HomeMy WebLinkAbout20221490 Ver 1_P22044-DOHM PCN SESC Pln Ltr of Approval_20221026ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Enylranmental Quality
September 13, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
Door of Hope Ministry, Inc.
ATTN: Mr. Jason L. Schlabach
P.O. Box 321
Lynn, NC 28750
RE: Project Name: DOOR OF HOPE - PHASE 1
Acres Approved: 9.00
Project ID: POLK-2022-021
County: Polk
City: Mills Spring
Address: Pea Ridge Rd.
River Basin: Broad
Stream Classification: Wheat Creek - Class C
Submitted By: Brooks Engineering Associates - Mr. John Kinnaird, PE
Date Received by LQS: June 9, 2022
Date Revision Received by LQS: August 3, 2022
Date Revision Received by LQS: August 29, 2022
Plan Type: Commercial
Dear Mr. Schlabach,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications. The Modifications Required for Approval are listed on the attached page.
This plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under
the NCGO10000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is received, you will receive the COC via email. You MUST obtain the COC prior
to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc,gov/NCG01. Please direct questions about the eNOI form to Paul Clark at
Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the
new responsible party is required to apply for his/her own COC.
D� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
cx,: -ofAsheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
rvaHrH cuauru
�noir. � mpwnry 828.296A500
Letter of Approval with Modification
Door of Hope Ministry, Inc.
September 13, 2022
Page 2 of 4
Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following
the commencement of this project, it is determined that the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control
Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules. In addition, local city or county
ordinances or rules may also apply to this land -disturbing activity. This approval does not
supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved acres.
Exceeding the acreage will be a violation of this permit and would require a revised plan
and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,, J 4
Wtt�
red Walker, P.E.
Express Engineer
Division of Energy, Mineral, and Land Resources
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
Modifications
Letter of Approval with Modification
Door of Hope Ministry, Inc.
September 13, 2022
Page 3 of 4
ec: Mr. John Kinnaird, PE fikinnaird@brooksea.com)
Ms. Shawna Riddle - NCDEQ-LQS (shawna.riddle@ncdenr.gov)
Mr. Landon Davidson, PG - NCDEQ-DWR (landon.davidson@ncdenr.gov)
Mr. Andrew Moore, PG - NCDEQ-DWR (andrew.w.moore ncdenr, ov)
cc: Regional Office file
Letter of Approval with Modification
Door of Hope Ministry, Inc.
September 13, 2022
Page 4 of 4
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: DOOR OF HOPE -- PHASE 1
Project ID: POLK-2022-021
County: Polk
For final plan approval please provide to this office the requested documents listed below.
1. Provide phasing to the construction sequencing that limits the extent and duration
of land disturbing activities. [15A NCAC 04B .0106(a)(2)]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
O-Z ; n w rb y I
CD
CD
CD
►�
n o
n
W I CD n C `r.
CD CD
SD
n
OW
IrD�, r<�ZEAxys1�
4 []
O n
e--N CD
4�1 CD OW
CD
O.W.
�-q 0
rL
ti n O
O
CL
N ` g
Or� CD c .
CL