STATE OF NORTH CAROLINA
DEPART'MENT OF TRANSPORTATION
PAT L. MCCRORY
GOVERNOR
December 9, 2014
Mr. Steve Kichefski
Asheville Regulatory Field Of6ce
US Anny Corp of Engineers
151 Patton Avenue
Asheville, NC 28801-5006
ANTHONY J. TATA
SECRETARY
SUBJECT: Pipe Replacement on SR 1876 (Mt. Ruhama Church Road), Catawba
County
Dear Mr. Kichefski:
The North Carolina Department of Transportation requests authorization to replace a
deteriorating pipe on SR 1876 (Mt. Ruhama Church Road) in Catawba County. NCDOT
proposes to replace the existing 40-foot long 112" x 75" CMAP with a 40-foot long 117" x 79"
CMAP with five feet of riprap for inleUoutlet structure stabilization. A shallow scourhole is
locaYed at the outlet of the existing pipe; therefore, the one foot pipe burial is based upon the
natural streambed elevation directly downstream of the scourhole. A temporary cofferdam
pumping system will be used to divert the stream around the construction site as needed. The
scope of the work involves 10 feet of permanent impacts to an unnamed tribuYary Yo Maiden
Creek, which is classified as Class W S-II; HQW Waters by the Division of Water Resources.
The project is not located wiYhin % mile of any criYical watershed area nor is SR 1876 a rural or
urban arterial; therefore, hazardous spill basins are not required. Enclosed is Yhe hazardous spill
basin checklist. This office has conducYed a GIS and field survey for the project for historical
sites and threatened/endangered species sites. No sites listed on the National Register of Historic
Places are located in the vicinity of the project nor did there appear to be any eligible structures.
This office has conducted a GIS and field survey for the project threatened/endangered species.
The Division 12 Environmental Office conducted a tt�reatened/endangered species survey on
November 21, 2014. The federally listed species far Catawba County (USFWS listed dated
November 04, 2014) include the Dwarf-flowered Heartleaf (Hexastylls nan�ora) and the
Schweinitz's sunflower (Helianthus schweinitzii). Natural Heritage Program records document
the nearesT Dwarf-flowered Heartleaf location appro�xnately A.8 miles north of the proposed
project azea. The heartleaf is usually found on dry to moist ravine slopes (usually north facing and
of the oak-hickory-pine forest type) and in boggy areas near springheads. The project area has no
steep slopes and is heauily wooded and there is little potential habitat within the proposed project
area and no species were observed during the site visit. No impact on this species is anticipated.
Natural Heritage Program records docuxnent the nearest Schweinitz's sunflower location
approximately 20.8 miles southeast of the proposed project area. The sunflower is usually
found in upland open areas protected from shade or excessive competition. There is no
SR 1876, Mt Ruhama Road
Page 2
December 9, 2014
suitable habitat located within the project footprint and no species were observed. No
impact on this species is anticipated.
I have enclosed a pre-construction norification for a NW#3, skefches of planned activities
and location maps relarive to the project.
Project information for the 401 Automated Payment Procedure is as follows:
• Wark order number: 150463-55120005-12B.201811-3300
• TIP#: NA
• Project Category: $240.00 Fee
If you haue any questions or concerns please feel free to contact me at (704) 480-9044. Thank
you for your time and consideration on this matter.
Respectfully yours,
Reuben Chandler, P.E.
Division Engineer
Twelfth Division
�
BY: ���,,.�
C� -�.-^-___.._
Trish Beam
Division 12 Environmental Supervisar
Enclosuxes
oF,�°°-�,FA
�2 `, 9L
�� q�
O ���� T
O�ce Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification PCN Form
A. A licant Information
7. Processing
1a. Type(s) of approval sought from the
Corps: � Section 404 Permit ❑ Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 3 or General Permit (GP) number:
1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes � No
1 d. Type(s) of approval sought from the DWQ (check all that apply):
� 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
❑ 401 Water Quality CeAifcation — Express ❑ Riparian Buffer Authorization
1 e. Is this notifcation solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required? CeAification:
❑ Yes � No ❑ Yes � No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes � No
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h ❑ Yes � No
below.
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes � No
2. Project Information
2a. Name of project: SR 1876 (Mt. Ruhama Church Road)
2b. County: Catawba
2c. Nearest municipality / town: Madien
2d. Subdivision name:
2e. NCDOT only, T.I.P. or state 12b201811
project no:
3. Owner Information
3a. Name(s) on Recorded Deed: NC DOT Right of Way
3b. Deed Book and Page No.
3c. Responsible Party (for LLC i f
applicable):
3d. Street address:
3e. City, state, zip:
3f. Telephone no.:
3g. Fax no.:
3h. Email address:
Page 1 of 11
PCN Form — Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: ❑ Agent ❑ Other, specify:
4b. Name: Reuben Chandler
4c. Busines s name N.C. Department of Transportation, Division 12
(if applicable):
4d. Street address: 1710 East Marion Street
4e. City, state, zip: Shelby, NC 28151
4f. Telephone no.: 704-480-9020
4g. Fax no.: 704-480-5401
4h. Email address: rchandler@ncdot.gov
5. AgenUConsWtant Information (if applicable)
5a. Name: Trish Beam
5b. Business name N.C. Department of Transportation, Division 12
(if applicable):
Sc. Street address: 1710 East Marion Street
5d. City, state, zip: Shelby, NC 28151
5e. Telephone no.: 704-480-9044
5f. Fax no.: 704-480-5401
Sg. Email address: pdbeam@ncdot.gov
Page 2 of 11
PCN Form — Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): NA
1 b. Site coordinates (in decimal degrees): Latitude: 35.604937 Longitude: - 81.13144
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: <.10 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to Ut to Maiden Creek
proposed project:
2b. Water Quality Classification of nearest receiving water: WS-II; HQW
2c. River basin: Catawba
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Existing 40-foot long 112" x 75" CMAP with headwalis; landuse is forested. Culvert is on paved secondary road.
3b. List the total estimated acreage of all existing wetlands on the property:
0
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
100 feet
3d. Explain the purpose of the proposed project:
The purpose of the proposed work is to replace the deteriorating culvert for the safety of the travelling public.
3e. Describe the overall project in detail, including the type of equipment to be used:
The North Carolina Department of Transportation requests authorization to replace a deteriorating pipe on SR 1876 (Mt.
Ruhama Church Road) in Catawba County. NCDOT proposes to replace the existing 40-foot long 112" x 75" CMAP with
with a 40-foot long 117" x 79" CMAP with five feet of riprap for inlet/outlet structure stabilization. A shallow scourhole is
located at the outlet of the existing pipe; therefore, the one foot pipe burial is based upon the natural streambed elevation
directly downstream of the scourhole. A temporary cofferdam pumping system will be used to divert the stream around
the construction site as needed. All areas affected by temporary cofferdam system will be restored to pre-project
conditions. All Best Management Practices will be utilized during the course of the project. The Project will be
constructed using typical heavy equipment (trackhoe, backhoe, etc.)
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past? ❑ Yes � No ❑ Unknown
Comments: Jurisdictional stream determination made by
Division 12 DEO.
4b. if the Corps made the jurisdictional determination, what type
of determination was made? ❑ Preliminary ❑ Final
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (if known): Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
Sa. Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
Page 3 of 11
PCN Form — Version 1.3 December 10, 2008 Version
6. Future Project Plans
6a. Is this a phased project? ❑ Yes � No
6b. Ifyes, explain.
Page 4 of 11
PCN Form — Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
❑ Wetlands � Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type ofjurisdiction
number— Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ — non-404, other) (acres)
Tem ora T
W1 ❑ P � T ❑ Yes ❑ Corps
❑ No ❑ DWQ
WZ � P� T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W3 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W4 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
WS ❑ P � T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W6 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g. Total wetiand impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type ofjurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ — non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
Rip rap structural
S1 � P � T stabilization at Ut to Madien � PER � Corps 5-8 10
corners of Creek ❑ INT ❑ DWQ
headwal Is
Temporary Ut to Madien � PER � Corps
S2 ❑ P� T cofferdam bypass Creek ❑ INT ❑ DWQ 5-8 30
pumping
S3 ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S4 ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
SS ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S6 ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
3h. Total stream and tributary impacts *10
3i. Comments: *Permanent Impacts
Page 5 of 11
PCN Form — Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number — (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Tem ora T
01 ❑P❑T
02 ❑P❑T
03 ❑P❑T
04 ❑P�T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If ond or lake construction ro osed, then com lete the chart below.
5a. 5b. 5c. Sd. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
5£ Total
Sg. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surtace area (acres):
Sj. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts re uire miti ation, then ou MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar-Pamlico ❑ Other:
Project is in which protected basin? ❑ Catawba ❑ Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number— Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Tem ora im act re uired?
B1 ❑P❑T ❑Yes
❑ No
B2 ❑P❑T ❑Yes
❑ No
B3 ❑ P ❑ T ❑ Yes
❑ No
6h. Total buffer impacts
6i. Comments:
Page 6 of 11
PCN Form — Version 1.3 December 10, 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Minimization of impacts by installing appropriate erosion control measures.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for ❑ Yes � No
impacts to Waters of the U.S. or Waters of the State?
26. If yes, mitigation is requixed lry (check all that apply): ❑ DWQ ❑ Corps
❑ Mitigation bank
2c. If yes, which mitigat ion option will be used for this
project? ❑ Payment to in-lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ❑ Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
Sa. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 7 of 11
PCN Form — Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3(2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 8 of 11
PCN Form — Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified � yes � No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
Comments: ❑ Yes ❑ No
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project? 0%
2b. Does this project require a Stormwater Management Plan? ❑ Yes � No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Complies with NCDOT's individual
NPDES permit NCS000250.
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program
❑ DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local governmenYs jurisdiction is this project? NA
❑ Phase II
3b. Which of the following locally-implemented stormwater management programs � NSW
apply (check all that apply): ❑ USMP
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No
attached?
4. DWQ Stormwater Pro ram Review
❑ Coastal counties
❑ HQW
4a. Which of the following state-implemented stormwater management programs apply � ORW
(check all that apply): ❑ Session Law 2006-246
❑ Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ❑ Yes ❑ No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No
Sb. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No
Page 9 of 11
PCN Form — Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � yes ❑ No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ❑ Yes � No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ❑ Yes ❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ❑ Yes � No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in � Yes � No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
The project is a minimum criteria project which has low potential for cumulative/indirect impacts and will not result in
additional development which could impact water quality.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
No wastewater generated from project.
Page 10 of 11
PCN Form — Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or � Yes � No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act � Yes � No
impacts?
❑ Raleigh
5c. If yes, ind icate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
NC Natural Heritage Program database and on-site survey.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
No salt marshes, oyster reefs, or seagrass beds located in vicinity of project.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation � Yes � No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
The State Historic Preservation office resources and the Natio�al Register of Historic Places were reviewed for historic
sites in the vicinity of the project; however, the pipe replacement project occurs within a previously impacted area
(NCDOT Right of Way).
8. Flood Zone Designation (Corps Requirement)
Sa. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes � No
Sb. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? FEMA FIRM panal number: 3710366800J
- ..
%�,r� C ���ll�:- r � � ,� . C,��-�.� � � /� ��-/Y
��
ApplicanUAgenYs Printed Name ApplicanUAgenYs Signature Date
(Agent's signature is valid only if an authorization letterfrom the applicant
is provided.)
Page 11 of 11
PCN Form — Version 1.3 December 10, 2008 Version
d �amod H O C�
� /
9L8T �S /
��
�
� i� �
��
�
x
��
•'"• 3
n
Q a
� v
V s
a�
� 3
°ao
ay
a` x
'/
�`_ a
v V \O`
£u
av
ce
��
'� w
:�
h �
S d
� w
<Sr N Y
J �N
N/ y C?0
�%h�
WQ�
p2i �I� tiwnyn� .�W
n o
X�
N �
�S
c+
� 3
X°
w Q
dv
�o
d�
ac x
� d
vto
?v w
��
d oo�i
� `o �
} o
� o d
a z'�
� d �
S }
c
nz+`
� � o
aau
c
t d
3�
+°
`m ,�
3O10
�
a'� �
F c._
°c��
? a
Q }
�}�
oca
V �
QS �
} y1
N
v
'o 0
`a o
m -
a �
n�
�o'
+° i
NV
v o
c d
y'_
tY
�V
�N
M
>
d
° � -�
S C �- oL
t a c t
.-�+ N E L
� U S �
O V ap
6 n a �-+
� p�. Q �
1- S �
r � a �
Ol a,
�� a
� L �
Z °O
a =
m e �
o�
d a�
�ao
w m
o�� '
�+°vo°�
� d a `o
- °= w
O UQ�
� v y �
u_ w �
� N C O
a
��
�'>
a�
aQ
� v
d =
w �
at
o�p
a
��t
�� a
L a
m a �j
w�F
+�O
y��
� V
��Z
�VS
�`}
� V- �
�
.p.
a�
�
�c
r
X�
N y
H =
O1S
Lt
N 3
X�
W <
�V
��
m
K�I
I
V OL I
I
mr I
X I
ti N
" 3
a
Q a
�.�C
V
U �
H 3
ao
��
n X
TT
T��PT
r
0
0
�
a
�
0
�
o ^
p- m
P
�� O
Sa. N _ `rv
o °a
> rv `� �
4 m ,. o�
I t�o �N P�lo
ss d W
I
I
-I -O
� O .
- O O
^ rv
m
0
a
r
r
9�` a
qP'1 °
0
5�`� �
0
9p� m
�
q'hq °�
m-r�
mmmrnv.
�
a
� �
w „�.�i�.
P
1
�
� V �
t � } �
� 6 c s
� � � u
L
� V -� �
O V pp
� n_ a ^
� a �
� � � s �
� a �
�a a
� •L �
Z C°
�
� \�StateofNOrthCarolina Figu�e1
�� D 2paYtlTl ei7.t O f`I' Ya17.S�0Yt.dt1�11 SR-1 s7s � Mt. Ruhama Church Road
NCDOT
HAZARDOUS SPILL BAS1N CHECKLIST
Division: 12 County: C'atawha Project ID: 12b.201811
River Basin: _ Catawba Bridge No: NA
Route: SR 1876
Water Quality Criteria:
Stream: Ut to Maiden Creek
Yes No
Stream Crossing Blue Line On USGS
ORW
WSI
WS II,III OR IV, Crossing Within O.Smi of W.S. Critical Area
Roadwav Criteria:
Route Designation-
Arterial Urban
Arterial Rural
Additional Site Information:
Is a Hazardous Spill Basin Required?
Yes No
i" r�
� t�
Yes No
� �
Criteria Based Upon NCDOT `Best Management Practices for the
Protection of Surface Waters" (March, 1997).