HomeMy WebLinkAbout20220435 Ver 1_Woodland Church Rd DWR#20220435_20220513Good evening,
I am beginning my review of the above referenced project, and in order to complete the review, some additional information is required:
1. Please provide the Division with a copy of your response to the April 14, 2022, Request for Additional Information from the US Army Corps of Engineers (copy attached). [15A NCAC 02H
.0502(c)]
2. Please provide additional details regarding avoidance and minimization. It appears that the road could be moved to reduce impacts. [15A NCAC 02H .0502(c)]
3. Impact maps show all stream impacts as a red line. Please revise to differentiate temporary and permanent impacts. [15A NCAC 02H .0502(c)]
4. Please differentiate permanent impacts for the culverts from rip rap dissipator pads in the impact table. [15A NCAC 02H .0502(c)]
5. Please provide more information on the proposed SCM outlet in EX-1. Could this impact be moved to reduce buffer impacts? [15A NCAC 02H .0502(c)]
6. SCMs are shown on the impact exhibits but not on the site plan. Please provide a site plan that shows the SCMs. [15A NCAC 02H .0502(c)]
Thanks,
Colleen Cohn
Environmental Specialist II
North Carolina Department of Environmental Quality
Division of Water Resources
Raleigh Regional Office
3800 Barrett Drive
Raleigh, NC 27609
Office: 919-791-4258
E-mail correspondence to and from this address may be subject to the
North Carolina Public Records Law and may be disclosed to third parties.