HomeMy WebLinkAbout20171507 Ver 3_USACE Permit_20220726U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2020-01905 County: Wake U.S.G.S. Quad: NC-New Hill GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Town of Apex Address: PO Box 250 Apex, NC 27502 Size (acres) ~4 acres Nearest Town Apex Nearest Waterway UT to Reddy Branch River Basin Cape Fear USGS HUC 03030002 Coordinates Latitude: 35.729195 Longitude: -78.916459 Location description: The project site is located north of Olive Chapel Road and south of the terminus of Hasse Avenue, east of Richardson Road and west of Pricewood Lane in Apex, Wake County, North Carolina. Description of projects area and activity: This verification authorizes the permanent discharge of fill material within 72 linear feet (0.008 acres) of stream channel, the permanent discharge of fill material resulting in no loss of stream channel within 39 linear feet of stream channel, the temporary discharge of fill material within 33 linear feet of stream channel and the permanent discharge of fill material within 0.255 acres of wetlands. Applicable Law(s): ☒Section 404 (Clean Water Act, 33 USC 1344) ☐Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 14. Linear Transportation Projects SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached Conditions, your application signed and dated 3/16/2022, the ensuing administrative record and the enclosed plans. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit’s expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact George Lyle Phillips III at (919) 554-4884 X25 or George.L.Phillips@usace.army.mil. Corps Regulatory Official: _____________________________________________________Date: 7/26/2022 Expiration Date of Verification: 3/14/2026 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Copy furnished: Colleen Cohn – NCDEQ-DWR – 3800 Barrett Drive, Raleigh, NC 27609 Ashley Yarsinske – Wildlands Holdings – 1430 South Mint Street, Suite 104, Charlotte, NC 28203 Amy Staley – RES, LLC. – 701 E. Bay Street, Suite 306, Charleston, SC 29403 Kimberly Browning – USACE – 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 SAW-2020-01905 SPECIAL CONDITIONS a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. Action ID Number: SAW-2020-01905 County: Wake Permittee: Town of Apex Project Name: Hasse Avenue Extension Date Verification Issued: 7/26/2022 Project Manager: George Lyle Phillips III Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: George Lyle Phillips III Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or George.L.Phillips@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. _______________________________________ ______________________ Signature of Permittee Date U.S. ARMY CORPS OF ENGINEERS  Wilmington District  Page 1 of 2 Form Version 10 June 2020_updated Compensatory Mitigation Responsibility Transfer Form    Permittee: Town of Apex                                                                                       Action ID: SAW‐2020‐01905 Project Name: Hasse Avenue Extension County: Wake      Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved  Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the  transfer of the mitigation responsibility.  Once the Sponsor has signed this form, it is the Permittee’s responsibility to ensure  that Wilmington District Project Manager identified on page two is in receipt of a signed copy of this form before conducting  authorized impacts, unless otherwise specified below.  If more than one Mitigation Sponsor will be used to provide the  mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8‐digit Hydrologic  Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must  be provided to the appropriate Mitigation Sponsors.     Instructions to Sponsor: The Sponsor verifies that the mitigation requirements (credits) shown below have been released  and are available at the identified site.  By signing below, the Sponsor is accepting full responsibility for the identified  mitigation, regardless of whether they have received payment from the Permittee.  Once the form is signed, the Sponsor  must update the bank ledger and provide a copy of the signed form and the updated ledger to the Permittee, the Project  Manager who issued the permit, the Bank Project Manager, and the District Mitigation Office (see contact information on  page 2).  The Sponsor must also comply with all reporting requirements established in their authorizing instrument.     Permitted Impacts and Compensatory Mitigation Requirements:    Permitted Impacts Requiring Mitigation* 8‐digit HUC and Basin: 03030002, Cape Fear River Basin  Stream Impacts (linear feet) Wetland Impacts (acres)  Warm Cool Cold Riparian Riverine Riparian Non‐Riverine Non‐Riparian Coastal  72      0.2355    *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor.    Compensatory Mitigation Requirements: 8‐digit HUC and Basin: 03030002, Cape Fear River Basin  Stream Mitigation (credits) Wetland Mitigation (credits)  Warm Cool Cold Riparian Riverine Riparian Non‐Riverine Non‐Riparian Coastal  144     0.471      Mitigation Site Debited: Cane Creek Umbrella Mitigation Banking Instrument – UT to Pine Hill Mitigation Bank, South Fork  Mitigation Site, and Bethel Branch Mitigation Site (List the name of the bank to be debited. For umbrella banks, also list the  specific site.  For NCDMS, list NCDMS.  If the NCDMS acceptance letter identifies a specific site, also list the specific site to be  debited).  Section to be completed by the Mitigation Sponsor    Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation  transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for  providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action  ID number shown.   I also verify that released credits (and/or advance credits for NCDMS), as approved by the Wilmington  District, are currently available at the mitigation site identified above.  Further, I understand that if the Sponsor fails to provide  the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to  ensure compliance associated with the mitigation requirements.    Mitigation Sponsor Name:      Name of Sponsor’s Authorized Representative:           Signature of Sponsor’s Authorized Representative Date of Signature    Conditions for Transfer of Compensatory Mitigation Credit:   Once this document has been signed by the Mitigation Sponsor and the District is in receipt of the signed form, the  Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains  responsible for any other mitigation requirements stated in the permit conditions.   Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after  the District is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted  responsibility for providing the mitigation requirements listed herein.  When NCDMS provides mitigation for authorized  impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas  may proceed upon permit issuance; however, a copy of this form signed by NCDMS must be provided to the District  within 30 days of permit issuance.  NCDOT remains fully responsible for the mitigation until the District has received this  form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein.   Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative  records for both the permit and the Bank/ILF Instrument.  It is the Permittee’s responsibility to ensure that the District  Project Manager (address below) is provided with a signed copy of this form.   If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to  the District, the Sponsor must obtain case‐by‐case approval from the District Project Manager and/or North Carolina  Interagency Review Team (NCIRT).  If approved, higher mitigation ratios may be applied, as per current District guidance  and a new version of this form must be completed and included in the District administrative records for both the permit  and the Bank/ILF Instrument.    Comments/Additional Conditions: Letters from Wildlands Holdings, confirming they are willing and able to accept the  applicant’s compensatory mitigation responsibility, dated 3/15/2022 was included with the preconstruction notification.    This form is not valid unless signed below by the District Project Manager and by the Mitigation Sponsor on Page 1.  Once  signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the  District Project Manager at the address below, 3) the Bank Manager listed in RIBITS, and 4) the Wilmington District  Mitigation Office, 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 (or by email to SAWMIT@usace.army.mil).   Questions regarding this form or any of the permit conditions may be directed to the District Mitigation Office.    USACE Project Manager: George Lyle Phillips III   USACE Field Office: Raleigh Regulatory Office    US Army Corps of Engineers    3331 Heritage Trade Drive, Suite 105    Wake Forest, North Carolina 27587   Email: George.L.Phillips@usace.army.mil            7/26/2022    USACE Project Manager Signature Date of Signature    Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and  mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is  available at http://ribits.usace.army.mil.                  U.S. ARMY CORPS OF ENGINEERS  Wilmington District  Compensatory Mitigation Responsibility Transfer Form     Permittee: Town of Apex                                                                                       Action ID: SAW‐2020‐01905 Project Name: Hasse Avenue Extension County: Wake        Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved  Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the  transfer of the mitigation responsibility.  Once the Sponsor has signed this form, it is the Permittee’s responsibility to ensure  that Wilmington District Project Manager identified on page two is in receipt of a signed copy of this form before conducting  authorized impacts, unless otherwise specified below.  If more than one Mitigation Sponsor will be used to provide the  mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8‐digit Hydrologic  Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must  be provided to the appropriate Mitigation Sponsors.     Instructions to Sponsor: The Sponsor verifies that the mitigation requirements (credits) shown below have been released  and are available at the identified site.  By signing below, the Sponsor is accepting full responsibility for the identified  mitigation, regardless of whether they have received payment from the Permittee.  Once the form is signed, the Sponsor  must update the bank ledger and provide a copy of the signed form and the updated ledger to the Permittee, the Project  Manager who issued the permit, the Bank Project Manager, and the District Mitigation Office (see contact information on  page 2).  The Sponsor must also comply with all reporting requirements established in their authorizing instrument.     Permitted Impacts and Compensatory Mitigation Requirements:     Permitted Impacts Requiring Mitigation* 8‐digit HUC and Basin: 03030002, Cape Fear River Basin  Stream Impacts (linear feet) Wetland Impacts (acres)  Warm Cool Cold Riparian Riverine Riparian Non‐Riverine Non‐Riparian Coastal       0.0195    *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor.    Compensatory Mitigation Requirements: 8‐digit HUC and Basin: 03030002, Cape Fear River Basin  Stream Mitigation (credits) Wetland Mitigation (credits)  Warm Cool Cold Riparian Riverine Riparian Non‐Riverine Non‐Riparian Coastal      0.039      Mitigation Site Debited: EBX sponsored RES Cape Fear 02 Umbrella Mitigation Bank ‐ Cloud & Banner Site (List the name of  the bank to be debited. For umbrella banks, also list the specific site.  For NCDMS, list NCDMS.  If the NCDMS acceptance  letter identifies a specific site, also list the specific site to be debited).  Section to be completed by the Mitigation Sponsor    Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation  transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for  providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action  ID number shown.   I also verify that released credits (and/or advance credits for NCDMS), as approved by the Wilmington  District, are currently available at the mitigation site identified above.  Further, I understand that if the Sponsor fails to provide  the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to  ensure compliance associated with the mitigation requirements.    Mitigation Sponsor Name:      Name of Sponsor’s Authorized Representative:           Signature of Sponsor’s Authorized Representative Date of Signature    Conditions for Transfer of Compensatory Mitigation Credit:   Once this document has been signed by the Mitigation Sponsor and the District is in receipt of the signed form, the  Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains  responsible for any other mitigation requirements stated in the permit conditions.   Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after  the District is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted  responsibility for providing the mitigation requirements listed herein.  When NCDMS provides mitigation for authorized  impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas  may proceed upon permit issuance; however, a copy of this form signed by NCDMS must be provided to the District  within 30 days of permit issuance.  NCDOT remains fully responsible for the mitigation until the District has received this  form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein.   Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative  records for both the permit and the Bank/ILF Instrument.  It is the Permittee’s responsibility to ensure that the District  Project Manager (address below) is provided with a signed copy of this form.   If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to  the District, the Sponsor must obtain case‐by‐case approval from the District Project Manager and/or North Carolina  Interagency Review Team (NCIRT).  If approved, higher mitigation ratios may be applied, as per current District guidance  and a new version of this form must be completed and included in the District administrative records for both the permit  and the Bank/ILF Instrument.    Comments/Additional Conditions: Letters from RES, LLC., confirming they are willing and able to accept the applicant’s  compensatory mitigation responsibility, dated 03/10/2022 was included with the preconstruction notification.    This form is not valid unless signed below by the District Project Manager and by the Mitigation Sponsor on Page 1.  Once  signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the  District Project Manager at the address below, 3) the Bank Manager listed in RIBITS, and 4) the Wilmington District  Mitigation Office, 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 (or by email to SAWMIT@usace.army.mil).   Questions regarding this form or any of the permit conditions may be directed to the District Mitigation Office.    USACE Project Manager: George Lyle Phillips III   USACE Field Office: Raleigh Regulatory Office    US Army Corps of Engineers    3331 Heritage Trade Drive, Suite 105    Wake Forest, North Carolina 27587   Email: George.L.Phillips@usace.army.mil            7/26/2022    USACE Project Manager Signature Date of Signature    Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and  mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is  available at http://ribits.usace.army.mil. S S W W W W W W W W W W W WW S S S S S S S S O H E O H E O H E O H E O H E O H E OHE E E FO B C C EE FO B FOB CEFOB X X X X X X X X X 2 6 0 2 7 0 2 8 0 2 9 0 260 26 0 2 7 0 26 0 27 0 2 8 0 290 300 310 310 320 3 1 0 32 0 330 34 0 32 0 330 340 3 1 0 32 0 3 2 0 3 3 0 330 3 3 0 3 3 0 31 0 3 2 0 3 3 0 3 3 0 3 3 0 33 0 2 6 0 27 0 2 8 0 29 0 3 0 0 3 1 0 3 2 0 26 0 2 7 0 2 8 0 2 9 0 3 0 0 310 250 260 310 3 2 0 3 3 0 3 4 0 3 0 0 29 0 2 9 0 3 0 0 3 1 0 280 280 300 310 320 32 0 3 3 0 320 33 0 3 2 0 32 0 N 8 7 ° 4 6 ' 3 6 " W 44 3 . 9 2 ' N 01°42'56" E 1191.60' N 01°42'19" E 635.94' TO CL CREEK 643.96' TO EIP N 01°35'14" E 287.72' (TIE LINE) S 20°4 5 ' 1 2 " E 790.03 ' S 5 6 ° 3 3 ' 2 5 " E 611 . 0 3 ' S 11°18'4 6 " E 500.58' S 11°21'5 3 " E 392.29' S 11°20'4 1 " E 425.59' S 7 0 ° 1 9 ' 5 6 " W 6 8 2 . 5 8 ' N 02°31'13" E 674.17' M I C H A E L E B A S S D B 1 6 6 1 0 , P G 3 9 7 L O T 2 " W I L L I A M E . G E R R I N G E R " B M 1 9 8 2 , P G 2 4 P I N N o . 0 7 2 2 5 0 5 1 6 7 E X I S T I N G P O W E R P O L E 310320 260 27 0 2 8 0 29 0 © 2021 Microsoft Corporation © 2021 TomTom GENERAL NOTES 1.BASIS OF BEARINGS: NC STATE PLANE GRID COORDINATES, NAD83(2011). 2.ALL DISTANCES ARE HORIZONTAL GROUND DISTANCES IN U.S. SURVEY FEET UNLESS OTHERWISE NOTED. 3.AREAS SHOWN HEREON WERE COMPUTED USING THE COORDINATE METHOD. 4.LINES NOT SURVEYED ARE SHOWN AS BROKEN LINES FROM INFORMATION REFERENCED ON THE FACE OF THIS PLAT. 5.NO EVIDENCE OF EARTH MOVING WAS OBSERVED IN THE PROCESS OF CONDUCTING FIELDWORK ON SUBJECT PARCEL. 6.NO EVIDENCE OF RECENT STREET OR SIDEWALK CONSTRUCTION OR REPAIRS OBSERVED IN THE PROCESS OF CONDUCTING FIELDWORK. 7.NO EVIDENCE OF BURIAL GROUNDS WAS OBSERVED IN THE PROCESS OF CONDUCTING FIELDWORK. 8.A PORTION OF SUBJECT PROPERTY IS LOCATED WITHIN A FLOOD HAZARD AREA ACCORDING TO FLOOD INSURANCE RATE MAP 3720072200J DATED MAY 2, 2006. 9.IRON PIPES SET AT ALL CORNERS UNLESS OTHERWISE NOTED. No. Checked By Revision Designer Drawn By Date By Scale Date Job No. Sheet No.WithersRavenel Engineers [ Planners [ STrveyors 115 MacKenan Drive | Cary, NC 27511 t: 919.469.3340 | license #: C-0832 | www.withersravenel.com02180517.2 A03/10/2022 AS NOTED APEX WAKE COUNTY NORTH CAROLINABM EB WR HUXLEY - HASSE AVENUE OVERALL EXISTING CONDITIONS GRAPHIC SCALE 1 inch = 300 ft. 300 0 150 300 600 VICINITY MAPVICINITY MAP 1"=5000' SITE O L I V E C H A P E L R O A D ( S R 1 1 6 0 ) V A R I A B L E W I D T H P U B L I C R O W HASSE A V E N U E 60' PUBL I C R O W K I M A N A D R I V E W4 W5 W6 W7 95 TTPL 91 TTPL 60 & 90 TTPL 42 TTCHA W3 S01 STOP 107A TT 112B B 186 TTCH S02 START 113 TTCH 162 W8 POND 1 POND 2 W1 C 12 & 13 TTCH W2 29 TTPL 01 & 24 TT PIPE STREAM START AT PIPE 30 TTPL ROWBOAT ROAD 50' PUBLIC ROW F A R M H O U S E D R I V E 5 0 ' P U B L I C R O W S S S S S S S S S S FO B C C FO B FOB CFOB W W W W W W W W W W E EFOB C C E EFOB FOB CEFOB © 2022 Microsoft Corporation © 2022 TomTom VICINITY MAPVICINITY MAP 1"=5000' MAP C MAP E SITE GRAPHIC SCALE 1 inch = 300 ft. 300 0 150 300 600 HAS S E A V E N U E O L I V E C H A P E L R O A D ( S R 1 1 6 0 ) V A R I A B L E W I D T H P U B L I C R O W HAS S E A V E N U E No. Checked By Revision Designer Drawn By Date By Scale Date Job No. Sheet No.WithersRavenel Engineers [ Planners [ STrveyors 115 MacKenan Drive | Cary, NC 27511 t: 919.469.3340 | license #: F-1479 | www.withersravenel.com02180517.20 03/10/2022 AS NOTED APEX WAKE COUNTY NORTH CAROLINABM EB WR HUXLEY - HASSE AVENUE STREAM AND WETLAND IMPACT MAP B IMPACT AREA 1 IMPACT AREA 2 W W W W WW W W W W W W T P TP TP TP T P T P TPTP T P TP TP TP TP T P TP TP TP T P TP TP TP X X X X X X X X X X X X X X X X X X X X X X X X X X X 2 6 5 26 6 . 0 265 270 27 5 2 7 0 26 5 2 6 0 26 1 . 0 0 + 0 0 1 + 0 0 1 + 0 0 0 + 0 0 IMPACT S4 TEMPORARY STREAM IMPACTS TEMPORARY CONSTRUCTION ACCESS 18 LF (90 SF) IMPACT S2 PERMANENT STREAM IMPACTS RIP-RAP DISSIPATOR STREAM INSTALLATION (NO FUNCTIONAL LOSS) 39 LF (192 SF) IMPACT S3 PERMANENT STREAM IMPACTS ROAD CROSSING AND GRADING (FUNCTIONAL LOSS) 72 LF (385 SF) CULVERT ACCESS & MAINTENANCE EASEMENT TOP OF BANK STREAM SEDIMENT BAG FLEXIBLE HOSE UPSTREAM TEMPORARY COFFER DAM RIP-RAP STILLING BASIN (SEE DETAIL SHEET D) LIMIT OF DISTURBANCE LIMIT OF DISTURBANCE CULVERT ACCESS & MAINTENANCE EASEMENT TOP OF BANK 50' TOWN OF APEX BUFFER 50' TOWN OF APEX BUFFER 9' x 7 ' B O X C U L V E R T 50' TOWN OF APEX BUFFER 50' TOWN OF APEX BUFFER IMPACT S1 TEMPORARY STREAM IMPACTS TEMPORARY CONSTRUCTION ACCESS 15 LF (73 SF) TEMPORARY PUMP AROUND HAS S E A V E N U E 60' P U B L I C R I G H T O F W A Y BM 2 0 2 0 , P G 1 3 3 4 EXISTING 1% ANNUAL FLOOD ZONE (ZONE AE) DOWNSTREAM TEMPORARY COFFER DAM 255 260 265 270 275 255 260 265 270 275 0+00 26 2 . 3 4 26 2 . 3 4 0+50 25 9 . 1 7 25 9 . 1 7 1+00 255 260 265 270 275 255 260 265 270 275 PROPOSED GRADE EXISTING GRADE STREAM BED 0+00 26 5 . 2 2 26 5 . 2 2 0+50 26 2 . 7 1 26 2 . 7 1 1+00 NOTE: CULVERT TO BE BURIED 1' BELOW STREAM BED PROPOSED GRADE STREAM BED EXISTING GRADE RIP-RAP BASIN DISSIPATOR W = 33 FT, L = 16 FT, DEPTH = 1.34 FT CLASS "B" (d50 = 8") 9' x 7' BOX CULVERT 9' x 7' BOX CULVERT GRAPHIC SCALE 1 inch = 30 ft. 30 0 15 30 60 SCALE: 1" = 50' HORIZ. 1" = 5' VERT. CULVERT DOWNSTREAMCULVERT UPSTREAM NTS TOP OF BANK RIP RAPTOP OF RIP RAP TO MATCH PRE-CONSTRUCTION STREAM CONTOUR RIPRAP APRON DETAIL IMPACT LEGEND PERMANENT WETLANDS TEMPORARY WETLANDS PERMANENT STREAM (NO FUNCTIONAL LOSS) PERMANENT STREAM (FUNCTIONAL LOSS) TEMPORARY STREAM No. Checked By Revision Designer Drawn By Date By Scale Date Job No. Sheet No.WithersRavenel Engineers [ Planners [ STrveyors 115 MacKenan Drive | Cary, NC 27511 t: 919.469.3340 | license #: F-1479 | www.withersravenel.com02180517.20 03/10/2022 AS NOTED APEX WAKE COUNTY NORTH CAROLINABM EB WR HUXLEY - HASSE AVENUE STREAM IMPACT MAP AREA 1 C SLOPE RIP-RAP AT 2:1 TO EXISTING IF PLAIN END WO (P I P E D I A M E T E R ) (N O M I N A L ) 1 3 2 : 1 2 : 1 2: 1 2: 1 2:1 LE V E L LB (LENGTH OF BASIN) LS (LENGTH OF POOL)LA (LENGTH OF APRON) WB ( W I D T H O F B A S I N ) DISSIPATOR POOL (HORIZONTAL FLOOR) S L O P E T O M A T C H E X I S T I N G C H A N N E L A T E N D O F A P R O N SLO P E T O M A T C H EXI S T I N G C H A N N E L AT E N D O F A P R O N RIP-RAP LINING SEE TABLE FOR SIZE AND DEPTH LEVEL LEVEL RIP-RAP TO EXISTING GRADE APRON INCISE PIPE FOR AQUATIC PASSAGE (SEE PLAN & TABLES FOR INVERT) TW (TAILWATER)YO YB LB (LENGTH OF BASIN) LS (LENGTH OF POOL)LA (LENGTH OF APRON) CHANNEL ELEVATION (PIPE INCISED) T 2 T1 T1 T1 RIP RAP THICKNESS T1 = 2d50 OR 1.5dMAX T2 = 3d50 OR 2 dMAX (SEE DIMENSION TABLE) GEOTEXTILE FABRIC (NCDOT STANDARD SPECIFICATION SECTION 1056-TYPE 2) END OF APRON TO CONFORM TO EXISTING STREAM CHANNEL (INCISE RIP-RAP TO MATCH EXISTING CROSS-SECTION) RIP RAP LINING SEE TABLE FOR SIZE AND DEPTH SEE PROFILE SEE PROFILE PLAN PROFILE 2 1 2 1 LEVEL INCISE PIPE FOR AQUATIC PASSAGE (SEE PLAN & TABLES FOR INVERT) RIP-RAP LINING SEE TABLE FOR SIZE AND DEPTH GEOTEXTILE FABRIC (NCDOT STANDARD SPECIFICATION SECTION 1056-TYPE 2) WO (PIPE DIAMETER) (NOMINAL) 2 1 2 1 2 1 21 hS (POOL DEPTH) PIPE BEYOND RIP-RAP LINING SEE TABLE FOR SIZE AND DEPTH GEOTEXTILE FABRIC (NCDOT STANDARD SPECIFICATION SECTION 1056-TYPE 2) WATER SURFACE PROFILE AT DESIGN FLOW 2 1 2 1 PIPE BEYOND RIP-RAP LINING SEE TABLE FOR SIZE AND DEPTH GEOTEXTILE FABRIC (NCDOT STANDARD SPECIFICATION SECTION 1056-TYPE 2) LEVEL APRON (LEVEL) PIPE BEYOND RIP-RAP LINING SEE TABLE FOR SIZE AND DEPTH GEOTEXTILE FABRIC (NCDOT STANDARD SPECIFICATION SECTION 1056-TYPE 2) WB (WIDTH OF BASIN) (AT END OF APRON) "A" "A""B""C""D" "B" "C" "D" SECTION "A-A" SECTION "B-B" SECTION "C-C" SECTION "D-D" END OF APRON TO CONFORM TO EXISTING STREAM CHANNEL (INCISE RIP-RAP TO MATCH EXISTING CROSS-SECTION) EXISTING GRADE EXISTING GRADE PROPOSED GRADE PROPOSED GRADE PROPOSED GRADE PROPOSED GRADE WATER SURFACE PROFILE AT DESIGN FLOW WATER SURFACE PROFILE AT DESIGN FLOW WATER SURFACE PROFILE AT DESIGN FLOW WATER SURFACE PROFILE AT DESIGN FLOW T 2 EXISTING STREAM CHANNEL BOTTOM T1 T1 T1 RIP-RAP BASIN ENERGY DISSIPATOR BASED ON HEC-14 NOT TO SCALE INVERT AT END OF PIPE (PIPE INCISED FOR AQUATIC PASSAGE) LEVEL hS (POOL DEPTH) No. Checked By Revision Designer Drawn By Date By Scale Date Job No. Sheet No.WithersRavenel Engineers [ Planners [ STrveyors 115 MacKenan Drive | Cary, NC 27511 t: 919.469.3340 | license #: C-0832 | www.withersravenel.com02180517.20 D03/10/2022 AS NOTED APEX WAKE COUNTY NORTH CAROLINABM EB WR HUXLEY - HASSE AVENUE RIP-RAP STILLING BASIN DETAILS OHE OHE OHE OHE 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 8'' W 8'' W TP TP TP T P T P T P TP TP TP TP 117 116 118 121 120 119 1 2 3 EXISTING WETALNDS (W8) 315 320 3 2 0 3 1 5 3 1 0 3 0 5 300 305 310 3 1 1 3 0 7 32 0 3 1 0 30 0 3 0 5 310 315 310 3 0 5 310 3 1 5 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W LIMIT OF DISTURBANCE HAS S E A V E N U E 60' P U B L I C R I G H T O F W A Y BM 2 0 2 0 , P G 1 3 3 4 IMPACT AREA W1 PERMANENT WETLAND IMPACT ROAD CROSSING AND GRADING 0.255 AC (11111 SF) GRAPHIC SCALE 1 inch = 50 ft. 50 0 25 50 100 IMPACT LEGEND PERMANENT WETLANDS TEMPORARY WETLANDS PERMANENT STREAM (NO FUNCTIONAL LOSS) PERMANENT STREAM (FUNCTIONAL LOSS) TEMPORARY STREAM No. Checked By Revision Designer Drawn By Date By Scale Date Job No. Sheet No.WithersRavenel Engineers [ Planners [ STrveyors 115 MacKenan Drive | Cary, NC 27511 t: 919.469.3340 | license #: F-1479 | www.withersravenel.com02180517.20 03/10/2022 AS NOTED APEX WAKE COUNTY NORTH CAROLINABM EB WR HUXLEY - HASSE AVENUE WETLAND IMPACT MAP AREA 2 E S S S S S S S S S S FO B C C FO B FOB CFOB W W W W W W W W W W X X E EFOB C C E EFOB FOB CEFOB © 2022 Microsoft Corporation © 2022 TomTom VICINITY MAPVICINITY MAP 1"=5000' MAP G SITE GRAPHIC SCALE 1 inch = 300 ft. 300 0 150 300 600 HAS S E A V E N U E O L I V E C H A P E L R O A D ( S R 1 1 6 0 ) V A R I A B L E W I D T H P U B L I C R O W HAS S E A V E N U E No. Checked By Revision Designer Drawn By Date By Scale Date Job No. Sheet No.WithersRavenel Engineers [ Planners [ STrveyors 115 MacKenan Drive | Cary, NC 27511 t: 919.469.3340 | license #: F-1479 | www.withersravenel.com02180517.20 03/10/2022 AS NOTED APEX WAKE COUNTY NORTH CAROLINABM EB WR HUXLEY - HASSE AVENUE OVERALL BUFFER IMPACT MAP F IMPACT AREA 3 W W W W W W W W W W S S W W W W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W TPTP T P TP TP TP TP TP TP TP TP TP TP T P TP TP T P TP X X X X X X X X X X X X X X X X 2 6 5 26 6 . 0 265 270 2 7 5 2 7 0 26 5 2 6 0 26 1 . 0 CULVERT ACCESS & MAINTENANCE EASEMENT TOP OF BANK STREAM SEDIMENT BAG FLEXIBLE HOSE UPSTREAM TEMPORARY COFFER DAM RIP-RAP STILLING BASIN (SEE DETAIL SHEET D) LIMIT OF DISTURBANCE LIMIT OF DISTURBANCE CULVERT ACCESS & MAINTENANCE EASEMENT TOP OF BANK 50' TOWN OF APEX BUFFER 50' TOWN OF APEX BUFFER 50' TOWN OF APEX BUFFER 50' TOWN OF APEX BUFFER 9' x 7 ' B O X C U L V E R T TEMPORARY PUMP AROUND HAS S E A V E N U E 60' P U B L I C R I G H T O F W A Y BM 2 0 2 0 , P G 1 3 3 4 EXISTING 1% ANNUAL FLOOD ZONE (ZONE AE) DOWNSTREAM TEMPORARY COFFER DAM GRAPHIC SCALE 1 inch = 50 ft. 50 0 25 50 100 No. Checked By Revision Designer Drawn By Date By Scale Date Job No. Sheet No.WithersRavenel Engineers [ Planners [ STrveyors 115 MacKenan Drive | Cary, NC 27511 t: 919.469.3340 | license #: F-1479 | www.withersravenel.com02180517.20 03/10/2022 AS NOTED APEX WAKE COUNTY NORTH CAROLINABM EB WR HUXLEY - HASSE AVENUE BUFFER IMPACT MAP AREA 3 G IMPACT B1 TEMPORARY BUFFER IMPACT STREAM BYPASS GRADING AND ROAD CROSSING GRADING ZONE 1 = 7,310 SF (0.168 AC) ZONE 2 = 4,565 SF (0.105 AC) IMPACT LEGEND PERMANENT ZONE 1 TOWN OF APEX 30' BUFFER PERMANENT ZONE 2 TOWN OF APEX 50' BUFFER