Loading...
HomeMy WebLinkAbout20220435 Ver 1_[External] Provisional NWP 29 Verification, SAW-2021-02598, Woodland Church Road Subdivision_20220901CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. <mailto:report.spam@nc.gov> Dear Sean Clark, This is a provisional general permit verification. Your proposed work may be authorized by the above referenced general permit provided a 401 Certification is issued or waived. Once a 401 Certification is issued or waived, the Corps will provide you with a final general permit verification. Your proposed work shall not commence until after the 401 Certification has been issued or waived and until a final general permit verification has been provided to you. Additional special conditions may be added to the final general permit verification. Please contact me if you have any questions regarding this provisional verification or the Corps of Engineers regulatory program. --- April R. Norton Regulatory Division US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 441-3637 Fax: (919) 562-0421 Email: April.R.Norton@usace.army.mil <mailto:April.R.Norton@usace.army.mil>