Loading...
HomeMy WebLinkAbout20141235 Ver 1_401 Application_20141214ICA= Chris Adams, AIA PO Box 519 105 Cromartie Road Elizabethtown, NC 28337 phone 919 - 818 -3894 www chnsadamsarchitect com chrns @chnsadamsarchitect com TRANSMITTAL Date November 24, 2014 To. NC DWQ, WBSCP Unit 1650 Mail Service Center Raleigh, NC 27699 -1650 Project 410 Water Quality Certification request Project address: 47 Huntington Place, Holt Lake, Smithfield, NC For Willie Earl Wall (property owner / applicant) 228 Tyler Drive Smithfield, NC 27577 Phone 919 - 938 -3888 or 919- 669 -8200 Email willie .wall@rapidresponseelectricnc .com Attached 5 copies of signed PCN Form 5 copies of drawing attachments, 11x17 format 1 check for $240 (fee for minor water quality application Message Please contact me or the owner (Willie Earl Wall, listed above) with any questions. Thanks very much. From Chris Adams, AIA cc: Willie Earl Wall P1 of 1 Member of American Institute of Architects LEED Accredited Professional Licensed architect in North Carolina, Tennessee, and Maryland � OF WATF9 O� �G IQQ19 0 G 2 0 1 4 1 2 3 5 10 CVO ac no °f�tiV(3- proleetoao� Form Version 14 January 2009 Page 1 of 10 PCN Form — Version 1 4 January 2009 Pre- Construction Notification (PCN) Form A. Applicant Information 1. Processing la Type(s) of approval sought from the Corps I ❑X Section 404 Permit ❑ Section 10 Permit 1 b Specify Nationwide Permit (NWP) number 18 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? X❑ Yes ❑ No 1 d Type (s) of approval sought from the DWQ (check all that apply) 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le Is this notification solely for the record because wntten approval is not required NO For the record only for DWQ 401, Certification ❑ Yes ❑X No For the record only for Corps Permit ❑ Yes ❑X No if Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts > If so, attach the acceptance, letter from mitigation bank or in -lieu fee program ❑ Yes ❑X No 1 g Is the project located in any of NC's twenty coastal, counties If yes, answer 1 h below ❑ Yes ® No 1 h' Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a Name of project Home Site 2b County Johnston 2c Nearest municipality / town Smithfield 2d Subdivision name Cypress Point Subdivision 2e NCDOT only, T I P or state project no NA 3. Owner Information 3a Name(s) on Recorded Deed Rapid Response Electric, Inc 3b Deed Book and Page No deed book 04435, page 0147 3c Responsible Party (for LLC if applicable) Willie Wall 3d Street address 228 Tyler Drive 3e City, state, zip Smithfield, NC 27$77 3f Telephone no 919- 938 -3888 / 919 -669 -8200 3g Fax no NA 3h Email address wilhe wall @rapidresponseelectricnc com Page 1 of 10 PCN Form — Version 1 4 January 2009 4. Applicant Information (if different from owner) 4a Applicant is ❑ Agent XQ Other, specify Property Owner 4b Name Willie Earl Wall 4c Business name (if applicable) Rapid Response Electric Inc 4d Street address 228 Tyler Drive 4e City, state, zip Smithfield, NC 27577 4f Telephone no 919 -669 -8200 4g Fax no N/A 4h Emad address willie wall @rapidresponseelectricnc corn 5. Agent/Consultant Information (if applicable) 5a Name N/A 5b Business name (if applicable) N/A 5c Street address N/A 5d City,, state, zip N/A 5e Telephone no N/A 5f Fax no N/A 5g Email address N/A Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property Identification no (tax PIN or parcel ID) 167212 -76 -5269 151100360 1 b Site coordinates (in decimal degrees) Latitude 35.4lag g Longitude —7&'40L41a2. 1c Property size 08 acres 2. 1 Surface Waters 2a Name of nearest body of water to proposed project Black Creek (Holt Lake) 2b Water Quality Classification of nearest receiving water B, NSW 2c River basin Neuse (subbasin NEU04) 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application - rh;g po,rccI C-urreo+ly vn,rnpnavcd, 2xCeP+- - fora-docic ('fo he �rrr,ol�se�� and ie-. rip rc. p 6,/Khea d (fo be. rcpla.ed e ;-Vk r. fvM ber jo�lKjteac(�, Fj!( ofAer Surrooncl, nSs pc rce-(5 c-re- s %ogle -- . 5;+,c he-5 hen by Frev,�cvS /"-/% cJ n e-r5 re s u 14 l, d 4L✓1 d -1-re-e-,< ,' h ' C, J � 3b Llst,the total estimated acreage of all existing wetlands on the property 0 1 3c List1the total estimated linear feet of all existing streams (intermittent and perennial) on the property 0 3d Explain the purpose of the proposed project The proposed project consists of a single -family residence, a new boathouse / dock, a new timber bulkhead, and other site improvements t 3e Describe the overall project in detail, including the type of equipment to be used l),, c_ -/v f ur %rc) SEuri�S� V✓1G.ivle. �-o acc-ess (of- Vic, u-)e-�r. Pro 05e. 4e, uf,l;tie - fra -ck- be.c4cha,e. clurim5 'dCaA.Ucjowo 4-0 re -riove de-b6-5 --o f�c;l,l;--fe r^ecrec {;o� bo-a� cCcess ale/1 [✓,�� 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes ❑ No ❑X Unknown Comments 4b If the Corps made the jurisdictional determination, what type of determination was made? ❑ preliminary ❑ Final 4c If yes, who delineated the jurisdictional areas? Name (if known) Agency /Consultant Company Other 4d N/A If yes, list the dates of the Corps jurisdictional determinabons or State determinations and attach documentation 5. Project History 5a Have permits or certifications been requested or obtained fo this r ;project (including all prior phases) in the past El Yes ❑X No ❑Unknown 5b N/A If yes, explain in detail according to "help file" instructions I I 6. Future Project Plans 6a is this a phased project? ❑ Yes ® No 6b NIA If yes, explain Page 3 of 10 PCN Form - Version 14 January 2009 I C. Proposed Impacts Inventory 1. Impacts Summary 1 a Which sections were completed below for your project (check all that apply) 1 Q Wetlands ❑ Streams — tributaries ❑X Buffers Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a. 2b 2c 2d 2e 2f Wetland impact Type of impact Type of wetland Forested Type of jurisdiction Area of number Corps (404,10) or impact Permanent (P) or DWQ (401, other) (acres) Tempo I ra W1 P Excavation Unknown No Corps 01 W2 i Yes /No W3 i Yes/No - W4 I Yes/No - W5 I Yes/No - W6 Yes/No - 2g Total Wetland Impacts: 2h Comments The area affected will be lake bottom excavation to remove buned trees and stumps The goal is to create necessary depth for access to new boat house and pier 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this questlori for all stream sites impacted 3a i 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial (PER) or Type of Average Impact number intermittent (INT)? jurisdiction stream length Permanent (P) or width (linear Temporary (T) (feet) feet) S1 Choose one - - S2 S3 S4 S5 S6 3h Total stream and tributary impacts 31 Comments No Stream impacts I Page 4 of 10 PCN Form —Version 1 4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S Ithen indiv ually list all open water impacts below 4a Open water impact! number Permanent (P) or em ora Tempo, 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 P Holt Lake Excavation Lake 01 02 03 04 i 4f Total open water impacts 4g Comments NO upen Water impacts I S. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated Pi Other 01 P2 Choose one 5f Total: 5g Comments Excavation to install boathouse and pier Material removed will be loaded and hauled off site to proper landfill location 5h Is a dam high hazard permit required? ❑ Yes ❑X No If yes, permit ID no 51 Expected pond surface area (acres) 5l Size of pond watershed (acres) 5k_ Method of construction Track Backhoe to remove lake bottom material 6. Buffer Impacts (for DWQ) If project will Impact a protected riparian buffer, then complete the chart below If yes, then Individually list all buffer Impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a. Project Is In which protected basin? ❑X Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other 6b ( Buffe Impact number — Permanent (P) or Temporary T 6c Reason for Impact 6d Stream name 6e Buffer mitigation required? 6f Zone 1 Impact (square feet ) 6g Zone 2 Impact (square feet B1 P Walkway to boathouse Holt Lake No 40 0 B2 P Bulkhead Holt Lake No B3 P Home Holt Lake No 0 0 84 P LandscapinglHardscapmg Holt Lake No 0 1,660 B5 i B6 6h Total Buffer Impacts: 61 Comments Existing nprap is replaced by bulkhead Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization la Specifically describe measures taken to avoid or minimize the proposed Impacts In designing project Multiple desired home designs were extracted from our plans to get one that works vrithm the available space between the septic field and the riparian buffer zones We've redesigned landscaping and hardscapes several times to minimize intrusion in zone two of the riparian buffer f lb Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques We've moved the boathouse site to an area where impact area is minimized to 10 acre Utilizing track backhoe while lake is drawn down All excavated material will be hauled away to appropriate land fill i i I 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State? ❑ Yes No 2b If Yes, mitigation Is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used for this projI ct? ❑ Mitigation bank El Payment to In -lieu fee program ❑ Permlttee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a Name of Mitigation Bank- N/A 3b Credits Purchased (attach receipt and letter) Type Type Type Quantity Quantity Quantity 3c Comments 4. Complete if.Making a Payment to In -lieu Fee Program 4a Approval letter from In -lieu fee program Is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature Choose one 4d Buffer mitigation requested (DWQ only) square feet 4e Ripanan wetland mitigation requested acres 4f None npanan wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5. Complete if Using a Perrnittee Responsible Mitigation Plan 5a If using a permlttee responsible mitigation plan, provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 14 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires E] Yes No buffer mitigation? 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required 6c 6d 6e Zone' Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 i 1 5 1 6f Total buffer mitigation required: 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments I Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 9 1a Does the project Include or Is it adjacent to protected riparian buffers Identified � Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b If yes, then is a diffuse flow plan included? If no, explain why Single Family Dwelling to be build on residential lot adjacent to protected riparian buffer I I I ❑ Yes ❑X No 2. Stormwater Management Plan 2a What is the overall percent Imperviousness of this project? 0 2b Does this project require a Stormwater Management Plan? ❑ Yes E9 No 2c If th I project DOES NOT require a Stormwater Management Plan, explain why A boathouse is to be constructed in lake area Bulkhead to be constructed for erosion protection Single family dwelling construction on residential lot adtaceInt to riparian buffer zone 2d If thi i s project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan N/A I� I i 2e Who will be responsible for the review of the Stormwater Management Plan? N/A 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction Is this project? Johnston County ❑ Phase II 3b Which of the following locally- implemented stormwater management programs ❑NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ® Other NIA 3c Has the approved Stormwater Management Plan with proof of approval been El Yes ❑X No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a Which of the following state - implemented stormwater management programs apply ❑ORW (check all that apply) ❑Session Law 2006 -246 ®Other N/A 4b Has the approved Stormwater Management Plan with proof of approval been ❑Yes ❑X No attached? 1 5. DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 515 Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form —Version 1 4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a Does the project involve an expenditure of public (federal /state /local) funds or the Yes QX No use of public (federal /state) land lb If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑Yes ❑x No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑X No letteIr) Comments 2. Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, E] Yes OX No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application'? El Yes OX No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) I 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in El Yes QX No additional development, which oould impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description 4. Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility N/A i Page 9 of 10 PCN Form —Version 1 4 January 2009 i 6. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? I 5b Have you checked with the USFWS concerning Endangered Species Act Yes ❑ No Impacts? i 5c If yes, indicate the USFWS Field Office you have contacted 5C- Raleigh 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Inquired with the local department in Johnston County 6. Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? Checked with Jean Gibby regarding this and determined there will be no impact 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? Checked with Jean Gibby regarding this and determined there will be no impact 8. Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA - designated 100 -year floodplain? ❑Yes ❑ No 8b If yes, explain how project meets FEMA requirements Project should not negatively impact the 100 year flood plain as proposed involves excavation only All excavated material will be hauled off site and disposed of in an approved location 8c What source(s) did you use to make the floodplain determination? My survey when I purchased this property I ' Willie Earl Wall 11/412014 Applicant/Agent's Printed Name Applicant/Agent's Signature Date I (Agent's signature is valid only if an authorization letter from the applicant is provided Page 10 of 10 n / ,h LOT 5 - CYPRESS POINT SUBDIVISION 34,685 SF (0 8 ACRE) (THIS PROPERTY IS A RESIDENTIAL BUILDING LOT, AND IS CURRENTLY UNIMPROVED EXCEPT FOR THE EXISTING DOCK) NOTES 1 Property Information is based on "Final Plat for Cypress Point Subdivision" Issued by Southern Surveying & Mapping, Inc on 03- 0,1 -91 2 Locations of water line, existing rip -rap, and existing dock are based on as -built measurements and observations from July, 2014 STING OVERALL SITE PLAN 0' 15' 30' 60' I EXISTING ORDINARY HIGH WATER LINE m S VV, EXISTING ORDINARY HIGH WATER LINE HATCHING INDICATES EXISTING RIPRAP AND OVERGROWN VEGETATION TO BE REMOVED (TO BE REPLACED WITH TIMBER'BULKHEAD WATER SIDE OF NEW BULKHEAD TO ALIGN WITH EXISTING ORDINARY HIGH WATER LINE SEE SHEETS A -0 1 AND A -0 2) HOLT LAKE \ /n 4 (�; /7n 1T,n�r� -, y�y�v V-1l117' / y� ZI a EXISTING DOCK TO BE DEMOLISHED V EXISTING ORDINARY HIGH WATER LINE PORTION OF PROPERTY IN FEMA 100 YEAR FLOODPLAIN �!A Chris Adams; AIA 105 Cromartie Road P O Box 519 Elizabethtown, NC 28337 919.818 3894 www.chdsadamsarchitect com chns @chnsadamsarchitect com 02N�R' GHr�F�y�toO'ir w a: 'a NOT for Construction Issued for DWQ Review Only Residence for Willie Wall 47 Huntington Place Holt Lake Smithfield, NC A -0.0 EXISTING SITE PLAN c °z 'M NORTH i I � I A I / I / I l / i i i m X/I 1 m\ a, 1� o•s£Pryc / � m `£� PROPOS D I �o S PT1C HOUSE FIE FINISHED FLOUIR O EA' ABOVE FOL000 ELEVATION III P cONOREr f 1 i A SEE ENLARGED PLAN A -0.2 .I II NEW TIMBER BULKHEAD. II WATER SIDE OF NEW BULKHEAD � FWq y I 0 ._I_ -� `FEIAAiL00t7Vim— �yP/Ewpy NOTES: 1. Property information is based on "Final Plat for Cypress Point X98 12, Subdivision" issued by Southern Surveying & Mapping, Inc. on 03- 01 -91. r p 2. Locations of water line, existing rip -rap, and existing dock are based m 6 on as -built measurements and observations from July, 2014. ZIz � _ m 9 I Z� OVERALL PROPOSED SITE PLAN I m' 1 IMM 0' 15' 30' 60' 8 m D m ImT 1 D I L 1 1 TO ALIGN WITH EXISTING ORDINARY HIGH WATER LINE. NOTE: NO FILLING OR GRADING IS PROPOSED BELOW THE LEVEL OF THE EXISTING ORDINARY HIGH WATER LINE. \ \\ \ \ \\ \\ \ \ \\ \ \ \ \ \ \\ \\ \\ \ \ \ \\ \\ \\ \ \ \ \ \ \\ \\ \ �IA Chris Adams, AIA 105 Cromartie Road P.O. Box 519 Elizabethtown, NC 28337 919.818.3894 www.chrisadamsarchitect.com chris@chrisadamsarchitect.com Gt;r�F� co �� 2 CJ , t7 n1 3 M ; a 74 ¢ ., y �RrN C AR�\' GP- Z PROPOSED NEW BOATHOUSE / DOCK MAXIMUM 4,000 SF DISTURBED AREA FOR BOATHOUSE CONSTRUCTION NEW RIPRAP BETWEEN END OF NEW TIMBER BULKHEAD AND PROPERTY LINE. EXISTING ORDINARY HIGH WATER LINE TO REMAIN IN CURRENT LOCATION. NOT for Construction Issued for DWQ Review Only Residence for Willie Wall 47 Huntington Place Holt Lake Smithfield, NC date # revision 10.28.14 1 DWQ - Review Only 11 -18-14 2 DWQ Submittal A -0.1 OVERALL PROPOSED SITE PLAN NEW TIMBER BULKHEAD. MAXIMUM 4,000 SF DISTURBED AREA EXISTING ORDINARY HIGH WATER LINE WATER SIDE OF NEW BULKHEAD FOR BOATHOUSE CONSTRUCTION. TO ALIGN WITH EXISTING SEE DRAWING A -0.1 ORDINARY HIGH WATER LINE. NOTE'. NO FILLING OR GRADING IS PROPOSED BELOW THE LEVEL OF THE PROPOSED NEW DOCK EXISTING ORDINARY HIGH WATER LINE. SEE DRAWING A -0.1 4 PROPOSED TIMBER BULKHEAD ° P S PU KH 9 Y rn 0° 1 �1 WATER ONE z o � 1 m 01 X o 0, ce �1 M ce) 1 - - -- STONE WALL ` AT PLANTING BED, 16" HIGH ' I - - -j — — — — --- -LGRADE_-51D \. (GRADE. - 5.33') I L RIPARIA� � � I \ _ r BUFFER LINE I D m NG I c N PAVER PATIO n I N (FF ELEV. 4.67) rt RA D \ NTI GB, - ---- _ - - - -__ P IN 8 D PAVER PATIO ATE -- — — — — — — — — — --r/ -- — (FF ELEV. -2.0') EDGE F CONCRETE N HOT TU PAVER PATIO OUTDOOR RIPARIA (FF ELEV. -2.0') TUB KITCHEN r `BUFFER LINE (FF ELEV. -4.0') SCREENED \ _ -_- W PORCH HOUSE (GRADE. - 5.33) I ER n 1 (RELATIVE FF ELEV. 0') \ M / NOTES: 1. Property information is based on "Final Plat for Cypress Point Subdivision" issued by Southern Surveying & Mapping, Inc. on 03- 01 -91. 2. Locations of water line, existing rip -rap, and existing dock are based on as -built measurements and observations from July, 2014- Y PROPOSED PL 1 ED SITE AN - -- I -N Z — 0' 8' 16' - 32' �IA Chris Adams, AIA 105 Cromartie Road P.O. Box S19 Elizabethtown, NC 28337 919.818.3894 www, ch risada msarchitect. com chris@chrisadamsarchitect.com U , C9 Ct'r S rLu n 74 z SN y� Qr v� yak ` C - 0 wNri NOT for Construction Issued for DWQ Review Only Residence for Willie Wall 47 Huntington Place Holt Lake Smithfield, NC date I # prevision 10-28-141 1 1 DWQ - Review Only 11- 18-141 2 1 DWQ Submittal A -0.2 ENLARGED PROPOSED SITE PLAN NOTES: 1. Photo taken from current Johnston County GIS data. NORTH AERIAL PHOTO NOT TO SCALE m IA Chris Adams, AIA 105 Cromartie Road P.O. Box 519 Elizabethtown, NC 28337 919.818.3894 www.chrisadamsarchitect.com chris@chrisadamsarchitect.com c =m �a 74 a� r ? R CA, RO, ,',y�oW N, NO?,d auu► t► ► ►► f' NOT for Construction Issued for DWQ Review Only Residence for Willie Wall 47 Huntington Place Holt Lake Smithfield, NC date I # I revision 11 -1 8-14 1 DWO Submittal A -0.3 EXISTING AERIAL PHOTO PHOTO 1: Photo taken from existing dock, looking southwest. PHOTO 2: Photo taken from existing dock, looking west. PHOTO 3: Photo taken from shore looking southeast • IA Chris Adams, AIA 105 Cromartie Road P.O. Box 519 Elizabethtown, NC 28337 919.818.3894 www.chrisadamsarchitect.com chiis@chrisadamsar&itect.com ;a 74 ; 2= 'N 'r, --j Z ti 14,"",,a N,NOS 1 NOT for Construction Issued for DWQ Review Only Residence for Willie Wall 47 Huntington Place Holt Lake Smithfield, NC EXISTING PHOTOS