Loading...
HomeMy WebLinkAbout20171507 Ver 3_More Information Received_20220630 (11)Strickland, Bev From: Robert Patterson <RobertPatterson@apexnc.org> Sent: Friday, June 24, 2022 3:33 PM To: Mayo, Ben Cc: Jessica Bolin Subject: RE: Huxley Attachments: image001.png Ben —Just got your message. For the easement, a 10' offset from the walls and energy dissipator should suffice. Thanks. Robert Patterson, PE OW Sr. Engineer I Stormwater APEXTown of Apex, NC (919) 249-1166 NORTH CAROLINA www.apexnc.org f► Please note that email sent to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Robert Patterson <> Sent: Friday, June 24, 2022 12:49 PM To: bmayo@withersravenel.com Cc: Jessica Bolin <Jessica.Bolin@apexnc.org> Subject: Huxley Ben — Nice speaking with you this morning. Here are the two items I needed to get back with you on: 1. A spillway in the dam is not required if the riser is sized to handle the 100-yr event. However, we do recommend a spillway be provided in the event the riser clogs. 2. As currently shown, the public DE shown for the box culvert under Hasse Ave. does not allow for adequate space for future maintenance. Please provide a larger easement that will provide space for equipment access, similar to that shown for the culvert under Water Tower Ln. As you stated, DIMS is not currently accepting mitigation payments in the Lower New Hope watershed, but there are other mitigation options available in Sect. 6.1.14.0 of the UDO. We cannot deviate from the needed easement size only based on the lack of one type of mitigation available. Please let us know if you want to discuss further. Thanks. Robert Patterson, PE Sr. Engineer I Stormwater APEXTown of Apex, NC (919) 249-1166 NORTH CAROLINA www.apexnc.oM 1 Please note that email sent to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties.