED, WHEN DRY, SHALL BE MOISTENED TO THE LOOSENED DEPTH.
15. SOD SHALL BE WETTED THOROUGHLY, ROLLED AND TAMPED SUFFICIENTLY TO INCORPORATE
THE ROOTS INTO THE SOD BED AND TO ENSURE TIGHT JOINTS BETWEEN THE SECTIONS OR
STRDBIPS.
16. ALL SODDED AREAS SHALL BE MAINTAINED, WATERED AND REPAIRED AS NECESSARY BY THE
LANDSCAPE CONTRACTOR UNTIL FINAL ACCEPTANCE OF THE PROJECT.
17. THE LANDSCAPE CONTRACTOR SHALL GUARANTEE ALL SEEDED OR SODDED AREAS FOR A
PERIOD OF ONE YEAR FROM THE DATE OF COMPLETION. LANDSCAPE CONTRACTOR IS NOT
RESPONSIBLE FOR ACTS OF NATURE THAT MAY CAUSE EROSION, NEGLECT BY THE OWNER OR
DAMAGED BY ANIMALS OR MACHINES.
CONSTRUCTION LEGEND
ISF - SILT FENCE
C9
]IP - INLET PROTECTION
C9 - TEMPORARY CONSTRUCTION ENTRANCE
RCD - ROCK CHECK DAM
C9
tssm - SLOPE STABILIZATION MATTING
C9
- • • - - DISTURBED AREA
0sFO - SILT FENCE OUTLET
C10
CONST.430 L.F. OF SILT FENCE #4
TOTAL AREA DISTURBED:
. - 32.95 ACRES (PARCEL 1 & 2)
GRAPHIC SCALE:
0' 60' 120' '180
SCALE: 1" = 60'
REVISIONS
10-20-22 - NCDEQ Review/
Comments
U
z c
a U 00
j co O
I x c Z 00
O O W O
Qz�P4 r-,
c\I
O W
zwazo
C)
z �
W
JOB NUMBER: 22-3285-L
DATE: 10/17/2022
SCALE: 1" = 60'
DRAWN BY: B. McDANIEL
CHECKED BY: B. ZACKERY
APPROVED BY: B. ZACKERY
C4a
EROSION
CONTROL
PHASE 2
Z: \SITEDEVELOPMENT\2022 PROJECTS\REALTY LINK - NC FAYETTEVILLE DUNN\SITEDEV\FINAL PLANS\PHASE II\C4 - EROSION CONTROL.DWG