Loading...
HomeMy WebLinkAboutNCC223692_Site Plan or Location Map_20221028COPYRIGHTS AND DISCLAIMERS THE COPYRIGHTS TO ALL DESIGNS AND DRAWINGS ARE THE PROPERTY OF ACES. REPRODUCTION OR USE FOR ANY PURPOSE OTHER THAN THAT AUTHORIZED BY ACES IS FORBIDDEN. ACES ASSUMES NO RESPONSIBILITY FOR DATA SUPPLIED IN AN ELECTRONIC FORMAT. DATA IS PROVIDED ELECTRONICALLY AS A CONVENIENCE AND THE RECIPIENT IS RESPONSIBLE FOR VERIFYING ACCURACY TO THE HARD COPY OF THE CURRENT DESIGN DRAWINGS WHICH HAVE BEEN SEALED AND SIGNED. IN THE EVENT OF INCONSISTENCIES BETWEEN THE ELECTRONIC AND THE HARD COPY DATA, THE RECIPIENT IS RESPONSIBLE FOR OBTAINING CLARIFICATION ON WHICH PREVAILS. THE RECIPIENT RELEASES ACES, ITS EMPLOYEES, CONSULTANTS AND AGENTS FROM ANY AND ALL CLAIMS ARISING IN ANY WAY FROM THE CONTENT OR PROVISION OF THE ELECTRONIC DATA. NOTHING SHALL REDUCE OR DIMINISH ACES'S OWNERSHIP OF OR COPYRIGHT IN THE DATA OR ITS COMPILATION OR ARRANGEMENT. ANY ANALYSIS, SOFTWARE OR FORMATTING IN THE ELECTRONIC DATA IS CONSIDERED PROPERTY OF ACES. THE RECIPIENT OF ELECTRONIC DATA IS PROHIBITED FROM REDISTRIBUTING OR USING ANY DESIGN OR DRAWING INFORMATION WITHIN THE FILES FOR ANY REASON OTHER THAN IT WAS ORIGINALLY DESIGNED WITHOUT THE WRITTEN CONSENT OF ACES. o'o,� osoo /n/ �s �89�q 0 moo' REV 10-17-22 PHASING SEQUENCE 1 1. INSTALL TEMPORARY CONSTRUCTION ENTRANCE 2. INSTALL SEDIMENT BASIN AND BAFFLES 3. INSTALL PERIMETER SILT FENCE 4. CONST. ALL STRUCTURAL FILL FOR BUILDING PAD, PARKING LOT, AND LANDSCAPE AREAS 5. INSTALL STORMWATER CONVEYANCE SYSTEM 6. INSTALL STORMWATER INLET PROTECTION DEVICES 7. CONST. BUILDING 8. INSTALL CURB, STONE, AND ASPHALT/CONCRETE ON DRIVE AISLES AND PARKING LOT 9. STABILIZE ALL DISTURBED AREAS WITH SOD OR SEED & STRAW 10. CONVERT SEDIMENT BASIN TO FINAL WET POND DESIGN. 11. REMOVE EROSION CONTROL DEVICES CONTRACTOR SHALL IDENTIFY & MARK AREAS ON THIS PAGE FOR THE FOLLOWING: 1. EQUIPMENT STORAGE 2. MATERIALS STORAGE 3. CONCRETE WASH OUT 4. WASTE MANAGEMENT SERVICES TOTAL AREA DISTURBED: • • - 32.95 ACRES (PARCEL 1 & 2) W.Nortn I r, of-na IL www.nc871.sr4 � vFTTF� NSF p�N*a4FFQ p8 99 sc G 06 1 y 44C �3 REV 10-17-22 1 o7o SF /'+l1AICT QAA I C 11C CII T CCAI/'+C �i7� 14iap Un v 5Frrhu; Map Unit Mamt Aoms in AOi P=rcant olAAY Ro Roanokt and'VOame soTs- 0 be i ant spas~ me ianally'Iaoded W-nB WicQumfirms Earrdy+ loam, 1 lc� 6 peeve It sl4pr=s, r3rel'f flcoc--d = ' =J. _=_ Tls f-Or Brea of Interest 3 5 EO.fr�ir PARCEL 1 BASIN BASIN TO BE USED AS A 2 FOOT DEEP SEDIMENTATION BASIN DURING CONSTRUCTION. PERIMETER OF TEMP. SEDIMENT BASIN SHOWN AS DASHED LINE. SEE SHEET C10 FOR BAFFLE INSTALLATION AND SEDIMENT BASIN DETAILS REV 10-17-22 I CONST. 514IL.F. OF ISILT FEINCE #3 CONST. 444 L.F. OF SILT FENCE #4 CONST. 210 L.F. OF SILT FENCE #5 d AT` Db'-k8b*A 128.73 / CONST. 200 L.F. OF SILT FENCE #6 & of c / e SEED AND SOD NOTES 1. ALL DISTURBED AREAS INCLUDING WASTE AREAS TO BE SEEDED OR SODDED (IF NOT NOTED TO BE RDBIP-RAPPED, OR HARD SURFACED). THE AREA NOTED ON THE PLAN TO BE SEEDED SHALL BE SPREAD WITH 4" MINIMUM OF TOPSOIL. ALL AREAS TO BE DISKED, LEVELED, AND HAND RAKED. THE TOPSOIL LAYER SHALL BRING ALL TURF AREAS TO FINISH GRADE. SURFACE AREA SHALL BE ROLLED TO REMOVE LUMPS. FOREIGN MATERIALS SUCH AS ROCKS, LIMBS, STICKS, ETC. TO BE COLLECTED AND REMOVED DURING CULTIVATION AND RAKING OPERATIONS. f4W-l441-1:144toiD]7.1:i14JAI01il»:4JA/_10140hdt-I44o110[ell3y:14o1r1g4.1 3. THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR WATERING, MOWING AND OTHER MAINTENANCE TO SEEDED AREAS UNTIL THE PROJECT IS ACCEPTED BY THE OWNER. A MINIMUM OF 90% COVERAGE OF SOUND, HEALTHY GRASS SHALL BE REQUIRED FOR ACCEPTANCE. 4. EMBANKMENTS/SLOPES GREATER THAN 3:1 SHALL BE EITHER BE SEEDED AND COVERED WITH AN EROSION CONTROL MAT (JUTE MESH ENKAMAT) OR INSTALLED WITH SOD FOR PROPER STABILIZATION. SOD TO BE STAKED WITH EITHER WOOD STAKES OR U-SHAPED METAL PINS FLUSH WITH GRADE. 5. SOD SHALL BE REGIONALLY GROWN AND OF A SPECIES THAT WILL THRIVE IN THE PROJECT AREA. 6. HYDROSEED ALL NEW LAWN AREAS AS SPECIFIED UNLESS PLANS CALL FOR SOD. 7. APPLY SLURRY UNIFORMLY TO ALL AREAS BEING SEEDED. RATE OF APPLICATION AS REQUIRED TO OBTAIN SPECIFIED SEED SOWING RATE. 8. THE SOD SHALL BE RELATIVELY FREE OF DISEASES AND WEEDS. STONES LARGER THAN 1 %2' IN ANY DIMENSION, PLANT ROOTS AND OTHER MATERIAL DETRIMENTAL TO A HEALTHY STAND OF TURF SHOULD BE REMOVED. DELIVERED SOD THAT HAS BECOME DRY, MOLDY OR YELLOW FROM HEATING, OR HAS IRREGULARLY SHAPED PIECES THAT ARE TORN OR HAVE UNEVEN ENDS SHALL BE REJECTED. 9. THE SOD BED WILL BE LOOSENED TO A DEPTH OF 3" TO A SMOOTH, EVEN SURFACE AND SHALL BE GRADED TO SUCH AN ELEVATION SO THE SOD, WHEN IN PLACE, SHALL BE FLUSH WITH ANY ADJACENT SEEDED TURFED AREA, PAVEMENT, CURB OR OTHER STRUCTURES EXCEPT WHEN OTHERWISE NOTED. 10. LAY SOD WITHIN 24 HOURS OF PREPPING. DO NOT LAY DORMANT SOD OR IF GROUND IS FROZEN LAY SOD TO FORM A SOLID MASS WITH TIGHTLY FITTED JOINTS. DO NOT OVERLAP. 11. WATER SOD WITH FINE SPRAY IMMEDIATELY AFTER PLANTING. DURING FIRST WEEK, WATER DAILY OR MORE FREQUENTLY AS NECESSARY TO MAINTAIN MOIST SOIL TO DEPTH OF 4 INCHES. 12. SOD SHALL BE WETTED THOROUGHLY, ROLLED AND TAMPED SUFFICIENTLY TO INCORPORATE THE ROOTS INTO THE SOD BED AND TO ENSURE TIGHT JOINTS BETWEEN THE SECTIONS. 13. ALL SODDED AREAS SHALL BE MAINTAINED, WATERED AND REPAIRED AS NECESSARY BY THE LANDSCAPE CONTRACTOR UNTIL FINAL ACCEPTANCE OF THE PROJECT. 14. THE LANDSCAPE CONTRACTOR SHALL GUARANTEE ALL SEEDED OR SODDED AREAS FOR A PERIOD OF ONE YEAR FROM THE DATE OF COMPLETION. LANDSCAPE CONTRACTOR IS NOT RESPONSIBLE FOR ACTS OF NATURE THAT MAY CAUSE EROSION, NEGLECT BY THE OWNER OR DAMAGED BY ANIMALS OR MACHINES. GENERAL NOTES 1. ALL MEASURES INSTALLED FOR SEDIMENT CONTROL SHALL BE CHECKED AT THE BEGINNING AND END OF EACH DAY WHEN CONSTRUCTION IS OCCURRING TO ASCERTAIN THAT THE MEASURES ARE IN PLACE AND FUNCTIONING PROPERLY. ANY DAMAGE OBSERVED WILL BE REPAIRED BY THE END OF THAT WORKING DAY. MEASURES SHALL BE MAINTAINED UNTIL THE ARCHITECT/ENGINEER DETERMINES THAT THEY ARE NO LONGER NEEDED. 2. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO THE STANDARDS OF THE CITY/COUNTY AND AS REQUIRED BY STATE AND FEDERAL LAWS. 3. A COPY OF THE APPROVED EPSC (EROSION PREVENTION SEDIMENT CONTROL) PLANS SHALL BE MAINTAINED AT THE PROJECT SITE AT ALL TIMES. THIS COPY SHALL BE PRESENTED TO THE CITY/COUNTY REPRESENTATIVES UPON REQUEST. 4. PRIOR TO COMMENCING LAND -DISTURBING ACTIVITIES IN ANY AREA NOT ON THE APPROVED EPSC PLAN, THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EPSC PLAN TO THE CITY/COUNTY FOR APPROVAL. 5. ALL EPSC MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING AND GRADING. THE CONTRACTOR IS RESPONSIBLE FOR ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE CITY/COUNTY. DURING DEWATERING OPERATIONS WATER MUST BE PUMPED THROUGH AN APPROVED FILTERING DEVICE. THE CITY/COUNTY MAY SUSPEND DEWATERING OPERATIONS IF POLLUTION IS OBSERVED. 6. THE CONTRACTOR SHALL INSPECT ALL EROSION AND SEDIMENT CONTROL DEVICES AT LEAST ONCE A WEEK AND AT LEAST ONCE A DAY DURING RAINFALL EVENTS. THE CONTRACTOR SHALL PERFORM ANY REPAIRS OR MAINTENANCE IMMEDIATELY IN ORDER TO ENSURE EFFECTIVE EROSION AND SEDIMENT CONTROL. THE CONTRACTOR SHALL MAINTAIN A RECORD OF ALL INSPECTIONS AND MAINTENANCE ACTIVITIES AT THE PROJECT SITE. THIS RECORD SHALL BE MADE AVAILABLE UPON REQUEST TO THE CITY/COUNTY. 7. ALL AREAS DISTURBED SHALL BE STABILIZED ACCORDINGLY. WHEN THE SITE IS BROUGHT TO FINAL GRADE IT MUST BE STABILIZED WITHIN 14 DAYS EXCEPT SWALES, DITCHES AND STEEP SLOPES WHICH REQUIRE GROUNDCOVER WITHIN 7 DAYS. DISTURBED AREAS NOT AT FINAL GRADE MUST BE STABILIZED WITHIN 21 DAYS. CONSTRUCTION LEGEND kSF - SILT FENCE C9 iP - INLET PROTECTION 11 LI C9 TCE - TEMPORARY CONSTRUCTION ENTRANCE C9 RCD - ROCK CHECK DAM C9 - • • - - DISTURBED AREA GRAPHIC SCALE: 0' 60, 120' 180' SCALE: 1" = 60' REVISIONS 10-17-22 - NCDEQ Review/ Comments 10-20-22 - NCDEQ Review/ Comments U z c Lo a U 00 co 0 coz� 0 0 W O � O W zwazo C) z � W JOB NUMBER: 22-3171-L DATE: 10/17/2022 SCALE: 1" = 60' DRAWN BY: B. McDANIEL CHECKED BY: B. ZACKERY APPROVED BY: B. ZACKERY C4 EROSION CONTROL Z: \SITEDEVELOPMENT\2022 PROJECTS\REALTY LINK - NC FAYETTEVILLE DUNN\SITEDEV\FINAL PLANS\C4 - EROSION CONTROL.DWG