HomeMy WebLinkAbout20211201 Ver 1_Pre-Filing Meeting Request 09-07-2022_20221026Project Submittal Interim Form
Updated September 4, 2020
Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type:*
Pre-Filing Meeting Date Request was submitted on:
Name:
Email Address:*
Project Name:*
Is this a public transportation project?*
Is this a DOT project?*
Is the project located within a NC DCM Area of Environmental Concern (AEC)?*
TIP#:WBS#:
County (ies)*
For the Record Only (Courtesy Copy)
New Project
Modification/New Project with Existing ID
More Information Response
Other Agency Comments
Pre-Application Submittal
Re-Issuance\Renewal Request
Stream or Buffer Appeal
9/7/2022
Project Contact Information
Brian Doliber
Who is submitting the information?
bcdoliber@ncdot.gov
Project Information
Fort Fisher Ferry Basin Dredging 2022-2023
Yes
No
Yes
No
Yes No Unknown
16.71001
(Applies to DOT projects only)
New Hanover
Please upload all files that need to be submited.
Describe the attachments or add comments:
*
I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the
best of my knowledge and belief.
I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
I agree that submission of this online form is a “transaction” subject to Chapter 66, Article 40 of the NC General
Statutes (the “Uniform Electronic Transactions Act”);
I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General
Statutes (the “Uniform Electronic Transactions Act”);
I understand that an electronic signature has the same legal effect and can be enforced in the same way as a
written signature; AND
I intend to electronically sign and submit the online form.
Signature:*
Submittal Date:
Click the upload button or drag and drop files here to attach document
Ft Fisher_3-9-22.pdf 2.66MB
Only pdf or kmz files are accepted.
The NC DOT Ferry Division is planning to dredge the Fort Fisher Ferry Basin from December of 2022 to
February 2023. It will be maintenance dredging within a permitted ferry basin. This is the pre-filing meeting
request. An official application will be submitted sometime after November 7 when total material to be removed
has been determined, and timeline is better defined.
By checking the box and signing box below, I certify that:
09/07/2022
Is filled in automatically once submitted.