HomeMy WebLinkAbout20141249 Ver 1_401 Application_201412140 v STEWART W *trf Z•]31:LL` &IL)AwfA TO FROM 2 01 41 248 NCDWQ, WBSCP Unit Jamie Carpenter, PE 512 North Salisbury Street Land Planning Project Manager Raleigh, NC 27604 704.334 7925 x(316) 1 6, P A DATE SENT VIA 12 -04 -2014 UPS Ground PROJECT NUMBER PROJECT NAME X14019 Huntington Park Subdivision COPIES DATE DESCRIPTION 5 12 -03 -14 PCN Forms 5 11 -25 -14 Construction Plans 1 12 -03 -14 Check in the amount of 240 00 Approved as submitted Returned after review COMMENTS SIGNED Jamie arpenter, PE COPIED TO File 200 S COLLEGE ST CHARLOTTE, NC T 704 334 7925 SUITE 720 28202 F 704 334 7926 For approval ❑ For review & comment E Returned for corrections For your use Ej Approved as submitted Returned after review As requested ❑ Approved as noted Resubmit copies for approval COMMENTS SIGNED Jamie arpenter, PE COPIED TO File 200 S COLLEGE ST CHARLOTTE, NC T 704 334 7925 SUITE 720 28202 F 704 334 7926 1�\�aF wn rERQG o -< Office Use Only Q� Corps action ID no DWQ project no Form Version 1 4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 i n r :s 3 Pre - Construction Notification (PCN) Form 2 0 1 4 1 2 4 A. Applicant Information 1. Processing la Type(s) of approval sought from the Corps, ❑X Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number. 3 or General Permit (GP) number, 1c Has the NWP or GP number been verified by the Corps? ❑ Yes ❑X No 1 d Type(s) of approval sought from the DWQ (check all that apply). ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑X 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification* ❑ Yes © No For the record only for Corps Permit. ❑ Yes ® No 1f Is payment Into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program ❑ Yes ❑X No 1g Is the project located in any of NC's twenty coastal counties If yes, answer 1h below ❑ Yes ❑X No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes © No 2. Project Information 2a Name of project, Huntington Park Subdivision 2b County Mecklenburg 2c Nearest municipality / town Charlotte 2d Subdivision name. Huntington Park Subdivision 2e NCDOT only, T I P or state project no N/A 3. Owner Information 3a. Name(s) on Recorded Deed 1031 HPD, LLC , 3b. Deed Book and Page No 27283 -072 3c Responsible Party (for LLC if applicable). W Charles Campbell DEC 0 5 2014 3d. Street address. 1031 Huntington Park Drive DENR - WATEV 3e City, state, zip FER PERMITTI Charlotte, NC, 28211 3f Telephone no. 704 -971 -4894 3g Fax no.. 704- 367 -0196 3h Email address- charles @brackettflagship corn Page 1 of 10 PCN Form — Version 1.4 January 2009 i n r :s 3 4. Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other, specify 4b. Name 4c Business name (if applicable)* 4d Street address 4e City, state, zip, 4f Telephone no 4g Fax no 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a Name James Carpenter, PE 5b Business name (if applicable), Stewart, Inc 5c Street address 200 S College Street, Suite 720 5d City, state, zip Charlotte, NC 28202 5e Telephone no. 704 - 909 -3516 5f Fax no 704- 334 -7926 5g. Email address jarpenter@stewartinc com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a Property identification no (tax PIN or parcel ID) 18308108 1b Site coordinates (in decimal degrees). I Latitude 35 16299 Longitude 80 80795 1c Property size 5.49 acres 2. Surface Waters 2a Name of nearest body of water to proposed project McMullen Creek 2b Water Quality Classification of nearest receiving water C (Index No. 11- 137 -9 -5) 2c River basin Catawba 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Site is a dead end residential street with an existing 24" RCP driveway pipe General land use Is single family residential 3b. List the total estimated acreage of all existing wetlands on the property, 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 694 3d Explain the purpose of the proposed project To subdivide an existing parcel into two lots To create a cul -de -sac and improve associated storm drainage system 3e Describe the overall project in detail, Including the type of equipment to be used. 24" RCP will be replaced with a 48" system to convey storm water under a new cul -de -sac A track hoe will be used to excavate trench and place pipe 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes 0 No ❑ Unknown Comments 4b If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c If yes, who delineated the jurisdictional areas? Name (if known) Agency /Consultant Company Other 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5. Project History 5a Have permits or certifications been requested or obtained for this project (including all pnor phases) in the past? ❑ Yes ❑ No ❑X Unknown 5b If yes, explain in detail according to "help file" instructions 6. Future Project Plans 6a Is this a phased project? ❑ Yes ❑X No 6b If yes, explain Page 3 of 10 PCN Form — Version 1 4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ❑ Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a Wetland impact number Permanent (P) or Temporary 2b Type of impact 2c Type of wetland 2d Forested 2e Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f Area of impact (acres) W1 Choose one Choose one Yes /No - W2 Choose one Choose one Yes /No - W3 Choose one Choose one Yes /No W4 Choose one Choose one Yes /No - W5 - Choose one Choose one Yes /No - W6 - Choose one Choose one Yes /No 2g Total Wetland Impacts: 2h Comments 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f Average stream width (feet) 3g Impact length (linear feet) S1 T Excavation UT to McMullen Tnb INT DWQ 2 35 S2 P Culvert UT to McMullen Tnb INT DWQ 2 88 S3 - Choose one - S4 - Choose one - - S5 - Choose one - S6 - Choose one - - 3h Total stream and tributary Impacts 123 31 Comments Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then indiv ually list all open water impacts below 4a. Open water impact number Permanent (P) or Temporary 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 Choose one Choose O2 Choose one Choose 03 Choose one Choose 04 - Choose one Choose 4f. Total open water Impacts 4g Comments 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a Pond ID number 5b Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f Total: 5g. Comments. 5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no. 51 Expected pond surface area (acres) 5) Size of pond watershed (acres) 5k Method of construction 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a. Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other 6b. Buffer Impact number — Permanent (P) or Temporary 6c Reason for impact 6d Stream name 6e Buffer mitigation required? 6f Zone 1 impact (square feet ) 6g Zone 2 impact (square feet 61 Yes/No B2 - Yes/No B3 - Yes /No B4 - Yes /No B5 - Yes/No B6 - Yes /No 6h. Total Buffer Impacts: 61 Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed Impacts in designing project The length of the proposed pipe was designed to be the minimum length needed to convey the storm water through the proposed cul -de -sac A headwall and tallwall was used to minimize grading impacts lb Specifically describe measures taken to avoid or minimize the proposed Impacts through construction techniques The Inlet location of the proposed storm drainage system will be built slightly off -line from the channel as grading is not allowed on the adjacent property This will allow a bypass pipe to be Installed utilizing the existing inlet point of the existing 24" RCP The outlet of the bypass pipe will discharge on the proposed nprap apron built In the existing channel bed After the headwall Is Installed, minimal grading will be required to fill for the shoulder of the proposed cul -de -sac and divert the channel flo through the headwall. Rlprap stabilization will be used to prevent scour at the headwall 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S. or Waters of the State2 ❑ Yes Q No 2b If yes, mitigation Is required by (check all that apply) ❑ DWQ ❑ Corps 2c if yes, which mitigation option will be used for this project'? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a Name of Mitigation Bank* 3b Credits Purchased (attach receipt and letter) Type Choose one Type Choose one Type. Choose one Quantity Quantity Quantity 3c Comments 4. Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from In -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature Choose one 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non- nparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 1 4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? El Yes PX No 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f Total buffer mitigation required: 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la Does the project include or Is It adjacent to protected riparian buffers identified ❑ Yes ❑X No within one of the NC Riparian Buffer Protection Rules? lb If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a What Is the overall percent Imperviousness of this project? 23 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑X No 2c If this project DOES NOT require a Stormwater Management Plan, explain why The protect will result in less than 24% impervious area 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan 2e Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? Charlotte, NC ❑X Phase II ❑ NSW 3b Which of the following locally - implemented stormwater management programs USMP apply (check all that apply). a Water Supply Watershed ❑ Other, 3c Has the approved Stormwater Management Plan with proof of approval been El Yes ❑X No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state - Implemented stormwater management programs apply ORW (check all that apply). H Session Law 2006 -246 [:]Other 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached? 5. DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑X Yes ❑ No Page 8 of 10 PCN Form — Version 1 4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes X❑ No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter) Comments. 2. Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application? 1:1 Yes ❑X No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑Yes ❑X No additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description 4. Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility The existing home on the site currently disposes of its wastewater through an existing sanitary sewer lateral to a Charlotte - Mecklenburg Utility Department (CMUD) gravity sewer main The proposed lotthome will also dispose of its wastewater through a proposed sanitary sewer lateral to a CMUD gravity sewer main and ultimate treatment at the McMullen Creek wastewater treatment plant Page 9 of 10 PCN Form —Version 1.4 January 2009 S. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ❑X No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes X❑ No impacts? 5c If yes, Indicate the USFWS Field Office you have contacted - 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS Critical Habitat 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? USFWS 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes X❑ No status (e g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? NC State Historic Preservation Office 8. Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes Q No 8b If yes, explain how project meets FEMA requirements. 8c What source(s) did you use to make the floodplain determination? FIRM Community Panel No 3710455100J dated March 02, 2009 W. CHARuss 64.4P6trc-c- Appllcant/Agent's Printed Name Date App ant/Agent's Signature (Agent's signature is valid only if an authorzation letter from the a licant is provided Page 10 of 10