Loading...
HomeMy WebLinkAboutWQ0043865_Application (FTSE)_20221027'1C DAMS COVER LETTER > NCDEQ October 13, 2022 NCDEQ Mooresville Regional Office Water Quality Section 610 E. Center Avenue, Suite 301 Mooresville, North Carolina 28115 Re: Fast -Track Application (FTA 06-21) For Sewer Prose Rhyne Road Charlotte, North Carolina ALL-21003 Please find enclosed with this letter the following attachments: 1. Application Form (FTA 06-21) — one original (hand delivered) 2. Application Fee (hand delivered) 3. Flow Tracking/Acceptance for Sewer Extension Permit Form (FTSE 04-16) 4. USGS Topographic Map 5. Aerial Location Map 6. Capacity Assurance Review Letter RECEIVED/NCDEQ/DWR OCT 2 4 2022 WQROS MOORESVILLE REGIONAL OFFICE The proposed project is a 330-unit apartment community in Charlotte, NC. Charlotte will be accepting the sewer flows from this project. The proposed private sewer collection system will have an 8" gravity main with 6" or 4" service lines extending to each building respectively. The proposed private sewer collection system will be built in one phase. Sincerely, MCADAMS Jonathan Woodard, PE Project Manager JBW/ks creating experiences through experience 3430 Toringdon Way, Suite 110, Charlotte, NC 28277 / 704. 527. 0800 Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 06-21 & SUPPORTING DOCUMENTATION Application Number: L& 6 (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: E ECEIVED/NCDEQ/DWR OCT 2 4 2022 WQROS 1. Applicant's name: US Alliance Rhvne Venture, LLC (company, municipality, I-IOA, utility, etc.) tYlOORESVILLE REGIONAL OFFICE 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ Municipal ❑ Other 3. Signature authority's name: Donald Santos per 15A NCAC 02T .0106(b) Title: 4. Applicant's mailing address: 200 Providence Road. Suite 250 City: Charlotte State: North Carolina Zip: 28207- 5. Applicant's contact information: Phone number: (704) 941-0972 Email Address: dsantos u,allresco.cotn II. PROJECT INFORMATION: 1. Project name: Prose Rhyne Road 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00_ and issued date: For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQ00_ 3. County where project is located: Mecklenburg 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.289047° Longitude: -80.968763° 5. Parcel ID (if applicable): 055481 10 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Jonathan Woodard. PE Firm: McAdams Mailing address: 3430 Toringdon Way. Suite 110 City: Charlotte State: North Carolina Zip: 28277- License Number: 049168 Phone number: (704) 527-0800 Email Address: jwoodard a mcadamsco.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek Permit Number: NC0024970, NC0024945, NC0024937 Owner Name: Charlotte Water V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQ UNKNOWN 2. Downstream (Receiving) Sewer Information: inch ❑ Gravity ❑ Force Main 3. System Wide Collection System Permit Number(s) (if applicable): WQCS___ Owner Name(s): FORM: FTA 06-21 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? El Yes No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑ No ►/ N/A 3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement (FORM: HOA) and supplementary documentation as required by I5A NCAC 02T.0115(c) been attached? ❑ Yes ❑ No ® N/A 4. Origin of wastewater: (check all that apply): ❑ Residential (Individually Owned) ® Residential (Leased) ❑ School / preschool / day care ❑ Food and drink facilities ❑ Businesses / offices / factories ❑ Retail (stores, centers, malls) ❑ Retail with food preparation/service ❑ Medical / dental / veterinary facilities ❑ Church ❑ Nursing Home ❑ Car Wash ❑ Hotel and/or Motels ❑ Swimming Pool/Clubhouse ❑ Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) 5. Nature of wastewater : 100 % Domestic % Commercial % Industrial (See 15A NCAC 02T .0103(20)) If Industrial, is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Has a flow reduction been approved under 15A NCAC 02T .0114(f)? ® Yes E No > If yes, provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(0) Daily Design Flow a,b No. of Units Flow Apartments 135 gal/unit 330 44,550 GPD Amenity 10 gal/person 170 1,700 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 46,250 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 46,250 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for pei,iiitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ❑ Other (Explain): FORM: FTA 06-21 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8" 1347 PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3. Total number of pumps at the pump station: 3. Design flow of the pump station: millions gallons per day (firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s) per pump(s): gallons per minute (GPM) at 5. Summarize the force main to be permitted (for this Pump Station): feet total dynamic head (TDH) Size (inches) Length (feet) Material If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per MDCPSFM Section 2.01C.1.b. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify) 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or ❑ Standby pump ➢ Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B): ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: ➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 06-21 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305(t) & (g)? 15A NCAC 02T.0305(f) contains minimum senarations that shall be provided for sewer systems• Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches 'Water mains (vertical - water over sewer preferred, including in benched trenches) 18 inches 'Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ if noncompliance with 02T.0305(fl or (g), see Section X.1 of this application *15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage 2. Does this project comply with the minimum separation requirements for water mains? ® Yes ❑ No ❑ N/A ➢ If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ® Yes ❑ No ❑ N/A ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft separation requirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ❑ Yes Basin name: ® No If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ❑ Yes ® No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 06-21 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? Yes El No If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued concurrently with the approval of the permit, and projects requiring a variance approval may be subject to longer review times. For projects requiring two or more variances or where the variance is determined by the Division to be a significant portion of the project, the full technical review is required. 2. Professional Engineer's Certification: 1, 3010 A 14,-/DD141z1D , attest that this application for PRoSE ROYADE RD (Professional Engineer's name from Application Item 111.1.) (Project Name from Application Item 1I.1) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NC` c Af tQ7gili)// ,, bf s •S/0��y, ;: +%. SEAL r ►916 = ti '' NGINee••'0/41- i� B- .\� North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): I, 0n ald 5 r.rr—FoS , attest that this application for Pr -) e (Signature Authority Name from Application Item 1.3.) (Project Name from Application Item II.1) attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: 0 QS / 7�2 FORM: FTA 06-21 Page 5 of 5 CHARLOTTE January 10, 2022 Mr. Jonathan Woodard McAdams 3460 Toringdon Way Suite 110 Charlotte, NC 28277 SUBJECT: WATER AND SEWER FLOW ACCEPTANCE PROSE RHYNE ROAD 9741 MT. HOLLY ROAD, CHARLOTTE, NC 28214 CLTWATER TRACKING# 20218719 After analysis of the sanitary sewer associated with the proposed design of project, 20218719, PROSE RHYNE ROAD, it was determined that there is sufficient capacity to accommodate the proposed sewer flow of 47,060 gallons per day (336 units x 135 gpd/unit; 170 persons x 10 gpd/person) at the connection point(s) indicated on the submitted utility plan for transmission to the McAlpine Creek Wastewater Treatment Plant; NPDES permit number NC0024970, for treatment. This acceptance of flow is based upon the existing capacity of the designated publicly owned treatments works. Please see attached NCDEQ-FTSE form. Charlotte Water (CLTWater) agrees to furnish water to the subject project. The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water Supply Management Plan, PWS ID # 0160010 on file with the Public Water Supply Section of NCDEQ. However, CLTWater cannot guarantee a constant pressure or quality of flow. The applicant should understand that due to the involvement of other agencies and continuing growth of the water and sewer system, the ability to provide service for future projects cannot be guaranteed nor reserved. Connection to the CLTWater and sewer system is accepted on a first come, first served basis. The applicant should understand that this letter is not authorization to construct or extend private water or sewer systems, as the appropriate local or State permits are required prior to construction. If the appropriate authorization to construct permits are not obtained and construction has not started within two (2) years of issuance of this flow acceptance, and payment for any service connections have not been received within two (2) years of issuance of this flow acceptance letter, this flow acceptance approval shall be rescinded and a new flow acceptance request must be made. If you have any questions, please do not hesitate to contact me at (704) 432-5801. Sincerely, Gwi,Ll e-r-wto- AKaate' Guillermo Anzola / Engineering Assistant CHARLOTTE WATER / charlottewater.org Charlotte Water 5100 Brookshire Blvd, Charlotte, NC 28216 charlottewater.org P! Operated by the City of Charlotte State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: McAdams Project Name for which flow is being requested: Prose Rhyne Road (Residential) More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek b. WWTP Facility Permit #: NC0024970, NC0024945, NC0024937 All flows are in MGD c. WWTP facility's permitted flow 99.00 d. Estimated obligated flow not yet tributary to the WWTP 12.403 e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of peilriitted flow used 71.5 0.04706 83.95 84.8% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Station (Name or Number) Long Creek Pump Station Permit No. Firm Capacity, * MGD (A) Design Average Daily Flow** (Firm / pfl, MGD 8.5 3.4 Paw Creek 10.7 4.28 (B) (C) Obligated, Approx. Not Yet Current Tributary Avg. Daily Daily Flow, Flow, MGD MGD 4.784 0.578 6.403 0.76 (D)=(B+C) (E)=(A-D) Total Current Flow Plus Obligated Flow 5.362 7.163 Available Capacity*** -1.962 -2.883 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Unknown Downstream Permit Number: Unknown Page 1 of 6 FTSE 10-18 III. Certification Statement: Keri Cantrell certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. 1/10/2022 Signing Official Signature Date Chief Engineer Title of Signing Official Page 2 of 6 FTSE 10-18 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for 10.6 % and 0.76 MGD of the Available Capacity (E) in Pump Station Long Creek and Paw Creek ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.76 MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely Stowe Regional Water Resource Recovery Facility is in design or under construction with planned completion in 2025 ; and/or Paw Creek FM Replacement - 2022 d. The following applies: Paw Creek Pump Station Improvements - 2022 Charlotte Waters Capital Improvement Plan has allocated funds for improvements to the Paw Creek Pump Station Improvements and a new Stowe Regional Water Resource Recovery Facility ("Stowe Regional"). The design plan is for Stowe Regional to use the Long Creek Pump Station (LCPS) to house the second stage pumps of its influent pump station. In the short term, LCPS wit also continue to house pumps which export flow to Paw Creek PS ("Paw Creek export pumps'). Currently LCPS has 8 MGD of export capacity, which will be increased to 12 MGD (firm) by the end of 2023. Stowe Regional is under design and expected to come online in 2025. Before Stowe Regional is brought online, a new headworks and Influent Pumping Station building will be constructed adjacent to the LCPS, which will house the first stage influent pumps for Stowe and be the Paw Creek export pumps. Currently, Long Creek and Paw Creek operate as a combined system with the Long Creek pump station able to transfer flows to flow equalization tanks during peak flow events and then meter out flow to Paw Creek as conditions allow. Paw Creek Pump Station was awarded a permit on 8/27/2020 to increase firm pumping capacity to 20 MGD. Construction on this project has begun, and this project is anticipated to be substantially complete mid -April 2022. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. 1/10/2022 Signing Official Signature Date Page 3 of 6 FTSE 10-18 A 500 1,000 1 inch= 1,000 feet 2,000 Feet PROSE RHYNE ROAD USGS TOPO MAP PROJECT #: ALL-21003 CHARLOTTE, NORTH CAROLINA gij %ARAM j i N A 0 125 250 500 Feet l inch = 250 feet PROSE RHYNE ROAD SITE AERIAL MAP PROJECT #: ALL-21003 CHARLOTTE, NORTH CAROLINA im ' DA MS CERTIFICATE OF US ALLIANCE RHYNE VENTURE, LLC The undersigned hereby certifies on behalf of US Alliance Rhyne Venture, LLC (the "Company") as follows: The Limited Liability Company Agreement of the Company provides that the Company is managed by US Alliance Rhyne MM, LLC ("Managing Member"), which is the managing member of the Company. The Limited Liability Company Agreement of Managing Member provides that Managing Member is managed by Prose Rhyne Alliance, LLC, which is its managing member ("Alliance"), and which is authorized to execute documents on behalf of Managing Member, as the managing member of the Company. The Limited Liability Company Agreement of Alliance provides that Alliance is managed by its members, each of whom is authorized to execute documents on behalf of Alliance. Donald Santos is a member of Alliance as of the date hereof and is duly authorized to execute documents on behalf of Alliance, as the managing member of Managing Member, as the managing member of the Company. IN WITNESS WHEREOF, I have hereunto set my hand as of the 17th day of October, 2022. US ALLIANCE RHYNE VENTURE LLC, a Delaware limited liability company By: US Alliance Rhyne MM, LLC, a Delaware limited liability company, its managing member By: Prose Rhyne Alliance, LLC, a Delaware limited liability company, its managing member By: Patrick W. Dukes Member North Carolina Secretary of State Search Results Page 1 of 1 • File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online • Add Entity to My Email Notification List • View Filings • Print a Pre -Populated Annual Report form • Print an Amended a Annual Report form Limited Liability Company Legal Name US Alliance Rhyne Venture, LLC Information Sosld: 2252010 Status: Current -Active Date Formed: 8/17/2021 Citizenship: Foreign State of Incorporation: DE Annual Report Due Date: April 15th CurrentAnnual Report Status: Registered Agent: CT Corporation System Addresses Reg Office Reg Mailing Mailing 160 Mine Lake Ct Ste 200 160 Mine Lake Ct Ste 200 7135 E Camelback Rd Ste 300 Raleigh, NC 27615 Raleigh, NC 27615 Scottsdale, AZ 85251 Principal Office 7135 E Camelback Rd Ste 300 Scottsdale, AZ 85251 Company Officials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Manager Bob Weston 7135 E. Camelback Rd., Ste. 300 Scottsdale AZ 85251 https://www.sosnc.gov/online_services/search/Business_Registration_Results 10/25/2022