HomeMy WebLinkAbout20141235 Ver 1_401 Application_20141214ICA=
Chris Adams, AIA
PO Box 519
105 Cromartie Road
Elizabethtown, NC 28337
phone 919 - 818 -3894
www chnsadamsarchitect com
chrns @chnsadamsarchitect com
TRANSMITTAL
Date November 24, 2014
To. NC DWQ, WBSCP Unit
1650 Mail Service Center
Raleigh, NC 27699 -1650
Project 410 Water Quality Certification request
Project address: 47 Huntington Place, Holt Lake, Smithfield, NC
For Willie Earl Wall (property owner / applicant)
228 Tyler Drive
Smithfield, NC 27577
Phone 919 - 938 -3888 or 919- 669 -8200
Email willie .wall@rapidresponseelectricnc .com
Attached 5 copies of signed PCN Form
5 copies of drawing attachments, 11x17 format
1 check for $240 (fee for minor water quality application
Message Please contact me or the owner (Willie Earl Wall, listed above) with any
questions. Thanks very much.
From Chris Adams, AIA
cc: Willie Earl Wall
P1 of 1
Member of American Institute of Architects
LEED Accredited Professional
Licensed architect in North Carolina, Tennessee, and Maryland
� OF WATF9
O� �G
IQQ19 0
G
2 0 1 4 1 2 3 5
10
CVO ac no
°f�tiV(3- proleetoao�
Form Version 14 January 2009
Page 1 of 10
PCN Form — Version 1 4 January 2009
Pre- Construction Notification (PCN) Form
A.
Applicant Information
1.
Processing
la
Type(s) of approval sought from the Corps
I ❑X Section 404 Permit ❑ Section 10 Permit
1 b Specify Nationwide Permit (NWP) number 18 or General Permit (GP) number
1c
Has the NWP or GP number been verified by the Corps?
X❑ Yes ❑ No
1 d
Type (s) of approval sought from the DWQ (check all that apply)
401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
le
Is this notification solely for the record
because wntten approval is not required
NO
For the record only for DWQ
401, Certification
❑ Yes ❑X No
For the record only for Corps Permit
❑ Yes ❑X No
if
Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts > If so, attach the acceptance, letter from mitigation bank
or in -lieu fee program
❑ Yes ❑X No
1 g
Is the project located in any of NC's twenty coastal, counties If yes, answer 1 h
below
❑ Yes ® No
1 h' Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes ❑X No
2.
Project Information
2a
Name of project
Home Site
2b
County
Johnston
2c
Nearest municipality / town
Smithfield
2d
Subdivision name
Cypress Point Subdivision
2e
NCDOT only, T I P or state project no
NA
3.
Owner Information
3a
Name(s) on Recorded Deed
Rapid Response Electric, Inc
3b
Deed Book and Page No
deed book 04435, page 0147
3c
Responsible Party (for LLC if
applicable)
Willie Wall
3d
Street address
228 Tyler Drive
3e
City, state, zip
Smithfield, NC 27$77
3f
Telephone no
919- 938 -3888 / 919 -669 -8200
3g
Fax no
NA
3h
Email address
wilhe wall @rapidresponseelectricnc com
Page 1 of 10
PCN Form — Version 1 4 January 2009
4.
Applicant Information (if different from owner)
4a
Applicant is
❑ Agent XQ Other, specify Property Owner
4b
Name
Willie Earl Wall
4c
Business name
(if applicable)
Rapid Response Electric Inc
4d
Street address
228 Tyler Drive
4e
City, state, zip
Smithfield, NC 27577
4f
Telephone no
919 -669 -8200
4g
Fax no
N/A
4h
Emad address
willie wall @rapidresponseelectricnc corn
5.
Agent/Consultant Information (if applicable)
5a
Name
N/A
5b
Business name
(if applicable)
N/A
5c
Street address
N/A
5d
City,, state, zip
N/A
5e
Telephone no
N/A
5f
Fax no
N/A
5g
Email address
N/A
Page 2 of 10
B.
Project Information and Prior Project History
1.
Property Identification
1a.
Property Identification no (tax PIN or parcel ID)
167212 -76 -5269 151100360
1 b
Site coordinates (in decimal degrees)
Latitude 35.4lag g Longitude —7&'40L41a2.
1c
Property size
08 acres
2.
1
Surface Waters
2a
Name of nearest body of water to proposed project
Black Creek (Holt Lake)
2b
Water Quality Classification of nearest receiving water
B, NSW
2c
River basin
Neuse (subbasin NEU04)
3.
Project Description
3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application - rh;g po,rccI C-urreo+ly vn,rnpnavcd, 2xCeP+- - fora-docic ('fo he �rrr,ol�se��
and ie-. rip rc. p 6,/Khea d (fo be. rcpla.ed e ;-Vk r. fvM ber jo�lKjteac(�, Fj!( ofAer
Surrooncl, nSs pc rce-(5 c-re- s %ogle -- . 5;+,c he-5 hen by Frev,�cvS
/"-/% cJ n e-r5 re s u 14 l, d 4L✓1 d -1-re-e-,< ,' h ' C, J �
3b
Llst,the total estimated acreage of all existing wetlands on the property 0 1
3c
List1the total estimated linear feet of all existing streams (intermittent and perennial) on the property 0
3d Explain the purpose of the proposed project
The proposed project consists of a single -family residence, a new boathouse / dock, a new timber bulkhead, and other site improvements
t
3e Describe the overall project in detail, including the type of equipment to be used l),, c_ -/v f ur %rc) SEuri�S�
V✓1G.ivle. �-o acc-ess (of- Vic, u-)e-�r. Pro 05e. 4e, uf,l;tie - fra -ck- be.c4cha,e. clurim5
'dCaA.Ucjowo 4-0 re -riove de-b6-5 --o f�c;l,l;--fe r^ecrec {;o� bo-a� cCcess ale/1 [✓,��
4.
Jurisdictional Determinations
4a
Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
❑ Yes ❑ No ❑X Unknown
Comments
4b
If the Corps made the jurisdictional determination, what type
of determination was made?
❑ preliminary ❑ Final
4c
If yes, who delineated the jurisdictional areas?
Name (if known)
Agency /Consultant Company
Other
4d
N/A
If yes, list the dates of the Corps jurisdictional determinabons or State determinations and attach documentation
5.
Project History
5a
Have permits or certifications been requested or obtained fo
this r
;project (including all prior phases) in the past
El Yes ❑X No ❑Unknown
5b
N/A
If yes, explain in detail according to "help file" instructions
I
I
6.
Future Project Plans
6a
is this a phased project?
❑ Yes ® No
6b
NIA
If yes, explain
Page 3 of 10
PCN Form - Version 14 January 2009
I
C. Proposed Impacts Inventory
1. Impacts Summary
1 a Which sections were completed below for your project (check all that apply)
1
Q Wetlands ❑ Streams — tributaries ❑X Buffers Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted
2a.
2b
2c
2d
2e
2f
Wetland impact
Type of impact
Type of wetland
Forested
Type of jurisdiction
Area of
number
Corps (404,10) or
impact
Permanent (P) or
DWQ (401, other)
(acres)
Tempo I ra
W1 P
Excavation
Unknown
No
Corps
01
W2 i
Yes /No
W3 i
Yes/No
-
W4 I
Yes/No
-
W5 I
Yes/No
-
W6
Yes/No
-
2g Total Wetland Impacts:
2h Comments
The area affected will be lake bottom excavation to remove buned trees and stumps The goal is to create necessary depth for access to new boat
house and pier
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
questlori for all stream sites impacted
3a i
3b
3c
3d
3e
3f
3g
Stream impact
Type of impact
Stream name
Perennial (PER) or
Type of
Average
Impact
number
intermittent (INT)?
jurisdiction
stream
length
Permanent (P) or
width
(linear
Temporary (T)
(feet)
feet)
S1
Choose one
-
-
S2
S3
S4
S5
S6
3h Total stream and tributary impacts
31 Comments
No Stream impacts
I
Page 4 of 10
PCN Form —Version 1 4 January 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U S Ithen indiv ually list all open water impacts below
4a
Open water
impact! number
Permanent (P) or
em ora
Tempo,
4b
Name of waterbody
(if applicable)
4c
Type of impact
4d
Waterbody
type
4e
Area of impact (acres)
01 P
Holt Lake
Excavation
Lake
01
02
03
04 i
4f Total open water impacts
4g Comments NO upen Water impacts
I
S. Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below
5a
Pond ID number
5b
Proposed use or
purpose of pond
5c
Wetland Impacts (acres)
5d
Stream Impacts (feet)
5e
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Pi
Other
01
P2
Choose one
5f Total:
5g Comments Excavation to install boathouse and pier Material removed will be loaded and hauled off site to proper landfill location
5h Is a dam high hazard permit required?
❑ Yes ❑X No If yes, permit ID no
51 Expected pond surface area (acres)
5l Size of pond watershed (acres)
5k_ Method of construction
Track Backhoe to remove lake bottom material
6. Buffer Impacts (for DWQ)
If project will Impact a protected riparian buffer, then complete the chart below If yes, then Individually list all buffer Impacts
below If any impacts require mitigation, then you MUST fill out Section D of this form
6a. Project Is In which protected basin?
❑X Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other
6b (
Buffe Impact
number —
Permanent (P) or
Temporary T
6c
Reason for Impact
6d
Stream name
6e
Buffer
mitigation
required?
6f
Zone 1
Impact
(square
feet )
6g
Zone 2
Impact
(square
feet
B1 P
Walkway to boathouse
Holt Lake
No
40
0
B2 P
Bulkhead
Holt Lake
No
B3 P
Home
Holt Lake
No
0
0
84 P
LandscapinglHardscapmg
Holt Lake
No
0
1,660
B5 i
B6
6h Total Buffer Impacts:
61 Comments Existing nprap is replaced by bulkhead
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
la Specifically describe measures taken to avoid or minimize the proposed Impacts In designing project
Multiple desired home designs were extracted from our plans to get one that works vrithm the available space between the septic field and the riparian
buffer zones We've redesigned landscaping and hardscapes several times to minimize intrusion in zone two of the riparian buffer
f
lb Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques
We've moved the boathouse site to an area where impact area is minimized to 10 acre Utilizing track backhoe while lake is drawn down All
excavated material will be hauled away to appropriate land fill
i
i
I
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a Does the project require Compensatory Mitigation for
Impacts to Waters of the U S or Waters of the State?
❑ Yes No
2b If Yes, mitigation Is required by (check all that apply)
❑ DWQ ❑ Corps
2c If yes, which mitigation option will be used for this
projI ct?
❑ Mitigation bank
El Payment to In -lieu fee program
❑ Permlttee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a Name of Mitigation Bank- N/A
3b Credits Purchased (attach receipt and letter)
Type
Type
Type
Quantity
Quantity
Quantity
3c Comments
4. Complete if.Making a Payment to In -lieu Fee Program
4a Approval letter from In -lieu fee program Is attached
❑ Yes
4b Stream mitigation requested
linear feet
4c If using stream mitigation, stream temperature
Choose one
4d Buffer mitigation requested (DWQ only)
square feet
4e Ripanan wetland mitigation requested
acres
4f None npanan wetland mitigation requested
acres
4g Coastal (tidal) wetland mitigation requested
acres
4h Comments
5. Complete if Using a Perrnittee Responsible Mitigation Plan
5a If using a permlttee responsible mitigation plan, provide a description of the proposed mitigation plan
Page 6 of 10
PCN Form — Version 14 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a Will the project result in an impact within a protected riparian buffer that requires
E] Yes No
buffer mitigation?
6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
6c
6d
6e
Zone'
Reason for impact
Total impact
Multiplier
Required mitigation
(square feet)
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2 1
i
1 5
1
6f Total buffer mitigation required:
6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund)
6h Comments
I
Page 7 of 10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
9
1a Does the project Include or Is it adjacent to protected riparian buffers Identified
� Yes ❑ No
within one of the NC Riparian Buffer Protection Rules?
1 b If yes, then is a diffuse flow plan included? If no, explain why
Single Family Dwelling to be build on residential lot adjacent to protected riparian buffer
I
I
I
❑ Yes ❑X No
2. Stormwater Management Plan
2a What is the overall percent Imperviousness of this project?
0
2b Does this project require a Stormwater Management Plan?
❑ Yes E9 No
2c If th I project DOES NOT require a Stormwater Management Plan, explain why
A boathouse is to be constructed in lake area Bulkhead to be constructed for erosion protection Single family dwelling construction on residential
lot adtaceInt to riparian buffer zone
2d If thi i s project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan
N/A
I�
I
i
2e Who will be responsible for the review of the Stormwater Management Plan?
N/A
3. Certified Local Government Stormwater Review
3a In which local government's jurisdiction Is this project?
Johnston County
❑ Phase II
3b Which of the following locally- implemented stormwater management programs
❑NSW
❑ USMP
apply (check all that apply)
❑ Water Supply Watershed
® Other NIA
3c Has the approved Stormwater Management Plan with proof of approval been
El Yes ❑X No
attached?
4. DWQ Stormwater Program Review
❑Coastal counties
❑HQW
4a Which of the following state - implemented stormwater management programs apply
❑ORW
(check all that apply)
❑Session Law 2006 -246
®Other N/A
4b Has the approved Stormwater Management Plan with proof of approval been
❑Yes ❑X No
attached?
1
5. DWQ 401 Unit Stormwater Review
5a Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
515 Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form —Version 1 4 January 2009
F.
Supplementary Information
1.
Environmental Documentation (DWQ Requirement)
1 a
Does the project involve an expenditure of public (federal /state /local) funds or the
Yes
QX No
use of public (federal /state) land
lb
If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑Yes
❑x No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c
If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
❑ Yes
❑X No
letteIr)
Comments
2.
Violations (DWQ Requirement)
2a
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated
Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards,
E] Yes
OX No
or Riparian Buffer Rules (15A NCAC 2B 0200)?
2b
Is this an after - the -fact permit application'?
El Yes
OX No
2c
If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s)
I
3.
Cumulative Impacts (DWQ Requirement)
3a
Will this project (based on past and reasonably anticipated future impacts) result in
El Yes
QX No
additional development, which oould impact nearby downstream water quality?
3b
If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy If you answered "no," provide a short narrative description
4.
Sewage Disposal (DWQ Requirement)
4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility
N/A
i
Page 9 of 10
PCN Form —Version 1 4 January 2009
i
6. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a Will this project occur in or near an area with federally protected species or
❑ Yes ® No
habitat?
I
5b Have you checked with the USFWS concerning Endangered Species Act
Yes ❑ No
Impacts?
i
5c If yes, indicate the USFWS Field Office you have contacted
5C- Raleigh
5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
Inquired with the local department in Johnston County
6. Essential Fish Habitat (Corps Requirement)
6a Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ❑X No
6b What data sources did you use to determine whether your site would impact Essential Fish Habitat?
Checked with Jean Gibby regarding this and determined there will be no impact
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
❑ Yes ❑X No
status (e g , National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b What data sources did you use to determine whether your site would impact historic or archeological resources?
Checked with Jean Gibby regarding this and determined there will be no impact
8. Flood Zone Designation (Corps Requirement)
8a Will this project occur in a FEMA - designated 100 -year floodplain?
❑Yes ❑ No
8b If yes, explain how project meets FEMA requirements
Project should not negatively impact the 100 year flood plain as proposed involves excavation only All excavated material will be hauled off site and
disposed of in an approved location
8c What source(s) did you use to make the floodplain determination?
My survey when I purchased this property
I
' Willie Earl Wall
11/412014
Applicant/Agent's Printed Name
Applicant/Agent's Signature
Date
I
(Agent's signature is valid only if an authorization
letter from the applicant is provided
Page 10 of 10
n
/
,h
LOT 5 - CYPRESS POINT SUBDIVISION
34,685 SF (0 8 ACRE)
(THIS PROPERTY IS A RESIDENTIAL BUILDING LOT,
AND IS CURRENTLY UNIMPROVED
EXCEPT FOR THE EXISTING DOCK)
NOTES
1 Property Information is based on "Final Plat for Cypress Point
Subdivision" Issued by Southern Surveying & Mapping, Inc on
03- 0,1 -91
2 Locations of water line, existing rip -rap, and existing dock are based
on as -built measurements and observations from July, 2014
STING OVERALL SITE PLAN
0' 15' 30' 60'
I
EXISTING ORDINARY HIGH WATER LINE
m
S
VV, EXISTING ORDINARY HIGH WATER LINE
HATCHING INDICATES EXISTING RIPRAP
AND OVERGROWN VEGETATION TO BE REMOVED
(TO BE REPLACED WITH TIMBER'BULKHEAD
WATER SIDE OF NEW BULKHEAD
TO ALIGN WITH EXISTING
ORDINARY HIGH WATER LINE
SEE SHEETS A -0 1 AND A -0 2)
HOLT LAKE
\
/n 4
(�; /7n 1T,n�r� -, y�y�v
V-1l117' / y� ZI
a EXISTING DOCK TO BE DEMOLISHED
V
EXISTING ORDINARY HIGH WATER LINE
PORTION OF PROPERTY IN
FEMA 100 YEAR FLOODPLAIN
�!A
Chris Adams; AIA
105 Cromartie Road
P O Box 519
Elizabethtown, NC 28337
919.818 3894
www.chdsadamsarchitect com
chns @chnsadamsarchitect com
02N�R' GHr�F�y�toO'ir
w
a: 'a
NOT for
Construction
Issued for
DWQ Review Only
Residence
for Willie Wall
47 Huntington Place
Holt Lake
Smithfield, NC
A -0.0
EXISTING
SITE PLAN
c
°z
'M
NORTH
i
I �
I A
I /
I /
I
l / i
i
i
m
X/I 1 m\
a, 1� o•s£Pryc / �
m
`£� PROPOS D I
�o S PT1C HOUSE
FIE FINISHED FLOUIR O
EA' ABOVE FOL000
ELEVATION III
P
cONOREr f
1 i
A SEE ENLARGED PLAN A -0.2
.I
II
NEW TIMBER BULKHEAD.
II WATER SIDE OF NEW BULKHEAD
� FWq y I 0
._I_ -�
`FEIAAiL00t7Vim— �yP/Ewpy
NOTES:
1. Property information is based on "Final Plat for Cypress Point X98 12,
Subdivision" issued by Southern Surveying & Mapping, Inc. on
03- 01 -91. r p
2. Locations of water line, existing rip -rap, and existing dock are based m 6
on as -built measurements and observations from July, 2014. ZIz � _
m 9
I Z�
OVERALL PROPOSED SITE PLAN I m'
1
IMM
0' 15' 30' 60'
8
m
D
m
ImT
1 D
I
L
1
1
TO ALIGN WITH EXISTING
ORDINARY HIGH WATER LINE.
NOTE: NO FILLING OR GRADING IS
PROPOSED BELOW THE LEVEL OF THE
EXISTING ORDINARY HIGH WATER LINE.
\ \\ \ \ \\ \\ \
\ \\ \ \ \ \ \ \\
\\ \\ \ \ \ \\ \\ \\
\ \ \ \ \ \\ \\ \
�IA
Chris Adams, AIA
105 Cromartie Road
P.O. Box 519
Elizabethtown, NC 28337
919.818.3894
www.chrisadamsarchitect.com
chris@chrisadamsarchitect.com
Gt;r�F�
co
��
2 CJ , t7 n1 3
M ; a 74 ¢
., y �RrN C AR�\' GP- Z
PROPOSED NEW BOATHOUSE / DOCK
MAXIMUM 4,000 SF DISTURBED AREA
FOR BOATHOUSE CONSTRUCTION
NEW RIPRAP BETWEEN END OF
NEW TIMBER BULKHEAD AND PROPERTY LINE.
EXISTING ORDINARY HIGH WATER LINE TO REMAIN
IN CURRENT LOCATION.
NOT for
Construction
Issued for
DWQ Review Only
Residence
for Willie Wall
47 Huntington Place
Holt Lake
Smithfield, NC
date # revision
10.28.14 1 DWQ - Review Only
11 -18-14 2 DWQ Submittal
A -0.1
OVERALL PROPOSED
SITE PLAN
NEW TIMBER BULKHEAD. MAXIMUM 4,000 SF DISTURBED AREA
EXISTING ORDINARY HIGH WATER LINE WATER SIDE OF NEW BULKHEAD FOR BOATHOUSE CONSTRUCTION.
TO ALIGN WITH EXISTING SEE DRAWING A -0.1
ORDINARY HIGH WATER LINE.
NOTE'. NO FILLING OR GRADING IS
PROPOSED BELOW THE LEVEL OF THE PROPOSED NEW DOCK
EXISTING ORDINARY HIGH WATER LINE. SEE DRAWING A -0.1
4
PROPOSED TIMBER BULKHEAD
° P S PU KH 9
Y rn
0° 1
�1
WATER ONE z o � 1
m 01
X
o 0,
ce �1 M
ce) 1
- - -- STONE WALL
` AT PLANTING BED,
16" HIGH
' I
- - -j — — — — --- -LGRADE_-51D
\. (GRADE. - 5.33') I L
RIPARIA� � � I
\ _ r BUFFER LINE I D m
NG I c
N PAVER PATIO n I N
(FF ELEV. 4.67) rt
RA D
\ NTI GB, - ---- _ - - - -__ P IN 8 D
PAVER PATIO ATE -- — — — — — — — — — --r/ -- —
(FF ELEV. -2.0') EDGE F CONCRETE
N HOT TU PAVER PATIO OUTDOOR
RIPARIA (FF ELEV. -2.0')
TUB KITCHEN
r `BUFFER LINE
(FF ELEV. -4.0')
SCREENED \ _ -_- W
PORCH HOUSE (GRADE. - 5.33) I ER
n 1 (RELATIVE FF ELEV. 0') \ M /
NOTES:
1. Property information is based on "Final Plat for Cypress Point
Subdivision" issued by Southern Surveying & Mapping, Inc. on
03- 01 -91.
2. Locations of water line, existing rip -rap, and existing dock are based
on as -built measurements and observations from July, 2014-
Y PROPOSED PL
1 ED SITE AN - -- I -N
Z
—
0' 8' 16' - 32'
�IA
Chris Adams, AIA
105 Cromartie Road
P.O. Box S19
Elizabethtown, NC 28337
919.818.3894
www, ch risada msarchitect. com
chris@chrisadamsarchitect.com
U , C9 Ct'r S
rLu
n 74 z
SN y� Qr v�
yak ` C -
0 wNri
NOT for
Construction
Issued for
DWQ Review Only
Residence
for Willie Wall
47 Huntington Place
Holt Lake
Smithfield, NC
date I # prevision
10-28-141 1 1 DWQ - Review Only
11- 18-141 2 1 DWQ Submittal
A -0.2
ENLARGED PROPOSED
SITE PLAN
NOTES:
1. Photo taken from current Johnston County GIS data.
NORTH
AERIAL PHOTO
NOT TO SCALE
m IA
Chris Adams, AIA
105 Cromartie Road
P.O. Box 519
Elizabethtown, NC 28337
919.818.3894
www.chrisadamsarchitect.com
chris@chrisadamsarchitect.com
c
=m �a 74 a�
r ?
R CA,
RO,
,',y�oW N, NO?,d
auu► t► ► ►► f'
NOT for
Construction
Issued for
DWQ Review Only
Residence
for Willie Wall
47 Huntington Place
Holt Lake
Smithfield, NC
date I # I revision
11 -1 8-14 1 DWO Submittal
A -0.3
EXISTING
AERIAL PHOTO
PHOTO 1: Photo taken from existing dock, looking southwest.
PHOTO 2: Photo taken from existing dock, looking west.
PHOTO 3: Photo taken from shore looking southeast
• IA
Chris Adams, AIA
105 Cromartie Road
P.O. Box 519
Elizabethtown, NC 28337
919.818.3894
www.chrisadamsarchitect.com
chiis@chrisadamsar&itect.com
;a 74 ; 2=
'N 'r, --j Z
ti
14,"",,a N,NOS
1
NOT for
Construction
Issued for
DWQ Review Only
Residence
for Willie Wall
47 Huntington Place
Holt Lake
Smithfield, NC
EXISTING
PHOTOS