HomeMy WebLinkAbout20211827 Ver 1_USACE Permit_20220302U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW-2019-02335 County: Wake U.S.G.S. Quad: NC-Angier
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Terramor Homes
Karl Beyer
Address: 7208 Falls of Neuse Road, Suite 201
Raleigh, NC 27615
Size (acres) ~82 acres Nearest Town Fuquay-Varina
Nearest Waterway UT to Middle Creek River Basin Neuse
USGS HUC 03020201 Coordinates Latitude:35.597670
Longitude: -78.716519
Location description: The project site is located on the east and west sides of Hilltop Road south of Howard Farm Road in
Willow Springs, Wake County, North Carolina.
Description of projects area and activity: This verification authorizes the permanent discharge of fill material within 0.33 acre
(14,931 square feet) of wetland, the permanent discharge of fill material within 140 linear feet (0.018 acre) of stream channel,
the permanent discharge of fill material within 0.01 acre of open water, the permanent discharge of fill material resulting in
no loss within 27 linear feet of stream channel, the temporary discharge of material within 0.03 acre of wetlands, the
temporary discharge of material and permanent conversion of 0.14 acre of forested wetlands to herbaceous wetlands, and the
temporary discharge of material within 29 linear feet of stream channel.
Applicable Law(s): ☒Section 404 (Clean Water Act, 33 USC 1344)
☐Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: NWP 29. Residential Developments
SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached
Conditions, your application signed and dated 12/14/2021, and the enclosed plans Bexford Subdivision. Any violation of the
attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order,
a Class I administrative penalty, and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit
authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general
permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided
it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization
expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the
nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon
the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the
date of the nationwide and/or regional general permit’s expiration, modification or revocation, unless discretionary authority has been
exercised on a case-by-case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior
to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State
or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of
Engineers regulatory program, please contact George Lyle Phillips III at (919) 554-4884 X25 or George.L.Phillips@usace.army.mil.
Corps Regulatory Official: _____________________________________________________Date: 3/2/2022
Expiration Date of Verification: 3/14/2026
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0
Copy furnished: Collen Cohn – NCDEQ-DWR – 3800 Barrett Drive, Raleigh, NC 27609
Ashley N. Yarsinske – Wildlands Holdings III, LLC. – 1430 South Mint Street, Suite 104, Charlotte, NC 28203
SAW-2019-02335
SPECIAL CONDITIONS
a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance
with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility
Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby
incorporated as special conditions of this permit authorization.
Action ID Number: SAW-2019-02335 County: Wake
Permittee: Terramor Homes, Karl Beyer
Project Name: Bexford
Date Verification Issued: 3/2/2022
Project Manager: George Lyle Phillips III
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: George Lyle Phillips III
Raleigh Regulatory Office
U.S Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
or
George.L.Phillips@usace.army.mil
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
_______________________________________ ______________________
Signature of Permittee Date
U.S. ARMY CORPS OF ENGINEERS
Wilmington District
Page 1 of 2 Form Version 10 June 2020_updated
Compensatory Mitigation Responsibility Transfer Form
Permittee: Terramor Homes, Karl Beyer Action ID: SAW‐2019‐02335
Project Name: Bexford County: Wake
Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved
Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the
transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee’s responsibility to ensure
that Wilmington District Project Manager identified on page two is in receipt of a signed copy of this form before conducting
authorized impacts, unless otherwise specified below. If more than one Mitigation Sponsor will be used to provide the
mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8‐digit Hydrologic
Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must
be provided to the appropriate Mitigation Sponsors.
Instructions to Sponsor: The Sponsor verifies that the mitigation requirements (credits) shown below have been released
and are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified
mitigation, regardless of whether they have received payment from the Permittee. Once the form is signed, the Sponsor
must update the bank ledger and provide a copy of the signed form and the updated ledger to the Permittee, the Project
Manager who issued the permit, the Bank Project Manager, and the District Mitigation Office (see contact information on
page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument.
Permitted Impacts and Compensatory Mitigation Requirements:
Permitted Impacts Requiring Mitigation* 8‐digit HUC and Basin: 03020201, Neuse River Basin
Stream Impacts (linear feet) Wetland Impacts (acres)
Warm Cool Cold Riparian Riverine Riparian Non‐Riverine Non‐Riparian Coastal
0.47
*If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor.
Compensatory Mitigation Requirements: 8‐digit HUC and Basin: 03020201, Neuse River Basin
Stream Mitigation (credits) Wetland Mitigation (credits)
Warm Cool Cold Riparian Riverine Riparian Non‐Riverine Non‐Riparian Coastal
0.8
Mitigation Site Debited: Falling Creek Umbrella Mitigation Banking Instrument: McClenny Acres II Mitigation Site
(List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS
acceptance letter identifies a specific site, also list the specific site to be debited).
Section to be completed by the Mitigation Sponsor
Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for
providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action
ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the Wilmington
District, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide
the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to
ensure compliance associated with the mitigation requirements.
Mitigation Sponsor Name:
Name of Sponsor’s Authorized Representative:
Signature of Sponsor’s Authorized Representative Date of Signature
CESAW-RG (File Number, SAW-2019-02335)
Conditions for Transfer of Compensatory Mitigation Credit:
Once this document has been signed by the Mitigation Sponsor and the District is in receipt of the signed form, the
Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains
responsible for any other mitigation requirements stated in the permit conditions.
Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after
the District is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted
responsibility for providing the mitigation requirements listed herein. When NCDMS provides mitigation for authorized
impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas
may proceed upon permit issuance; however, a copy of this form signed by NCDMS must be provided to the District
within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the District has received this
form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein.
Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative
records for both the permit and the Bank/ILF Instrument. It is the Permittee’s responsibility to ensure that the District
Project Manager (address below) is provided with a signed copy of this form.
If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to
the District, the Sponsor must obtain case‐by‐case approval from the District Project Manager and/or North Carolina
Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance
and a new version of this form must be completed and included in the District administrative records for both the permit
and the Bank/ILF Instrument.
Comments/Additional Conditions: A letter from Wildlands Holdings III, LLC., confirming they are willing and able to accept
the applicant’s compensatory mitigation responsibility, dated 12/13/2021 was included with the preconstruction
notification.
This form is not valid unless signed below by the District Project Manager and by the Mitigation Sponsor on Page 1. Once
signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the
District Project Manager at the address below, 3) the Bank Manager listed in RIBITS, and 4) the Wilmington District
Mitigation Office, 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 (or by email to SAWMIT@usace.army.mil).
Questions regarding this form or any of the permit conditions may be directed to the District Mitigation Office.
USACE Project Manager: George Lyle Phillips III
USACE Field Office: Raleigh Regulatory Office
US Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Email: George.L.Phillips@usace.army.mil
3/2/2022
USACE Project Manager Signature Date of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is
available at http://ribits.usace.army.mil.
0.0
VICINITY MAP
SCALE: NTS
12.08.21
P190419
BEXFORD SUBDIVISONIMPACT MAP EXHIBIT
P1
9
0
4
1
9
_
B
E
X
F
O
R
D
Project #:
SHEET
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:
Bateman Civil Survey Company
Engineers Surveyors Planners
2524 Reliance Avenue, Apex, North Carolina 27539
Phone: 919.577.1080 Fax: 919.577.1081
NCBELS FIRM No. C-2378
SHEET INDEX
SHEET
NUMBER SHEET TITLE
0.0 COVER
1.0 BEXFORD OVERALL
1.1 IMPACT 1 MAP A
1.1 A CROSSING DETAIL
VIEW
1.1 B CROSSING CROSS
SECTION
1.2 IMPACT 2 MAP B
1.2 A CROSSING DETAIL
VIEW
1.3 IMPACT 3 MAP C
1.3 A CROSSING DETAIL
VIEW
1.3 B CROSSING CROSS
SECTION
1.4 IMPACT 4 MAP D
1.4 A CROSSING DETAIL
VIEW
1.4 B CROSSING CROSS
SECTION
1.5 IMPACT 5 MAP E
1.5 A CROSSING DETAIL
VIEW
1.5 B CROSSING CROSS
SECTION
1.6 IMPACT 6 MAP F
1.6 A CROSSING DETAIL
VIEW
1.7 IMPACT 7 MAP G
1.8 IMPACT 3 MAP H
1.9 IMPACT 5 MAP I
1.10 IMPACT 6 MAP J
1.11 BUFFER IMPACTS
1.12 BUFFER IMPACTS
BEXFORD PROJECT
F
M
F
M
F
M
F
M
FM FM
FM FM
FM
S
FM
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIERFIRE BARRIERFIRE BARRIERFIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIERFIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIERFIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
FIRE BARRIERFIRE BARRIER
IMPACT 5 / MAP EREASON: ROADPERMANENT STREAM IMPACT: 58 LF / 314 SFPERMANENT STREAM IMPACT (NO LOSS): 12 LF / 50 SFTEMPORARY STREAM IMPACT: 5 LF / 34 SF
30' ZONE 1
20' ZONE 2
30' ZONE
1
20' ZO
N
E
2
20' ZONE 2
30' ZONE 1
W
W
W
W
W
W
W
N/F JC ROWLAND FARMS LLC.PIN: 0687-41-5886ACREAGE: 37.77 AC.DB 07-E PG 2588ZONING : RMDLAND CLASS: AGRICULTURE
X X
N/F FISH, MARTHAPIN: 0687-33-0737ACREAGE: 18.28 AC.DB 9842 PG 1182ZONING: RMDLAND CLASS: AGRICULTURE
N/F FISH, VICTORPIN: 0687-43-0130ACREAGE: 2.0 AC.DB 16906 PG 2687ZONING: RMDLAND CLASS: RES < 10 AC.
N/F YEARGAN, JULIAPIN: 0687-43-1985ACREAGE: 32.71 AC.DB 9842 PG 1185ZONING: RMDLAND CLASS: SINGLEFAM N/F HOWARD, DANNY & RAY TRUSTEEPIN: 0687-43-7513ACREAGE: 0.95 AC.DB 13824 PG 156ZONING : RMDLAND CLASS: SINGLFAM
N/F HOWARD, DANNY & RAY TRUSTEEPIN: 0687-53-1573ACREAGE: 10.01 AC.DB 13824 PG 156ZONING : RMDLAND CLASS: AGRICULTURE
N/F HOWARD, DANNY& RAY TRUSTEEPIN: 0687-65-2613ACREAGE: 242.04 AC.DB 13824 PG 156ZONING : RMDLAND CLASS: SINGLEFAM
N/F STRICKLAND, DAVID & DINAPIN: 0687-62-4426ACREAGE: 12.58 AC.DB 15750 PG 1294ZONING : RMULAND CLASS: AGRICULTURE
N/F THE PENTECOSTALS OF FUQUAYPIN: 0687-51-7737ACREAGE: 8.89 AC.DB 16137 PG 2779ZONING : RMDLAND CLASS: EXEMPT
N/F JC ROWLAND FARMS LLC.PIN: 0687-41-5886ACREAGE: 37.77 AC.DB 07-E PG 2588ZONING : RMDLAND CLASS: AGRICULTURE
N/F CURRIN, JOE & KIMBROUGH, KATIEPIN: 0687-21-0945ACREAGE: 18.99 AC.DB 99-E PG 1802ZONING : RMDLAND CLASS: AGRICULTURE
HOWARD FARM ROAD(30' ACCESS EASEMENT)
CMP:INV 334.65
CMPINV 334.89
42"
C
M
P
39.6
8
'
@
0
.
6
0
%
C
C
C
C
C
C
FO
FO
F
O
F
O
F
O
F
O
F
O
F
O
X
X
N/F KENNEBEC MEADOWS HOAPIN: 0687-23-3160ACREAGE: 11.26 AC.DB 18467, PG 2038ZONING: RLDLAND CLASS: VACANT
N/F SHIRKMAN, JAMES & LAYLAPIN: 0687-22-5548ACREAGE: 1.01 AC.DB 18353 PG 2058ZONING: RLDLAND CLASS: RES. < 10 AC.
N/F DISANTO, KRISTIN; LUCAS, ERIN &HOWLE, WILLIAMPIN: 0687-22-5254ACREAGE: 0.57AC.DB 18339 PG 340ZONING: RLDLAND CLASS: RES. < 10 AC.
BECKEL ROAD(50' PUBLIC R/W)B.M. 2019, PG. 1970-1972
OH
E
T
EX. JURISDICTIONALWETLANDS
EX. POND
EX. JURISDICTIONAL WETLANDS
EX. JURISDICTIONAL WETLANDS
EX. POND
EX. POND
EX. POND
EX. JURISDICTIONALWETLANDS
EX. JURISDICTIONALWETLANDS
EX. JURISDICTIONALWETLANDS
EX. JURISDICTIONALWETLANDS
EX. JURISDICTIONALWETLANDS
30' ZONE 1
20' ZONE 2
50' NRB
30' ZONE 1
20' ZONE 2
50' NRB
30' ZONE1
20' ZONE 2
50' NRB
30' ZONE1
20' ZONE 250' NRB
30' ZONE1
20' ZONE 2
50' NRB
50' NRB
20' ZONE 2
30' ZONE 1
50' NRB
20' ZONE 2
30' ZONE 1
EX. 8" C900
C
C
C
C
O
H
E
INV. 407.31'
15"
R
C
P
PIPE END NOT FOUND
MB
IMPACT 3 / MAP CREASON: ROADPERMANENT WETLAND IMPACT: 0.13 AC./ 5,864 SFTEMPORARY WETLAND IMPACT: 0.01 AC./ 213 SFPERMANENT STREAM IMPACT: 82 LF/ 483 SFPERMANENT STREAM IMPACT (NO LOSS): 15 LF/ 87 SFTEMPORARY STREAM IMPACT: 4 LF/ 24 SF
20' ZONE 2
30' ZONE 1
RIP RAP TO BE KEYED INTOEXISTING GRADE
VWSE
RETAINING WALL
7
14
4
7
5
4
6
6
6
10
2
2
3
1
2
1
4
SCM #1
SCM #2
SCM #3
SCM #4
SCM #5
SCM #6
2
SCM #7
1
1
FUTURE AMENITY AREA
PSCMAME
6' STE
6' STE
6' STE
6' STE
6' STE
6' STE
6' STE
6' STE
6' STE
6' STE
MAIL KIOSK
6' STE
6' STE
6' STE
MAIL KIOSK
4
6' STE
6' STE
6' STE
6' STE.
6' STE
6' STE
6' STE.
6' STE.
6' STE
6' STE
6' STE
10'x60' TCE
10'x140' TCE
10'x60' TCE
10'x140' TCE
25' TYPE 'B' PB
15'DEE
VWSE
VWSE
PSE
CIP CONCRETEHEADWALL
CIP CONCRETEHEADWALL
RETAINING WALL
25' TYPE 'B' PB
25' TYPE 'B' PB
RETAINING WALL
VWSE
VWSE
VWSE
VWSE
PME
PME
PME
PME
PME
PME
VWSE
PME
25' TYPE 'C' TB
15'DEE
25' TYPE 'C' TB
15' UE25' TYPE 'B' PB
25' TYPE 'B' PB
RETAINING WALL
RETAINING WALL
RETAINING WALL
PSCMAME
RETAINING WALL
VWSE
VWSE
VWSE
VWSE
VWSE
25' TYPE 'B' PB
25' TYPE 'B' PB
PSCMAME
PSCMAME
RETAINING WALL
RETAINING WALL
RETAINING WALL
CIP CONCRETEHEADWALL
CIP CONCRETEHEADWALL
RETAINING WALL
PSCMAME
PSCMAME
RETAINING WALL
25' TYPE 'B' PB
25' TYPE 'B' PB
25' TYPE 'B' PB
25' TYPE 'B' PB
RETAINING WALL
RETAINING WALL
RETAINING WALL
RETAINING WALL
PSCMAME
PSCMAME
CIP CONCRETEHEADWALL
CIP CONCRETEHEADWALL
RETAINING WALL
25' TYPE 'C' TB
25' TYPE 'C' TB
25' TYPE 'B' PB25' TYPE 'B' PB
TCE
RETAINING WALL
VWSE
30' PSE
20' PSE
30' PSE
20' PSE
20' PSE
46' PSE
20'PSCMAME
20'PSCMAME
20' PSE
20' PSE
20' PSE
20' PSE
20' PSE
20' PSE
20' PSE
20' PSE
20' PSE
20' PSE 20' PSE 20' PSE
20' PSE
20'PSCMAME
20' PSE
20' PSE
20' PSE
20' PSE
30' PSE
30' PSE
30'PSCMAME
34' PSE
34' PSE
30'PSCMAME
20' PSE
20' PSE
20' PSE
20' PSE
20' PSE
VWSE
40' FVSE
40' FVSE
30' PUBLICSEWER ESMT.
30' FVSE
10' ASPHALTGREENWAY
61' E-E
TCE
TCE
25' TYPE 'B' PB
25' TYPE 'B' PB
25' TYPE 'B' PB
25' TYPE 'B' PB
25' TYPE 'B' PB
25' TYPE 'C' TB
VWSE
15'DEE
25' TYPE 'C' TB
40'PSCMAME
20' PSE
20' PSE
20' PSE
20' PSE
40' FVSE
15'DEE
PSCMAME
25' TYPE 'C' TB
10' GRADING EASEMENT10' GRADING EASEMENT5' ROW DEDICATION 5' ROW DEDICATION
VWSE
VWSE
20' PSE
20' PSE
VWSE
30' SAE
30' SAE
30' SAE
30' SAE
20' PSE
20' PSE
CIP CONCRETEHEADWALL
6' STE
6' STE
6' STE
6' STE
6' STE
25' TYPE 'B' PB
25' TYPE 'B' PB
25' TYPE 'B' PB
25' TYPE 'B' PB
10' PSE
20' PSE
30' PSE
20' PSE
20' PSE
45' PSE
45' PSE
20' PSE
20' PSE
20' PSE
20' PSE
30' PUBLICSEWER ESMT.
30' FVSE
30' FVSE
20' FVSE
20' FVSE
53' PUBLIC SEWER ESMT.(FOR FUTURE GRAVITYOUTFALL)
10' TYPE 'A'BUFFER
50' TYPE 'A'BUFFER
10' TYPE 'A'BUFFER
50' TYPE 'A'BUFFER
IMPACT 3 / MAP HREASON: ROADZONE 1 BUFFER IMPACT: 0.14 AC./ 6,293 SFZONE 2 BUFFER IMPACT: 0.10 AC./ 4,230 SF
IMPACT 5 / MAP IREASON: ROADZONE 1 BUFFER IMPACT: 0.11 AC./ 4,608 SFZONE 2 BUFFER IMPACT: 0.06 AC./ 2,776 SF
IMPACT 7 / MAP GREASON: POND BREACHZONE 1 BUFFER IMPACT: 0.03 AC./ 1,150 SFZONE 2 BUFFER IMPACT: 0.003 AC./ 127 SFOPEN WATER IMPACT :0.01 AC. / 277 SF
IMPACT 8 / MAP KREASON: ZONE 2ZONE 2 BUFFER IMPACT: 0.01 AC./ 607 SF
IMPACT 9 / MAP LREASON: ZONE 2ZONE 2 BUFFER IMPACT: 0.17 AC./ 7,415 SF
IMPACT 10 / MAP MREASON: ZONE 2ZONE 2 BUFFER IMPACT: 0.05 AC./ 2,386 SF
IMPACT 11 / MAP NREASON: ZONE 2ZONE 2 BUFFER IMPACT: 0.03 AC./ 1,181 SF
IMPACT 12 / MAP OREASON: ZONE 2ZONE 2 BUFFER IMPACT: 0.01 AC./ 410 SF
IMPACT 6 / MAP JREASON: SEWERZONE 1 BUFFER IMPACT: 0.03 AC./ 1,438 SFZONE 2 BUFFER IMPACT: 0.02 AC./ 1,013 SF
IMPACT 6 / MAP FREASON: SEWER USING OPEN CUTTEMPORARY STREAM IMPACT: 20 LF/ 155 SFTEMPORARY WETLAND IMPACT: 0.09 AC./ 4,137 SF
1.0
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET
IMPACT 1
IMPACT 6
IMPACT 5
IMPACT 4
IMPACT 3
IMPACT 2 IMPACT 7
NOTE: CONTRACTOR TO ENSURE GRADING AND SILT
FENCE IS 2' OFF WETLAND LINE
FM
FM
FM
FM
FM
FM
FM
FM
FIRE BARRIER
FIRE BARRIER
S
S
S
S
S
S
S
S
30" RCP
30" RC
P
3
0
"
C
M
P
3
0
"
C
M
P
30' ZONE 1 BUFFER
20' ZONE 2 BUFFER
EX. JURISDICTIONAL
SCM #1
6' STE
6' STE
BECKEL ROA
D
BECKE
L
R
O
A
D
CIP CONCRETE
HEADWALL
CIP CONCRETE
HEADWALL
46' PSE
20'
PSCMAME
20' PSE
20' PSE
IMPACT 1 / MAP A
REASON: ROAD
PERMANENT WETLAND IMPACT: 0.11 AC./ 4,978 SF
TEMPORARY WETLAND IMPACT: 0.02 AC./ 898 SF
1.1
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET SCALE 1"=50'
100'50'0
N
IMPACT LEGEND:
STREAM IMPACT AREA (PERMANENT)
STREAM IMPACT AREA (PERMANENT NO LOSS)
STREAM IMPACT AREA (TEMPORARY)
WETLAND IMPACT AREA (PERMANENT)
WETLAND IMPACT AREA (TEMPORARY)
ZONE 1 IMPACT AREA
ZONE 2 IMPACT AREA
IMPACT #1 / MAP A
1.1 A
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET
IMPACT 1 / MAP A PROFILE
SHEET 1.1
365
370
375
380
365
370
375
380
-0+200+00 0+50 0+70
365
370
375
380
365
370
375
380
-0+200+00 0+50 0+88
1.1 B
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET
IMPACT 1 / MAP A PROFILE SECTION
SHEET 1.1
1"=40' HORZ.1"=4' VERT.
HEADWALL PROFILE- INLET HEADWALL PROFILE- OUTLET
FM
FM FM
FM
FM
FM
FM
FM
SSSSSSSS
SS SS SS
SS SS SS
SS SS SS
SS SS SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSSSSSS
IMPACT 2 / MAP B
REASON: SEWER
TEMPORARY WETLAND IMPACT: 0.05 AC./ 2,143 SF
N/F FISH, VICTOR
PIN: 0687-43-0130
ACREAGE: 2.0 AC.
DB 16906 PG 2687
ZONING: RMD
LAND CLASS: RES < 10 AC.
EX. JURISDICTIONAL
WETLANDS
PERMANENT STREAM IMPACT (NO LOSS): 15 LF/ 87 SF
MH54
MH52MH60A
MH49
MH55
6' STE
SP
A
R
K
L
I
N
G
P
E
A
R
D
R
.
PSCMAME
25' TYPE 'B' PB
TCE
20' PSE
40' FVSE 20' PSE
30' PUBLIC
SEWER ESMT.
30' FVSE
30' FVSE
1.2
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET SCALE 1"=50'
100'50'0
N
IMPACT LEGEND:
STREAM IMPACT AREA (PERMANENT)
STREAM IMPACT AREA (PERMANENT NO LOSS)
STREAM IMPACT AREA (TEMPORARY)
WETLAND IMPACT AREA (PERMANENT)
WETLAND IMPACT AREA (TEMPORARY)
ZONE 1 IMPACT AREA
ZONE 2 IMPACT AREA
IMPACT #2 / MAP B IMPACT 2 SEWER CONSTRUCTION
SEWER TO BE CONSTRUCTED USING OPEN CUT/TRENCH.
EASEMENT AREA TO BE MAINTAINED AS HERBACEOUS
VEGETATION.
AREA TO BE IMMEDIATELY REVEGETATED WITH A WETLAND SEED
MIX.
1.2 A
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET
IMPACT 2 / MAP B
SHEET 1.2
1"=40' HORZ.1"=4' VERT.
SO4
FM
FM FM
FM
FM
FM
F
M
F
M
F
M
FM
FM
FM F
M
SS
SS
SS
SS
SS
SS
SS
SS
SS SSSSSSSSSSSSSS
SS
SS
SS
SS
SS
SS
SS
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
SSSS
SS
SSSS
EX. JURISDICTIONAL
WETLANDS
30' ZONE
1
20' ZONE 2
50' NRB
30' ZONE
1
20' ZONE 2
50' NRB
IMPACT 3 / MAP C
REASON: ROAD
PERMANENT WETLAND IMPACT: 0.13 AC./ 5,864 SF
TEMPORARY WETLAND IMPACT: 0.01 AC./ 213 SF
PERMANENT STREAM IMPACT: 82 LF/ 483 SF
PERMANENT STREAM IMPACT (NO LOSS): 15 LF/ 87 SF
TEMPORARY STREAM IMPACT: 4 LF/ 24 SF
20' ZONE 2 BUFFER
30' ZONE 1 BUFFER
MH41
MH42
MH43
MH44
MH48 RIP RAP TO BE KEYED INTO
EXISTING GRADE
SCM #7
R
E
D
C
R
I
M
S
O
N
D
R
.
RED C
R
I
M
S
O
N
D
R
.
RETAINING WALL
RETAINING WALL
PSCMAME
PSCMAME
CIP CONCRETE
HEADWALL
CIP CONCRETE
HEADWALL
45' PSE
45' PSE
30' FVSE
1.3
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET SCALE 1"=50'
100'50'0
N
IMPACT LEGEND:
STREAM IMPACT AREA (PERMANENT)
STREAM IMPACT AREA (PERMANENT NO LOSS)
STREAM IMPACT AREA (TEMPORARY)
WETLAND IMPACT AREA (PERMANENT)
WETLAND IMPACT AREA (TEMPORARY)
ZONE 1 IMPACT AREA
ZONE 2 IMPACT AREA
IMPACT #3 / MAP C ROAD ALIGNMENT JUSTIFICATION
ALTERNATE ALIGNMENTS WERE COMPLETED RESULTING IN ADDITIONAL IMPACTS TO STREAMS AND WETLANDS
THAN WHAT IS SHOWN. CONSTRAINTS WITH HORIZONTAL CURVE CRITERIA, SKEWED ANGLE BETWEEN
ENVIRONMENTAL AREAS AND NORTH PROPERTY LINE RESULT IN A SKEWED ALIGNMENT THROUGH WETLAND
AREAS AND A NON-PERPENDICULAR STREAM CROSSING.
1.3 A
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET
IMPACT 3 / MAP C PROFILE
SHEET 1.3
340
345
350
355
340
345
350
355
-0+200+00 0+34
340
345
350
355
340
345
350
355
-0+200+00 0+37
1.3 B
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET
IMPACT 3 / MAP C PROFILE SECTION
SHEET 1.3
1"=40' HORZ.1"=4' VERT.
HEADWALL PROFILE- INLET HEADWALL PROFILE- OUTLET
CG3
SO7
FIRE
B
A
R
R
I
E
R
FIRE
B
A
R
R
I
E
R
FIRE
B
A
R
R
I
E
R
FIRE
B
A
R
R
I
E
R
FIRE B
A
R
R
I
E
R
FIRE
B
A
R
R
I
E
R
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSSSSSS
SS
SS
SS
SS
SS
SS
SS
SS
SSSSSSSS
SSSSSSSS
S
S
S
S
S
S
S
S
IMPACT 4 / MAP D
REASON: ROAD
PERMANENT WETLAND IMPACT: 0.09 AC./ 4,089 SF
PERMANENT STREAM IMPACT: 58 LF / 314 SF
PERMANENT STREAM IMPACT (NO LOSS): 12 LF / 50 SF
TEMPORARY STREAM IMPACT: 5 LF / 34 SF
20' Z
O
N
E
2
MH15
MH16
MH35
MH34
MH36
6' STE
6' STE.
GO
L
D
B
A
R
T
L
E
T
T
D
R
.
RED BLUSH
W
A
Y RED BLUSH
W
A
Y
S
W
E
E
T
A
N
J
O
U
S
T
10'x60' TCE
25' TYPE 'B' PB
PSCMAME
RETAINING WALL
20' PSE
30' PSE
30' PSE
30'
PSCMAME
30' PUBLIC
SEWER ESMT.
VWSE
CIP CONCRETE
HEADWALL
ZONE 1 BUFFER IMPACT: 0.11 AC./ 4,608 SF
ZONE 2 BUFFER IMPACT: 0.06 AC./ 2,776 SF
1.4
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET SCALE 1"=50'
100'50'0
N
IMPACT LEGEND:
STREAM IMPACT AREA (PERMANENT)
STREAM IMPACT AREA (PERMANENT NO LOSS)
STREAM IMPACT AREA (TEMPORARY)
WETLAND IMPACT AREA (PERMANENT)
WETLAND IMPACT AREA (TEMPORARY)
ZONE 1 IMPACT AREA
ZONE 2 IMPACT AREA
IMPACT #4 / MAP D
1.4 A
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET
IMPACT 4 / MAP D PROFILE
SHEET 1.4
SO8
FIRE BA
R
R
I
E
R
FIRE
B
A
R
R
I
E
R
FIRE
B
A
R
R
I
E
R
FIRE
B
A
R
R
I
E
R
FIR
E
B
A
R
R
I
E
R
FIR
E
B
A
R
R
I
E
R
FIRE BARRIER
FIRE BARRIER
SSSSSSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
IMPACT 5 / MAP E
REASON: ROAD
PERMANENT STREAM IMPACT: 58 LF / 314 SF
PERMANENT STREAM IMPACT (NO LOSS): 12 LF / 50 SF
TEMPORARY STREAM IMPACT: 5 LF / 34 SF
50' NRB
MH34
MH33
MH32
SCM #5
6' STE.
RED BLUSH
W
A
Y
RED
B
L
U
S
H
W
A
Y
RETAINING WALL
RETAINING WALL
CIP CONCRETE
HEADWALL
CIP CONCRETE
HEADWALL
25' TYPE 'B' PB
30'
PSCMAME
34' PSE
34' PSE
1.5
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET SCALE 1"=50'
100'50'0
N
IMPACT LEGEND:
STREAM IMPACT AREA (PERMANENT)
STREAM IMPACT AREA (PERMANENT NO LOSS)
STREAM IMPACT AREA (TEMPORARY)
WETLAND IMPACT AREA (PERMANENT)
WETLAND IMPACT AREA (TEMPORARY)
ZONE 1 IMPACT AREA
ZONE 2 IMPACT AREA
IMPACT #5 / MAP E
1.5 A
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET
IMPACT 5 / MAP E PROFILE
SHEET 1.5
345
350
355
360
345
350
355
360
-0+200+00 0+31 345
350
355
345
350
355
-0+200+00 0+25
1.5 B
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET
IMPACT 5 / MAP E PROFILE SECTION
SHEET 1.5
1"=40' HORZ.1"=4' VERT.
HEADWALL PROFILE- INLET HEADWALL PROFILE- OUTLET
SO1
SO1
FIRE BA
R
R
I
E
R
FIRE BA
R
R
I
E
R
FIRE BARRIE
R
FIRE B
A
R
R
I
E
R
FIRE BARRIE
R
FIRE BARRIER
FIRE B
A
R
R
I
E
R
FIRE BARRIER
SSSSSSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSSSSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
EX. JURISDICTIONAL
WETLANDS
30' ZONE
20' ZONE 2
MH28
MH29
SCM #4
6' STE
PSCMAME
RETAINING WALL
PSCMAME
30'
PSCMAME
30' FVSE
20' FVSE
IMPACT 6 / MAP F
REASON: SEWER USING OPEN CUT
TEMPORARY STREAM IMPACT: 20 LF/ 155 SF
TEMPORARY WETLAND IMPACT: 0.09 AC./ 4,137 SF
1.6
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET SCALE 1"=50'
100'50'0
N
IMPACT LEGEND:
STREAM IMPACT AREA (PERMANENT)
STREAM IMPACT AREA (PERMANENT NO LOSS)
STREAM IMPACT AREA (TEMPORARY)
WETLAND IMPACT AREA (PERMANENT)
WETLAND IMPACT AREA (TEMPORARY)
ZONE 1 IMPACT AREA
ZONE 2 IMPACT AREA
IMPACT #6 / MAP F IMPACT 6 SEWER CONSTRUCTION
SEWER TO BE CONSTRUCTED USING OPEN CUT/TRENCH.
EASEMENT AREA TO BE MAINTAINED AS HERBACEOUS
VEGETATION.
AREA TO BE IMMEDIATELY REVEGETATED WITH A WETLAND SEED
MIX.
1.6 A
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET
IMPACT 6 / MAP F
SHEET 1.6 1"=40' HORZ.1"=4' VERT.
CG4
SSSSSSSS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
30' ZONE 1
20' ZONE 2
EX. POND
30' ZONE 1
SSSSSSSS
25' TYPE 'B' PB
20' FVSE
53' PUBLIC SEWER ESMT.
(FOR FUTURE GRAVITY
OUTFALL)
10' TYPE 'A'
BUFFER
50' TYPE 'A'
BUFFER
10' TYPE 'A'
BUFFER
50' TYPE 'A'
BUFFER
IMPACT 7 / MAP G
REASON: POND BREACH
ZONE 1 BUFFER IMPACT: 0.03 AC./ 1,150 SF
ZONE 2 BUFFER IMPACT: 0.003 AC./ 127 SF
OPEN WATER IMPACT :0.01 AC. / 277 SF
1.7
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET SCALE 1"=50'
100'50'0
N
IMPACT LEGEND:
STREAM IMPACT AREA (PERMANENT)
STREAM IMPACT AREA (PERMANENT NO LOSS)
STREAM IMPACT AREA (TEMPORARY)
WETLAND IMPACT AREA (PERMANENT)
WETLAND IMPACT AREA (TEMPORARY)
ZONE 1 IMPACT AREA
ZONE 2 IMPACT AREA
IMPACT #7 / MAP G
SO4
FM
FM FM
FM
FM
FM
F
M
F
M
F
M
FM
FM
FM F
M
SS
SS
SS
SS
SS
SS
SS
SS
SS SSSSSSSSSSSSSS
SS
SS
SS
SS
SS
SS
SS
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
SSSS
SS
SSSS
EX. JURISDICTIONAL
WETLANDS
30' ZONE
1
20' ZONE 2
50' NRB
30' ZONE
1
20' ZONE 2
50' NRB
20' ZONE 2 BUFFER
30' ZONE 1 BUFFER
MH41
MH42
MH43
MH44
MH48
SCM #7
R
E
D
C
R
I
M
S
O
N
D
R
.
RED C
R
I
M
S
O
N
D
R
.
RETAINING WALL
RETAINING WALL
PSCMAME
PSCMAME
CIP CONCRETE
HEADWALL
CIP CONCRETE
HEADWALL
45' PSE
45' PSE
30' FVSE
IMPACT 3 / MAP H
REASON: ROAD
ZONE 1 BUFFER IMPACT: 0.14 AC./ 6,293 SF
ZONE 2 BUFFER IMPACT: 0.10 AC./ 4,230 SF
1.8
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET SCALE 1"=50'
100'50'0
N
IMPACT LEGEND:
STREAM IMPACT AREA (PERMANENT)
STREAM IMPACT AREA (PERMANENT NO LOSS)
STREAM IMPACT AREA (TEMPORARY)
WETLAND IMPACT AREA (PERMANENT)
WETLAND IMPACT AREA (TEMPORARY)
ZONE 1 IMPACT AREA
ZONE 2 IMPACT AREA
IMPACT #3 / MAP H
FIRE BA
R
R
I
E
R
FIRE
B
A
R
R
I
E
R
FIRE
B
A
R
R
I
E
R
FIRE
B
A
R
R
I
E
R
FIR
E
B
A
R
R
I
E
R
FIR
E
B
A
R
R
I
E
R
FIRE BARRIER
FIRE BARRIER
SSSSSSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
30' ZON
E
1
20' Z
O
N
E
2
50' NRB
MH34
MH33
MH32
SCM #5
6' STE.
RED BLUSH
W
A
Y
RED
B
L
U
S
H
W
A
Y
RETAINING WALL
RETAINING WALL
CIP CONCRETE
HEADWALL
CIP CONCRETE
HEADWALL
25' TYPE 'B' PB
30'
PSCMAME
34' PSE
34' PSE
IMPACT 5 / MAP I
REASON: ROAD
ZONE 1 BUFFER IMPACT: 0.11 AC./ 4,608 SF
ZONE 2 BUFFER IMPACT: 0.06 AC./ 2,776 SF
1.9
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET SCALE 1"=50'
100'50'0
N
IMPACT LEGEND:
STREAM IMPACT AREA (PERMANENT)
STREAM IMPACT AREA (PERMANENT NO LOSS)
STREAM IMPACT AREA (TEMPORARY)
WETLAND IMPACT AREA (PERMANENT)
WETLAND IMPACT AREA (TEMPORARY)
ZONE 1 IMPACT AREA
ZONE 2 IMPACT AREA
IMPACT #5 / MAP I
SO1
SO1
FIRE BA
R
R
I
E
R
FIRE BA
R
R
I
E
R
FIRE BARRIE
R
FIRE B
A
R
R
I
E
R
FIRE BARRIE
R
FIRE BARRIER
FIRE B
A
R
R
I
E
R
FIRE BARRIER
SSSSSSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSSSSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
20' ZONE 2
30' ZONE 1
EX. JURISDICTIONAL
WETLANDS
30' ZONE
20' ZONE 2
MH28
MH29
SCM #4
6' STE
PSCMAME
RETAINING WALL
PSCMAME
30'
PSCMAME
30' FVSE
20' FVSE
IMPACT 6 / MAP J
REASON: SEWER
ZONE 1 BUFFER IMPACT: 0.03 AC./ 1,438 SF
ZONE 2 BUFFER IMPACT: 0.02 AC./ 1,013 SF
1.10
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET SCALE 1"=50'
100'50'0
N
IMPACT LEGEND:
STREAM IMPACT AREA (PERMANENT)
STREAM IMPACT AREA (PERMANENT NO LOSS)
STREAM IMPACT AREA (TEMPORARY)
WETLAND IMPACT AREA (PERMANENT)
WETLAND IMPACT AREA (TEMPORARY)
ZONE 1 IMPACT AREA
ZONE 2 IMPACT AREA
IMPACT #6 / MAP J
20' ZONE 2
30' ZONE 1
IMPACT 8 / MAP K
REASON: ZONE 2
ZONE 2 BUFFER IMPACT: 0.01 AC./ 607 SF
FIRE BARRIER
FIRE BARRIER
FIRE BARRIER
FIRE BARRIER
FIRE BARRIER
FIRE BARRIER
FIRE BARRIER
FIRE BARRIER
30' ZONE 1
20' ZONE 2
50' NRB
RETAINING WALL
P
A
C
K
H
A
M
D
R
.
IMPACT 9 / MAP L
REASON: ZONE 2
ZONE 2 BUFFER IMPACT: 0.17 AC./ 7,415 SF
1.11
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET SCALE 1"=50'
100'50'0
N
IMPACT LEGEND:
STREAM IMPACT AREA (PERMANENT)
STREAM IMPACT AREA (PERMANENT NO LOSS)
STREAM IMPACT AREA (TEMPORARY)
WETLAND IMPACT AREA (PERMANENT)
WETLAND IMPACT AREA (TEMPORARY)
ZONE 1 IMPACT AREA
ZONE 2 IMPACT AREA
IMPACT #8 / MAP K
IMPACT #9 / MAP L
ZONE 2 BUFFER IMPACT TO GRADE IN SCM FOR
POSITIVE DRAINAGE
ZONE 2 BUFFER IMPACT TO GRADE IN SCM FOR
POSITIVE DRAINAGE
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
EX. POND 30' ZONE 1
20' ZONE 2
50' NRB
20'
PSCMAME
IMPACT 10 / MAP M
REASON: ZONE 2
ZONE 2 BUFFER IMPACT: 0.05 AC./ 2,386 SF
EX. JURISDICTIONAL
WETLANDS
30' ZONE
1
20' ZONE 2
50' NRB
20' ZONE 2 BUFFER
30' ZONE 1 BUFFER
RETAINING WALL
RETAINING WALL
PSCMAME
CIP CONCRETE
HEADWALL
IMPACT 11 / MAP N
REASON: ZONE 2
ZONE 2 BUFFER IMPACT: 0.03 AC./ 1,181 SF
50' NRB
20' ZONE 2
30' ZONE 1
SCM #6
RETAINING WALL
IMPACT 12 / MAP O
REASON: ZONE 2
ZONE 2 BUFFER IMPACT: 0.01 AC./ 410 SF
1.12
Project #:
Project Engineer:
p:
\
2
0
1
9
p
r
o
j
e
c
t
s
\
1
9
0
4
1
9
h
i
l
l
t
o
p
(
t
e
r
r
a
m
o
r
)
\
E
N
G
\
D
W
G
\
E
x
h
i
b
i
t
s
\
i
m
p
a
c
t
m
a
p
s
\
S
h
e
e
t
s
\
P
1
9
0
4
1
9
_
I
m
p
a
c
t
M
a
p
.
d
w
g
Date:12.08.21
BE
X
F
O
R
D
S
U
B
D
I
V
I
S
I
O
N
P190419
64
9
0
H
I
L
L
T
O
P
R
O
A
D
FU
Q
U
A
Y
-
V
A
R
I
N
A
,
N
C
SSL
WA
K
E
C
O
U
N
T
Y
Bat
e
m
a
n
C
i
v
i
l
S
u
r
v
e
y
C
o
m
p
a
n
y
En
g
i
n
e
e
r
s
S
u
r
v
e
y
o
r
s
P
l
a
n
n
e
r
s
25
2
4
R
e
l
i
a
n
c
e
A
v
e
n
u
e
,
A
p
e
x
,
N
o
r
t
h
C
a
r
o
l
i
n
a
2
7
5
3
9
Ph
o
n
e
:
9
1
9
.
5
7
7
.
1
0
8
0
F
a
x
:
9
1
9
.
5
7
7
.
1
0
8
1
NC
B
E
L
S
F
I
R
M
N
o
.
C
-
2
3
7
8
SHEET SCALE 1"=50'
100'50'0
N
IMPACT LEGEND:
STREAM IMPACT AREA (PERMANENT)
STREAM IMPACT AREA (PERMANENT NO LOSS)
STREAM IMPACT AREA (TEMPORARY)
WETLAND IMPACT AREA (PERMANENT)
WETLAND IMPACT AREA (TEMPORARY)
ZONE 1 IMPACT AREA
ZONE 2 IMPACT AREA
IMPACT #10 / MAP M IMPACT #11 / MAP N IMPACT #12 / MAP OZONE 2 BUFFER IMPACT FROM FILL SLOPE GRADING
FROM ROADWAY
ZONE 2 BUFFER IMPACT TO GRADE IN SCM FOR
POSITIVE DRAINAGE
ZONE 2 BUFFER IMPACT TO GRADE IN SCM
FOR POSITIVE DRAINAGE