Loading...
HomeMy WebLinkAbout20211818 Ver 3_More Information Received_20220824 (2)2-'6" X 2'-6" ONSHORE CONC. FOOTING; TYP. 1 0 ' - 0 " 20'-0" 6'-0" 24'-0" 62 ' - 6 " 3 6 ' - 0 " 28 5 ' - 8 " 4 2 ' - 6 " 6'-0" 1 0 ' - 0 " 28 ' - 0 " 5 6 ' - 0 " 56 ' - 0 " 373.75 372.75 371.75 372.25 373.25 42 ' - 0 " 15'-4 " 70 ' - 0 " 6' - 0 " XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX 16 ' - 0 " 3 0 5 ' - 6 " 2 3 5 ' - 1 0 " 335'-8" 93'-4" 90. 0 0 ° 90. 0 0 ° 6'-0" OVERALL SITE PLAN WITH POND STRUCTURES 1"=60'1 POND EDGE ZONE 1 ZONE 2 0'15'30'60' PAVILLION OVER WATER; SEE ARCHITECTURAL DRAWINGS IMPACT AREA #4 6' WIDE WOOD BRIDGE IMPACT AREA #1 8' WIDE WOOD DECK BOARDWALK IMPACT AREA #2 6' WIDE WOOD DECK 18" DIA. ONSHORE SONOTUBE FOOTINGS @ 14' O.C.; TYP. 6' WOOD STEPS & BOARDWALK CONNECTOR 5' WIDE GRAVEL TRAIL 2-'6" X 2'-6" DEWATERED CONC. FOOTING; TYP. 2-'6" X 2'-6" ONSHORE CONC. FOOTING; TYP. 5' WIDE GRAVEL TRAIL 5' WIDE GRAVEL TRAIL 6' WIDE BOARWALK CONNECTOR IMPACT AREA#3 KAYAK LAUNCH 7'-0" X 3'-0" ONSHORE CONC. FOOTING; TYP. 6X6 POSTS TO BE OUTSIDE STREAMFLOW 5' WIDE GRAVEL TRAIL 5' WIDE GRAVEL TRAIL WETLANDS; TYP. 18" DIA. DEWATERED SONOTUBE FOOTINGS @ 14' O.C.; TYP. 2-'6" X 2'-6" DEWATERED CONC. FOOTING; TYP. CONCRETE BUTTRESS; REFER TO STRUCTURAL DRAWINGS; TYP. 18" DIA. WETLAND SONOTUBE FOOTINGS @ 14' O.C.; TYP. 1 L501 3 L501 2 L501 EXISTING WOOD FENCE STREAM; TYP. POND EDGE; TYP. EXISTING DAM (REPAIRED) EXISTING NATURAL DUFF TRAIL; NO DISTURBANCE PROPERTY LINE; TYP. CHECKED BY: DRAWN BY: OWNER Structural Engineer PME ENGINEER PROJECT NO.: REISSUE LIGHTING DESIGNER LANDSCAPE ARCHITECT SHEET ISSUE LOUIS CHERRY, FAIA 222 N. BLOODWORTH STREET, RALEIGH, NORTH CAROLINA 27601 919.971.2299 LOUIS@LOUISCHERRY.COM PHASE: LOUIS CHERRY ARCHITECTURE Registered Architectural Corporation North Carolina RALEI GH ,N .C . L O U I S W.CHERR Y N ORTH CA RO L I N A RE G I S T E R E D ARCHIT E CT 485 2 SURFACE 678 215 MORRIS ST SUITE 1110 DURHAM, NC 27701 HB WH 03.17.2021 SPR - 1 404/401 AND BUFFER IMPACT DRAWINGS WETLAND FOOTING ONSHORE FOOTING TEMPORARY IMPACT DEWATERED FOOTING WETLAND STREAM POND LEGEND BUFFER - ZONE 1 BUFFER - ZONE 2 PERMANENT IMPACT TEMPORARY IMPACT GRAVEL PATH WETLAND FOOTING ONSHORE FOOTING TEMPORARY IMPACT DEWATERED FOOTING WETLAND STREAM POND LEGEND BUFFER - ZONE 1 BUFFER - ZONE 2 PERMANENT IMPACT TEMPORARY IMPACT GRAVEL PATH 2-'6" X 2'-6" ONSHORE CONC. FOOTING; TYP. 1 0 ' - 0 " 20'-0" 6'-0" 24'-0" 62 ' - 6 " 3 6 ' - 0 " 28 5 ' - 8 " 4 2 ' - 6 " 6'-0" 1 0 ' - 0 " 28 ' - 0 " 5 6 ' - 0 " 56 ' - 0 " 373.75 372.75 371.75 372.25 373.25 42 ' - 0 " 15'-4 " 70 ' - 0 " 6' - 0 " XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX 16 ' - 0 " 3 0 5 ' - 6 " 2 3 5 ' - 1 0 " 335'-8" 93'-4" 90. 0 0 ° 90. 0 0 ° 6'-0" 351 351 351 352 352 352 353 353 353 35 3 353 354 354 354 354 3 5 4 3 5 4 355 35535 5 355 355 355 355 355 35 5 355 35 5 356 3 5 6 356 3 5 6 3 5 6 356 357 357 357 357 357 358 358 358 35 8 358 358 359 359 359 359 359 359 360 360 360 360 360 360 3 6 0 360 360 360 360 361 361 361 361 361 362 362 362 36 2 362 363 363 363 36 3 363 364 364 364 364 365 365 36 5 365 36 5 365 3 6 5 365 366 366 3 6 6 366 366 36 6 367 367 3 6 7 367 3 6 8 368 3 6 8 368 368 3 6 8 3 6 9 369 3 6 9 369 369 369 3 6 9 36 9 3 6 9 369 3 6 9 369 369 369 369 3 6 9 369 369 369 369 369 3 6 9 3 6 9 369 369 369 36 9 369 36 9 3 6 9 36 9 370 370 370 370 370 370 370 370 370 370 37 0 3 7 0 37 0 370 370 370 370 370 3 7 0 370 37 0 37 0 3 7 0 37 0 370 3 7 0 3 7 0 370 370 370 37 0 3 7 0 370 370 370 370 370 3 7 0 3 7 0 3 7 0 3 7 0 370 370 370 3 7 0 3703 7 0 3 7 0 371 371 371 371 371 3 7 1 3 7 1 37 1 37 1 371 371 37 1 371 3 7 1 3 7 1 371 3 7 1 371 371 371 3 7 1 3 7 1 371 371 371 371 372 372 372 372 372 37 2 372 3 7 2 3 7 2 372 372 372 372 3 7 2 372 372 372 372 3 7 2 3 7 2 372 372 372 373 373 373 3 7 3 373 373 373 373 373 37 3 37 3 3 7 3 373 37 3 373 373 3 7 3 3 7 3 374 3 7 4 374 3 7 4 374 374 374 374 37 4 37 4 3 7 4 37 4 37 4 374 374 3 7 4 375 375 375 3 7 5 375 375 37 5 3 7 5 375 375 375 375 375 375 375 375 375 375 375 375 375 375 3 7 5 37 5 375 375 375 375 37 5 375 375 375 375 376 37 6 376 3 7 6 376 376 376 376 376 376 376 376 3 7 6 376 376 3 7 6 376 376 3 7 7 377 377 3 7 7 377 377 377 377 377 377 3 7 7 37 7 377 3 7 7 37 7 377 377 3 7 7 3 7 7 3 7 8 378 378 378 3 7 8 378 378 378 378 3 7 8 378 3 7 8 3 7 8 378 378 378 37 8 379 379 3 7 9 379 379 379 379 379 3 7 9 379 379 379 379 37 9 379 379 3 8 0 380 380 380 380 3 8 0 3 8 0 380 380 380 380 380 380 380 380 3 8 0 3 8 0 380 380 3 8 0 380 380 380 380 380 380 381 381 3 8 1 381 381 381 381 3 8 1 381 38 1 381 381 38 1 382 382 3 8 2 382 382 382 3 8 2 382 38 2 382 382 38 2 383 383 3 8 3 383 3833 8 3 383 383 383 383 38 3 384 384 3 8 4 384 384 38 4 384 38 4 3 8 4 384 3 8 5 385 38 5 385 385 3 8 5 38 5 38 5 385 385 38 5 385 3 8 5 38 5 385 38 5 385 385 386 386 386 38 6 386 386 386 38 7 387 387 3 8 7 38 7 387 3 8 7 387 38 8 388 3 8 8 388 38 8 3 8 8 388 3 8 9 389 389 389 389 389 3 9 0 390 390 3 9 0 390 390 39 0 3 9 1 391 391 39 2 392 39 2 39 3 393 3 9 3 39 4 394 394 39 5 395 395 395 396 396 397 397 398 399 400 400 OVERALL SITE PLAN WITH POND STRUCTURES 1"=60'2 POND EDGE ZONE 1 ZONE 2 0'15'30'60' PAVILLION OVER WATER; SEE ARCHITECTURAL DRAWINGS IMPACT AREA #4 6' WIDE WOOD BRIDGE IMPACT AREA #1 8' WIDE WOOD DECK BOARDWALK IMPACT AREA #2 6' WIDE WOOD DECK 18" DIA. ONSHORE SONOTUBE FOOTINGS @ 14' O.C.; TYP. 6' WOOD STEPS & BOARDWALK CONNECTOR 5' WIDE GRAVEL TRAIL 2-'6" X 2'-6" DEWATERED CONC. FOOTING; TYP. 2-'6" X 2'-6" ONSHORE CONC. FOOTING; TYP. 5' WIDE GRAVEL TRAIL 5' WIDE GRAVEL TRAIL 6' WIDE BOARWALK CONNECTOR IMPACT AREA#3 KAYAK LAUNCH 7'-0" X 3'-0" ONSHORE CONC. FOOTING; TYP. 6X6 POSTS TO BE OUTSIDE STREAMFLOW 5' WIDE GRAVEL TRAIL 5' WIDE GRAVEL TRAIL WETLANDS; TYP. 18" DIA. DEWATERED SONOTUBE FOOTINGS @ 14' O.C.; TYP. 2-'6" X 2'-6" DEWATERED CONC. FOOTING; TYP. CONCRETE BUTTRESS; REFER TO STRUCTURAL DRAWINGS; TYP. 18" DIA. WETLAND SONOTUBE FOOTINGS @ 14' O.C.; TYP. 1 L501 3 L501 2 L501 EXISTING WOOD FENCE STREAM; TYP. POND EDGE; TYP. EXISTING DAM (REPAIRED) EXISTING NATURAL DUFF TRAIL; NO DISTURBANCE PROPERTY LINE; TYP. CHECKED BY: DRAWN BY: OWNER Structural Engineer PME ENGINEER PROJECT NO.: REISSUE LIGHTING DESIGNER LANDSCAPE ARCHITECT SHEET ISSUE LOUIS CHERRY, FAIA 222 N. BLOODWORTH STREET, RALEIGH, NORTH CAROLINA 27601 919.971.2299 LOUIS@LOUISCHERRY.COM PHASE: LOUIS CHERRY ARCHITECTURE Registered Architectural Corporation North Carolina RALEI GH ,N .C . L O U I S W.CHERR Y N ORTH CA RO L I N A RE G I S T E R E D ARCHIT E CT 485 2 SURFACE 678 215 MORRIS ST SUITE 1110 DURHAM, NC 27701 HB WH 03.17.2021 SPR - 2 404/401 AND BUFFER IMPACT DRAWINGS 3 6 ' - 0 " 28 5 ' - 8 " 28 ' - 0 " 5 6 ' - 0 " 56 ' - 0 " 373.75 372.75 371.75 372.25 373.25 42 ' - 0 " 15'-4 " 70 ' - 0 " 6' - 0 " 369 369 3 6 9 36 9 369 36 9 369 36 9 369 36 9 3 6 9 36 9 370 370 370 370 3 7 0 37 0 37 0 37 0 3 7 0 37 0 370 3 7 0 3 7 0 3 7 0 370 3 7 0 3 7 0 37 1 3 7 1 371 371 37 1 371 3 7 1 371 371 3 7 2 3 7 2 372 372 372 372 372 373 37 3 37 3 374 37 4 37 4 375 375 37 5 375 375 375 375 376 376 376 377 3 7 7 3 7 7 378 3 7 8 379 37 9 379 3 8 0 380 380 381 3 8 1 382 38 2 383 38 3 384 3 8 5 385 386 387 388 3 8 9 389 3 9 0 3 9 1 39 2 39 3 39 4 39 5 396 397 IMPACT AREA #1 1"=20'3 IMPACT AREA #1 8' WIDE WOOD DECK BOARDWALK 18" DIA. ONSHORE SONOTUBE FOOTINGS @ 14' O.C.; TYP. 6' WOOD STEPS & BOARDWALK CONNECTOR 5' WIDE GRAVEL TRAIL WETLANDS; TYP. 18" DIA. DEWATERED SONOTUBE FOOTINGS @ 14' O.C.; TYP. 18" DIA. WETLAND SONOTUBE FOOTINGS @ 14' O.C.; TYP. 1 SPR-6 STREAM; TYP. POND EDGE; TYP. EXISTING NATURAL DUFF TRAIL; NO DISTURBANCE NOTE NO VEGETATIVE DISTURBANCE IN BUFFER ZONES OF ANY IMPACT AREA IMPACT AREA #1 PERMANENT PERMANENT TEMPORARY TEMPORARY CONCRETE FOOTINGS FOOTING CONTSTRUCTION 0.0005 AC 0.001 AC 0.0015 AC 0.003 AC 17.70 SF 44.19 SF WETLAND IMPACT BUFFER IMPACT: ZONE 1 POND BOTTOM IMPACT BUFFER IMPACT: ZONE 2 GRAVEL TRAIL GRAVEL TRAIL CONSTRUCTION 83.64 SF 104.55 SF 311.04 SF 388.80 SF PERMANENT TEMPORARY PERMANENT TEMPORARY 0'10'20'40' ZONE 1 ZONE 2 PROPERTY LINE; TYP. CONSTRUCTION SEQUENCE FOR IMPACT AREA #1 THE CONTRACTOR SHALL STRICTLY FOLLOW THE PROCEDURES AND CONSTRUCTION METHODS SHOWN HERE AND ON THE DRAWINGS. 1.THE POND WILL BE LOWERED TO REVEAL FOOTING SITES. 2.SURVEYORS WILL STAKE THE GRAVEL PATH AND LOCATIONS ACCORDING TO THE PLAN. SURVEY CREWS ARE NOT ALLOWED TO DAMAGE ANY VEGETATION. 3.CREWS WILL CLEAR 6' WIDE AREA OF ORGANIC MATTER FOR THE EVENTUAL 5' PATH. CREWS WILL NOT CUT TREE ROOTS OR EXCAVATE TO CHANGE THE CROSS SLOPE OR LONGITUDINAL SLOPE. 4.ALL CONSTUCTION ACCESS SHALL USE THIS 6' DISTURBED PATH, HEADING IN AND BACKING OUT, NO EXTRA DISTURBANCE WILL BE ALLOWED. 5.CREWS WILL HAND DIG FOOTINGS ACCORDING TO THE DETAILS, AND HAND WHEELBARROW OUT EXCESS FILL MATERIALS. THE MATERIALS WILL BE TAKEN TO THE NORTH WHERE THE ATV WITH DUMP BED (FIG. 1) WILL MEET WHEELBARROWS AND HAUL MATERIAL TO WASTE SITES BEYOND THE 100' BUFFER USING AND EXISTING MULCH OLD FARM ROAD. 6.SONOTUBE FORMS WILL BE SET AND BRACED. 7.CONCRETE WILL BE HOSE PUMPED INTO EACH FOOTINGS, FROM A STAGING AREA OUTSIDE THE BUFFER LIMITS. THE FOOTINGS WILL BE POURED TO THE DIMENSIONS AND STRUCTURAL DETAILS. EXCESS CONCRETE WILL BE HAULED OFF SITE. 8.SONOTUBE FORMS WILL BE STRIPPED TO GRADE AND HAULED OFF SITE. 9.DECK CONSTRUCTION WILL BE BY HAND, MATERIALS HAND CARRIED INTO THE SITE. 10.CREWS WILL LAY 3” OF GRAVEL ON THE PATH, USING ATV WITH DUMP BED (FIG. 1) 11.USING THE GRAVEL PATH, CREWS WILL USE THE ATV WITH DUMP BED (FIG. 1) TO APPLY 3” OF MULCH TO ALL DISTURBED AREAS. 12.POND WILL BE REFILLED. FIG. 1 (NTS) 2 SPR-6 GRAVEL TRAIL GRAVEL TRAIL CONSTRUCTION CHECKED BY: DRAWN BY: OWNER Structural Engineer PME ENGINEER PROJECT NO.: REISSUE LIGHTING DESIGNER LANDSCAPE ARCHITECT SHEET ISSUE LOUIS CHERRY, FAIA 222 N. BLOODWORTH STREET, RALEIGH, NORTH CAROLINA 27601 919.971.2299 LOUIS@LOUISCHERRY.COM PHASE: LOUIS CHERRY ARCHITECTURE Registered Architectural Corporation North Carolina RALEI GH ,N .C . L O U I S W.CHERR Y N ORTH CA RO L I N A RE G I S T E R E D ARCHIT E CT 485 2 SURFACE 678 215 MORRIS ST SUITE 1110 DURHAM, NC 27701 HB WH 03.17.2021 SPR - 3 404/401 AND BUFFER IMPACT DRAWINGS WETLAND FOOTING ONSHORE FOOTING TEMPORARY IMPACT DEWATERED FOOTING WETLAND STREAM POND LEGEND BUFFER - ZONE 1 BUFFER - ZONE 2 PERMANENT IMPACT TEMPORARY IMPACT GRAVEL PATH CHECKED BY: DRAWN BY: OWNER Structural Engineer PME ENGINEER PROJECT NO.: REISSUE LIGHTING DESIGNER LANDSCAPE ARCHITECT SHEET ISSUE LOUIS CHERRY, FAIA 222 N. BLOODWORTH STREET, RALEIGH, NORTH CAROLINA 27601 919.971.2299 LOUIS@LOUISCHERRY.COM PHASE: LOUIS CHERRY ARCHITECTURE Registered Architectural Corporation North Carolina RALEI GH ,N .C . L O U I S W.CHERR Y N ORTH CA RO L I N A RE G I S T E R E D ARCHIT E CT 485 2 SURFACE 678 215 MORRIS ST SUITE 1110 DURHAM, NC 27701 HB WH 03.17.2021 SPR - 4 404/401 AND BUFFER IMPACT DRAWINGS 2-'6" X 2'-6" ONSHORE CONC. FOOTING; TYP. 1 0 ' - 0 " 20'-0" 1 0 ' - 0 " XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX 2 3 5 ' - 1 0 " 6'-0" 369 369 370 370 370 371 37 1 372 372 373 374 375 3 7 5 375 3 7 6 3 7 7 3 7 8 379 3 8 0 380 380 38 1 381 38 2 382 383 383 38 4 3 8 4 385 IMPACT AREA #3 1"=20'5 POND EDGE ZONE 1 ZONE 2 5' WIDE GRAVEL TRAIL 6' WIDE BOARWALK CONNECTOR IMPACT AREA#3 KAYAK LAUNCH 2-'6" X 2'-6" DEWATERED CONC. FOOTING; TYP. NOTE NO VEGETATIVE DISTURBANCE IN BUFFER ZONES OF ANY IMPACT AREA IMPACT AREA #3 PERMANENT TEMPORARY 12.50 SF 24.50 SF BUFFER IMPACT: ZONE 1 POND BOTTOM IMPACT BUFFER IMPACT: ZONE 2 GRAVEL TRAIL GRAVEL TRAIL CONSTRUCTION 80.10 SF 100.60 SF 174.38 SF 217.98 SF PERMANENT TEMPORARY PERMANENT TEMPORARY 0.0008 AC 0.002 AC 0'10'20'40' CONSTRUCTION SEQUENCE FOR IMPACT AREA #3 THE CONTRACTOR SHALL STRICTLY FOLLOW THE PROCEDURES AND CONSTRUCTION METHODS SHOWN HERE AND ON THE DRAWINGS. 1.THE POND WILL BE LOWERED TO REVEAL FOOTING SITES. 2.SURVEYORS STAKE THE GRAVEL PATH AND FOOTING LOCATIONS ACCORDING TO THE PLAN. SURVEY CREWS ARE NOT ALLOWED TO DAMAGE ANY VEGETATION. 3.CREWS WILL CLEAR 6' WIDE AREA OF ORGANIC MATTER FOR THE EVENTUAL 5' PATH. CREWS WILL NOT CUT TREE ROOTS OR EXCAVATE TO CHANGE THE CROSS SLOPE OR LONGITUDINAL SLOPE. 4.ALL CONSTUCTION ACCESS SHALL USE THIS 6' DISTURBED PATH, HEADING IN AND BACKING OUT, NO EXTRA DISTURBANCE WILL BE ALLOWED. 5.CREWS WILL MINI-EXCAVATOR (FIG. 2) TO DIG FOOTINGS ACCORDING TO THE DETAILS AND PLACING EXCAVATED MATERIAL INTO THE ATV WITH DUMP BED (FIG. 1). THE MATERIALS WILL BE TAKEN TO THE NORTH WHERE THE ATV WITH DUMP BED (FIG. 1) WILL HAUL MATERIAL TO WASTE SITES BEYOND THE 100' BUFFER. 6.CONCRETE WILL BE HOSE PUMPED INTO EACH EARTH FORMED FOOTINGS, FROM A STAGEING AREA OUTSIDE THE BUFFER LIMITS. THE FOOTINGS WILL BE POURED TO THE DIMENSIONS AND STRUCTURAL DETAILS. EXCESS CONCRETE WILL BE HAULED OFF SITE. 7.DECK CONSTRUCTION WILL BE BY HAND, MATERIALS HAND CARRIED INTO THE SITE. 8.CREWS WILL LAY 3” OF GRAVEL ON THE PATH, USING ATV WITH DUMP BED. 9.USING THE GRAVEL PATH, CREWS WILL USE THE ATV WITH DUMP BED (FIG. 1) TO APPLY 3” OF MULCH TO ALL DISTURBED AREAS. 10.POND WILL BE REFILLED. 2 SPR-6 CONCRETE FOOTINGS FOOTING CONTSTRUCTION GRAVEL TRAIL GRAVEL TRAIL CONSTRUCTION 24'-0" 62 ' - 6 " 6'-0" 16 ' - 0 " 369 369 370 370 371 372 37 337 4 375 375376 377 378 379 380 380 381 382 38 3 384 385 IMPACT AREA #2 1"=20'4 PAVILLION OVER WATER; SEE ARCHITECTURAL DRAWINGS IMPACT AREA #2 6' WIDE WOOD DECK 2-'6" X 2'-6" DEWATERED CONC. FOOTING; TYP. 2-'6" X 2'-6" ONSHORE CONC. FOOTING; TYP. 5' WIDE GRAVEL TRAIL NOTE NO VEGETATIVE DISTURBANCE IN BUFFER ZONES OF ANY IMPACT AREA IMPACT AREA #2 PERMANENT TEMPORARY 12.50 SF 24.50 SF BUFFER IMPACT: ZONE 1 POND BOTTOM IMPACT BUFFER IMPACT: ZONE 2 GRAVEL TRAIL GRAVEL TRAIL CONSTRUCTION 86.58 SF 108.23 SF 198.68 SF 248.35 SF PERMANENT TEMPORARY PERMANENT TEMPORARY 0.002 AC 0.004 AC POND EDGE ZONE 1 ZONE 2 WETLANDS; TYP. 0'10'20'40' CONSTRUCTION SEQUENCE FOR IMPACT AREA #2 THE CONTRACTOR SHALL STRICTLY FOLLOW THE PROCEDURES AND CONSTRUCTION METHODS SHOWN HERE AND ON THE DRAWINGS. 1.THE POND WILL BE LOWERED TO REVEAL FOOTING SITES. 2.SURVEYORS STAKE THE GRAVEL PATH AND FOOTING LOCATIONS ACCORDING TO THE PLAN. SURVEY CREWS ARE NOT ALLOWED TO DAMAGE ANY VEGETATION. 3.CREWS WILL CLEAR 6' WIDE AREA OF ORGANIC MATTER FOR THE EVENTUAL 5' PATH. CREWS WILL NOT CUT TREE ROOTS OR EXCAVATE TO CHANGE THE CROSS SLOPE OR LONGITUDINAL SLOPE. 4.ALL CONSTUCTION ACCESS SHALL USE THIS 6' DISTURBED PATH, HEADING IN AND BACKING OUT, NO EXTRA DISTURBANCE WILL BE ALLOWED. 5.CREWS WILL USE A MINI-EXCAVATOR (FIG. 2) TO DIG FOOTINGS ACCORDING TO THE DETAILS AND PLACING EXCAVATED MATERIAL INTO THE ATV WITH DUMP BED. THE MATERIALS WILL BE TAKEN TO THE NORTH WHERE THE ATV WITH DUMP (FIG. 1) BED WILL HAUL MATERIAL TO WASTE SITES BEYOND THE 100' BUFFER. 6.CONCRETE WILL BE HOSE PUMPED INTO EACH EARTH FORMED FOOTINGS, FROM A STAGEING AREA OUTSIDE THE BUFFER LIMITS. THE FOOTINGS WILL BE POURED TO THE DIMENSIONS AND STRUCTURAL DETAILS. EXCESS CONCRETE WILL BE HAULED OFF SITE. 7.DECK CONSTRUCTION WILL BE BY HAND, MATERIALS HAND CARRIED INTO THE SITE. 8.CREWS WILL LAY 3” OF GRAVEL ON THE PATH, USING ATV WITH DUMP BED (FIG. 1). 9.USING THE GRAVEL PATH, CREWS WILL USE THE ATV WITH DUMP BED (FIG. 1) TO APPLY 3” OF MULCH TO ALL DISTURBED AREAS. 10.POND WILL BE REFILLED. FIG. 1 (NTS) FIG. 2 (NTS) 2 SPR-6 CONCRETE FOOTINGS FOOTING CONTSTRUCTION GRAVEL TRAIL GRAVEL TRAIL CONSTRUCTION WETLAND FOOTING ONSHORE FOOTING TEMPORARY IMPACT DEWATERED FOOTING WETLAND STREAM POND LEGEND BUFFER - ZONE 1 BUFFER - ZONE 2 PERMANENT IMPACT TEMPORARY IMPACT GRAVEL PATH WETLAND FOOTING ONSHORE FOOTING TEMPORARY IMPACT DEWATERED FOOTING WETLAND STREAM POND LEGEND BUFFER - ZONE 1 BUFFER - ZONE 2 PERMANENT IMPACT TEMPORARY IMPACT GRAVEL PATH Shee t 4 o f 5 Kris Bass E n g i n e e r i n g Raleigh, NC Kris Bass 919.960.1552 (c )kbass@kbeng.org Macon Pond R o a d Raleigh, NC HSU Pond P r o j e c t HSU POND S P I L L W A Y I M P R O V E M E N T FINAL DRA W I N G F O R P E R M I T T I N G W E T L A N D I M P A C T 5 8 0 S F T E M P O R A R Y W E T L A N D I M P A C T = 6 6 6 S F P E R M A N E N T W E T L A N D I M P A C T S = 5 8 0 S F T O T A L O P E N W A T E R I M P A C T S = 1 , 5 8 4 S F T E M P O R A R Y B U F F E R I M P A C T S = 2 , 3 5 6 S F F e e t 0 3 0 6 0 S C A L E : 1 I N = 3 0 F T W E T L A N D I M P A C T 6 6 6 S F N E U S E B U F F E R N E U S E B U F F E R T E M P O R A R Y B U F F E R I M P A C T 6 4 1 S F T E M P O R A R Y B U F F E R I M P A C T 1 , 7 1 5 S F E X I S T I N G D A M F O O T P R I N T O P E N W A T E R I M P A C T 1 5 8 4 S F EXHIBIT: HSU POND SPILLWAY IMPROVEMENT 1"=20'7 0'10'20'40' CHECKED BY: DRAWN BY: OWNER Structural Engineer PME ENGINEER PROJECT NO.: REISSUE LIGHTING DESIGNER LANDSCAPE ARCHITECT SHEET ISSUE LOUIS CHERRY, FAIA 222 N. BLOODWORTH STREET, RALEIGH, NORTH CAROLINA 27601 919.971.2299 LOUIS@LOUISCHERRY.COM PHASE: LOUIS CHERRY ARCHITECTURE Registered Architectural Corporation North Carolina RALEI GH ,N .C . L O U I S W.CHERR Y N ORTH CA RO L I N A RE G I S T E R E D ARCHIT E CT 485 2 SURFACE 678 215 MORRIS ST SUITE 1110 DURHAM, NC 27701 HB WH 03.17.2021 SPR - 5 404/401 AND BUFFER IMPACT DRAWINGS 352353 353 353 354 354 354 3 5 4 355 355 355 355 355 35 5 3 5 6 356 3 5 6 3 5 6 357 357 357 358 35 8 358 359 359 359 360 360 360 3 6 0 360 361 361 361 362 362 36 2 362 363 363 36 3 364 364 364 365 3 6 5 36 5 3 6 5 365 366 3 6 6 36 6 367 3 6 7 368 3 6 8 368 3 6 9 369 3 6 9 369 3 6 9 369 370 370 370 370 3 7 0 3 7 0 3 7 0 3 7 0 371 371 3 7 1 3 7 1 372 372 3 7 2 3 7 2 373 3 7 3 3 7 3 374 3 7 4 375 375 37 5 376 376 377 377 378 378 379 379 380 380 380 381 6'-0" 4 2 ' - 6 " XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX IMPACT AREA #4 1"=20'6 IMPACT AREA #4 6' WIDE WOOD BRIDGE 7'-0" X 3'-0" ONSHORE CONC. FOOTING; TYP. FOOTINGS AND 8X8 POSTS TO BE OUTSIDE STREAMFLOW 5' WIDE GRAVEL TRAIL 5' WIDE GRAVEL TRAIL CONCRETE BUTTRESS; REFER TO STRUCTURAL DRAWINGS; TYP. 3 SPR-6 EXISTING WOOD FENCE EXISTING DAM (REPAIRED) NOTE NO VEGETATIVE DISTURBANCE IN BUFFER ZONES OF ANY IMPACT AREA IMPACT AREA #4 49.00 SF 88.00 SF BUFFER IMPACT: ZONE 1 BUFFER IMPACT: ZONE 2 GRAVEL TRAIL GRAVEL TRAIL CONSTRUCTION 84.10 SF 105.13 SF 456.25 SF 570.31 SF PERMANENT TEMPORARY PERMANENT TEMPORARY POND EDGE ZONE 1 ZONE 2 0'10'20'40' CONSTRUCTION SEQUENCE FOR IMPACT AREA #4 THE CONTRACTOR SHALL STRICTLY FOLLOW THE PROCEDURES AND CONSTRUCTION METHODS SHOWN HERE AND ON THE DRAWINGS. 1.SURVEYORS WILL STAKE THE GRAVEL PATH AND FOOTING LOCATIONS ACCORDING TO THE PLAN. SURVEY CREWS ARE NOT ALLOWED TO DAMAGE ANY VEGETATION. 2.CREWS WILL CLEAR 6' WIDE AREA OF ORGANIC MATTER FOR THE EVENTUAL 5' PATH. CREWS WILL NOT CUT TREE ROOTS OR EXCAVATE TO CHANGE THE CROSS SLOPE OR LONGITUDINAL SLOPE. 3.ALL CONSTUCTION ACCESS SHALL USE THIS 6' DISTURBED PATH, HEADING IN AND BACKING OUT, NO EXTRA DISTURBANCE WILL BE ALLOWED. 4.CREWS WILL MINI-EXCAVATOR (FIG. 2) TO DIG FOOTINGS ACCORDING TO THE DETAILS AND PLACING EXCAVATED MATERIAL INTO THE ATV WITH DUMP BED (FIG. 1). THE MATERIALS WILL BE TAKEN TO THE NORTH WHERE THE ATV WITH DUMP BED (FIG. 1) WILL HAUL MATERIAL TO WASTE SITES BEYOND THE 100' BUFFER. 5.CONCRETE WILL BE HOSE PUMPED INTO EACH EARTH FORMED FOOTINGS, FROM A STAGEING AREA OUTSIDE THE BUFFER LIMITS. THE FOOTINGS WILL BE POURED TO THE DIMENSIONS AND STRUCTURAL DETAILS. EXCESS CONCRETE WILL BE HAULED OFF SITE. 6.DECK CONSTRUCTION WILL BE BY HAND, MATERIALS HAND CARRIED INTO THE SITE. 7.CREWS WILL LAY 3” OF GRAVEL ON THE PATH, USING ATV WITH DUMP BED (FIG. 1). 8.USING THE GRAVEL PATH, CREWS WILL USE THE ATV WITH DUMP BED (FIG. 1) TO APPLY 3” OF MULCH TO ALL DISTURBED AREAS. FIG. 1 (NTS) FIG. 2 (NTS) 2 SPR-6 2 SPR-6 CONCRETE FOOTINGS FOOTING CONTSTRUCTION GRAVEL TRAIL GRAVEL TRAIL CONSTRUCTION *NOTE THIS DRAWING IS INCLUDED FOR REFERENCE ONLY. SCOPE OF WORK IN THIS DRAWING IS CURRENTLY UNDER CONSTRUCTION. WETLAND BOARDWALK1NOTE: CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR L ARCH REVIEW AND APPROVAL 0 1'2' 18" SONOTUBE FOOTING @ 14' O.C. MAX; TYP. (2) 2X10 BEAM; TYP. 2X10 JOISTS @ 16" O.C. 5/4 X 6" PLANK DECKING; TYP. 2" 2x4 CONTINUOUS TOE RAIL; TYP. 2x4X6 SUPPORT @ 2' O.C.; TYP. 8'-0" 6'-0" FINISH GRADE TEMPORARY IMPACT AREA; TYP. GRAVEL TRAIL2NOTE: CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR L ARCH REVIEW AND APPROVAL 0 1'2' GEOTEXTILE FABRIC EXCAVATE 3". EXCAVATED MATERIAL TO BE BACKED OUT ALONG TRAIL AND DEPOSITED OUTSIDE BUFFER 5'-0" PERMANENT IMPACT 3" FINISH GRADE PLACE 3" DEPTH OF #78 STONE 6" TEMP. DISTURBANCE SPILLWAY BRIDGE SPAN DIAGRAM3NOTE: CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR L ARCH REVIEW AND APPROVAL 0 4'8' 4'-0"34'-6"4'-0" 42'-6" DAM SPILLWAY SHORE CONCRETE BUTTRESS 3'-0"W X 7'-0"L X 1'-6"D FOOTING 8X8 POST, P.T. FOR MARINE GRADE USE; TYP. 3X6 NOMINAL PLANK DECK FOR LIGHT VEHICULAR TRAFFIC (3) 5 X 13 3/4 CROSS BEAM; TYP. (2) 5 X 13 3/4 X 40' LONG GLULAM BEAM; TYP. STREAMFLOW SPR - 6 404/401 AND BUFFER IMPACT DRAWINGS CHECKED BY: DRAWN BY: OWNER Structural Engineer PME ENGINEER PROJECT NO.: REISSUE LIGHTING DESIGNER LANDSCAPE ARCHITECT SHEET ISSUE LOUIS CHERRY, FAIA 222 N. BLOODWORTH STREET, RALEIGH, NORTH CAROLINA 27601 919.971.2299 LOUIS@LOUISCHERRY.COM PHASE: LOUIS CHERRY ARCHITECTURE Registered Architectural Corporation North Carolina SURFACE 678 215 MORRIS ST SUITE 1110 DURHAM, NC 27701 ENVIRONMENTAL PERMITTING HB 04/18/22 NO T F O R CO N S T R U C T I O N WH