Loading...
HomeMy WebLinkAboutNCC223633_Site Plan or Location Map_20221026a WX X V E , �, � �-� XISTING WETLANDS v x C XxXXXx 1x x m STORAGE POND � nn [SEE DETAIL] v I FES-100 I MH-101 I e C a Db 0 D 7� T WET D T O z ET m C c y y a� D EXISTING WETLANDS y EXISTING b 0 WETLANDS 1 �1 0 GL BOG = YD-146 ` DI LLl fll o DOG DOG DOG _ I 0 DOG c IRE p�c E% ^ MH-125 \ CB-124 - w\ Dc 13M W U) Q I CB-123 > CD z,> 00, Qry ! o� I I -, CB-122 MH-142 I ( I I M I OU • STORM SCHEDULE: Upstream Node Downstream Node Diameter (In) Upstream Invert Downstrea m Invert Pipe Length (ft) Slope (%) Upstream Rim Elev Downstream Rim Elev Pipe Material MH-101 FES-100 48 57.64 57.00 94 0.68 68.57 57.00 RCP III MH-102 MH-101 48 58.45 57.64 271 0.30 68.51 68.57 RCP III CI-103 MH-102 48 59.26 58.45 231 0.35 68.10 68.51 RCP III CI-104 CI-103 48 59.35 59.26 24 0.38 68.08 68.10 RCP III CI-114 CI-104 24 62.46 61.92 221 0.24 67.08 68.08 RCP III CI-115 CI-114 18 62.58 62.46 24 0.52 67.08 67.08 RCP III MH-105 CI-104 48 59.61 59.35 103 0.25 69.34 68.08 RCP III RD-Bl MH-105 12 64.00 62.34 55 3.04 69.50 69.34 HDPE CB-121 MH-105 36 59.24 59.10 48 0.30 68.95 69.34 RCP III CB-122 CB-121 36 59.52 59.24 92 0.30 68.92 68.95 RCP III CB-123 CB-122 36 59.82 59.52 99 0.30 68.92 68.92 RCP III CB-124 CB-123 30 60.12 59.82 99 0.30 68.92 68.92 RCP III YD-146 CB-124 12 64.52 60.12 61 7.17 68.00 68.92 HDPE MH-125 CB-124 30 60.41 60.12 96 1 0.30 68.47 68.92 RCP III CB-126 MH-125 30 60.74 60.41 111 0.30 67.05 68.47 RCP III CB-127 CB-126 30 61.01 60.74 91 0.30 67.02 67.05 RCP III CB-128 CB-127 30 61.29 61.01 94 0.30 67.04 67.02 RCP III CB-129 CB-128 30 61.76 61.29 156 0.30 67.80 67.04 RCP III CB-130 CB-129 30 62.06 61.76 100 0.30 67.80 67.80 RCP III CB-131 CB-130 30 62.36 62.06 100 0.30 67.80 67.80 RCP III MH-132 CB-131 30 62.73 62.36 124 0.30 67.91 67.80 RCP Ill CB-133 MH-132 30 63.00 62.73 90 0.30 66.94 67.91 RCP III CB-134 CB-133 15 64.00 63.40 120 0.50 68.00 66.94 HDPE RD-138 CB-130 12 64.00 63.00 48 2.09 69.15 67.80 HDPE RD-139 CB-129 12 64.00 63.00 44 2.30 69.14 67.80 HDPE RD-B10 CB-127 12 64.00 63.00 45 2.20 68.46 67.02 HDPE YD-147 RD-1310 8 65.00 64.00 80 1.25 68.00 68.46 HDPE RD-Bll CB-124 12 64.00 62.92 50 2.16 69.50 68.92 HDPE MH-142 CB-123 12 64.65 64.16 98 0.50 1 70.34 68.92 1 HDPE YD-143 MH-142 12 65.00 64.65 71 0.50 69.50 70.34 HDPE RD-CH CB-121 15 64.36 63.94 83 0.50 70.48 68.95 HDPE YD-141 RD-CH 12 65.00 64.36 129 0.50 69.50 70.48 HDPE CB-106 MH-105 36 60.11 59.61 166 0.30 68.26 69.34 RCP III RD-132 CB-106 12 64.00 62.26 44 3.93 69.90 68.26 HDPE CB-107 CB-106 36 60.76 60. 11 217 0.30 68.56 68.26 RCP III CB-108 CB-107 30 61.06 60.76 100 0.30 68.56 68.56 RCP III RD-133 CB-108 12 64.00 62.56 46 3.11 69.90 68.56 HDPE CB-109 CB-108 30 61.36 61.06 100 0.30 68.56 68.56 RCP III CB-110 CB-109 30 61.66 61.36 100 0.30 68.56 68.56 RCP III RD-134 CB-110 12 64.00 61.66 51 4.56 69.96 68.56 HDPE MH-111 CB-110 30 62.02 61.66 120 0.30 67.33 68.56 RCP Ill CI-112 MH-111 15 62.26 62.02 79 0.30 66.38 67.33 RCP III CI-113 CI-112 18 62.38 62.26 24 0.50 66.38 66.38 RCP III CB-116 MH-111 24 62.28 62.02 87 0.30 67.00 67.33 RCP III RD-65 CB-116 12 64.50 64.00 42 1.18 68.33 67.00 HDPE YD-144 RD-135 8 65.00 64.50 52 0.97 67.75 68.33 HDPE CB-117 CB-116 24 62.58 62.28 100 0.30 67.00 67.00 RCP III CB-118 CB-117 24 62.87 62.58 98 0.30 67.00 67.00 RCP III MH-119 CB-118 1 18 63.04 62.87 58 0.30 67.37 67.00 RCP Ill MH-120 MH-119 18 63.69 63.45 79 0.30 67.69 67.37 RCP II RD-136 MH-120 12 65.19 63.69 45 3.33 68.25 67.69 HDPE RD-137 MH-120 12 65.00 63.69 43 3.06 68.25 67.69 HDPE YD-135 CB-117 12 65.00 63.00 147 1.36 68.00 67.00 HDPE YD-145 MH-111 12 64.01 63.80 42 0.50 68.00 67.33 HDPE YD-136 YD-145 12 64.59 64.01 116 0.50 68.00 68.00 HDPE YD-138 YD-136 12 65.00 64.59 81 0.51 67.50 68.00 HDPE YD-137 CB-109 15 64.20 63.50 140 0.50 69.00 68.56 HDPE YD-139 YD-137 12 65.00 64.56 81 0.54 68.00 69.00 HDPE YD-140 YD-137 12 65.00 64.20 168 0.48 67.75 69.00 HDPE MH-011 FES-010 36 56.46 54.00 41 5.98 67.00 55.00 RCP Ill MH-012 MH-011 36 57.59 56.46 377 0.30 66.89 67.00 RCP Ill MH-013 MH-012 36 57.86 57.59 88 0.30 66.04 66.89 RCP Ill MH-013A MH-013 36 58.73 57.86 291 0.30 66.00 66.04 RCP III CI-014 MH-013A 36 62.49 62.34 30 0.50 66.61 66.00 RCP Ill CI-026 CI-014 15 62.61 62.49 24 0.50 66.61 66.61 RCP Ill CI-015 MH-013A 36 59.27 58.75 174 0.30 66.57 66.00 RCP Ill CI-025 CI-015 15 62.07 61.95 24 0.48 66.57 66.57 RCP Ill MH-016 CI-015 30 59.66 59.27 129 0.30 68.13 66.57 RCP Ill CI-017 MH-016 30 59.98 59.66 106 0.30 67.32 68.13 RCP III CI-024 CI-017 15 62.82 62.70 24 0.50 67.32 67.32 RCP Ill MH-018 CI-017 30 60.37 59.98 132 0.30 68.59 67.32 RCP Ill MH-023 MH-018 30 60.49 60.37 39 0.30 68.49 68.59 RCP Ill MH-019 MH-018 15 61.11 60.93 59 0.30 69.10 68.59 RCP Ill MH-020 MH-019 15 61.53 61.11 140 0.30 68.16 69.10 RCP Ill CI-021 MH-020 15 61.81 61.53 95 0.30 66.44 68.16 RCP Ill CI-022 CI-021 15 61.93 61.81 24 0.50 66.43 66.44 RCP Ill CI-002 FES-001 36 55.35 55.00 69 0.50 65.87 56.28 RCP Ill CI-008 CI-002 36 60.07 59.50 192 0.30 65.99 65.87 RCP Ill CI-009 CI-008 36 60.14 60.07 24 0.30 65.99 65.99 RCP Ill MH-027 CI-009 36 60.52 60.14 127 0.30 67.52 65.99 RCP Ill MH-028 MH-027 36 61.64 60.52 374 0.30 68.00 67.52 RCP Ill DI-029 MH-028 36 62.00 61.64 120 0.30 62.00 68.00 RCP Ill CI-007 CI-002 15 61.44 61.29 30 0.50 65.94 65.87 RCP Ill CI-003 CI-002 18 60.36 59.76 201 0.30 65.74 65.87 RCP Ill CI-006 CI-003 15 61.29 61.07 43 0.50 65.79 65.74 RCP Ill CI-004 CI-003 18 1 60.96 60.36 199 0.30 65.70 65.74 RCP Ill CI-005 CI-004 15 61.20 60.96 48 0.50 65.70 65.70 RCP Ill J -- ■ FFE, 0.00 .fir � II' �'! ►/ ,.'� !�� . ®lift,,,•♦ i IR .L -EXISTING ,-WETLANDS FI FM FM FM FM F® --WET WET WET- DRAINAGE NOTES: 1.) DRAINAGE EASEMENT AND STORMWATER SYSTEM MAINTENANCE IS THE RESPONSIBILITY OF THE DEVELOPER OR HOA, INCLUDING PONDS, PIPES, AND INFILTRATION BASINS AND TRENCHES. 2.) ALL IMPERVIOUS MUST DRAIN TO THE DESIGNED STORMWATER SYSTEM, PER THE APPROVED PLANS. 3.) NO OBSTRUCTIONS ARE ALLOWED IN DRAINAGE EASEMENTS, INCLUDING FENCES. 4.) ALL STORM DRAINAGE STRUCTURES SHALL MEET NCDOT STANDARDS AND SPECIFICATIONS AND SHALL BE TRAFFIC RATED FOR H-20 LOADS AT A MINIMUM. 5.) ALL CATCH BASIN (CB) RIM ELEVATIONS AND YARD INLET (YI) THROAT ELEVATIONS ARE LISTED AS THE "GUTTER OF FLOWLINE ELEVATION" WITHIN THE CURB SECTION. THE CONTRACTOR SHALL MAINTAIN A UNIFORM EDGE OF PAVEMENT (EOP) WHEN PLACING THE STORM INLETS WITHIN THE CURB -LINE (SEE "CURB TRANSITION' DETAIL). FOR CATCH BASINS WITHIN A TRANSITION FROM 24" STANDARD CURB & GUTTER, THE RIM ELEVATION GIVEN IS 1 INCH BELOW EOP. 6.) MANHOLE RIM ELEVATION SHOWN ABOVE IS FLUSH WITH PROPOSED GRADE. CONTRACTOR SHALL PROVIDE 6" CLEARANCE ABOVE PROPOSED GRADE WHEN PLACED IN A GRASS/PERVIOUS AREA; AND A FLUSH CONDITION WITH PROPOSED PAVEMENT OR IMPERVIOUS COVER. 7.) PROPOSED BUILDINGS SHALL DIVERT ROOF DRAINAGE TO STORMWATER COLLECTION SYSTEM. 8.) CONTRACTOR SHALL ADJUST ALL FRAMES OF EX. UTILITY INFRASTRUCTURE WITHIN ASPHALT OVERLAY AREAS TO MATCH PROPOSED GRADES. 9.) THE CONTRACTOR SHALL USE EITHER RCP (CL. III UNLESS OTHERWISE NOTED) OR HDPE PIPE FOR THE STORM DRAINAGE SYSTEM. IF THE CONTRACTOR CHOOSES TO USE HDPE PIPE, IT SHALL BEADS N-12 WT STORM PIPE OR APPROVED EQUAL AND SHALL BE INSTALLED TO MANUFACTURER SPECIFICATIONS. IN ADDITION, THE CONTRACTOR SHALL BE SURE TO PROVIDE CONCRETE COLLARS AROUND EACH F.E.S. TO PREVENT FLOATATION IF HDPE PIPE IS CHOSEN. NOTES: 1.) SEE GENERAL NOTES SHEET (C-1.0) FOR GRADING AND DRAINAGE NOTES AND DETAILS FOR MORE INFORMATION. 2.) ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL SURF CITY STANDARDS AND SPECIFICATIONS. 3.) GEOTECHNICAL TESTING SHALL BE PERFORMED ON -SITE. A GEOTECHNICAL ENGINEER SHALL BE CONSULTED TO CONFIRM SUITABILITY OF SUBGRADE MATERIAL AND PROPER COMPACTION IN FILL AREAS. ASPHALT AREA NOTE: 1.) SITE CONTRACTOR SHALL STRIP TOPSOIL AND ANY UNSUITALBE MATERIAL AND PROVIDE CUT/FILL OPERATIONS TO PROVIDE A COMPACTED CONTROLLED SUBGRADE, IN ACCORDANCE WITH THE SUBSURFACE GEOTECHNICAL EXPLORATION AND TECHNICAL SPECIFICATIONS. BUILDING PAD NOTE: 1.) SITE CONTRACTOR SHALL STRIP TOPSOIL AND ANY UNSUITALBE MATERIAL AND PROVIDE CUT/FILL OPERATIONS TO PROVIDE A COMPACTED CONTROLLED BUILDING PAD, IN ACCORDANCE WITH THE SUBSURFACE GEOTECHNICAL EXPLORATION AND TECHNICAL SPECIFICATIONS. NOTATION: CB = CATCH BASIN TC = TOP OF CURB ELEVATION DCB = DOUBLE CATCH BASIN BC = BOTTOM OF CURB (GUTTER) ELEVATION DI = DROP INLET PG = PROPOSED GRADE DDI = DOUBLE DROP INLET HP = HIGH POINT ELEVATION YI = YARD INLET (2-SIDE OPEN THROAT) SW = SIDEWALK ELEVATION MH = STORM MANHOLE EX EP = EXISTING EDGE OF PAVEMENT ELEVATION FES = FLARED END SECTION CL = ROAD CENTERLINE ELEVATION RD' = ROOF DRAIN CONNECTION' PAD = DUMPSTER PAD ELEVATION 'PROVIDE IN -LINE CLEANOUT AND CONNECTION TO DOWNSPOUT - SEE ARCHITECTURAL & PLUMBING PLANS FOR DOWNSPOUT CONNECTIONS. MFIFE ■��� \fit._ ���r��_ ■r 70.00 11110�2-- I __ An ull on! NMI OEM Mur GRAPHIC SCALE 0 25 50 100 200 SCALE: 1 "=50' z O U) w UQ O W O � N z r►� O 0 O M O w z J U W0. Z O l 0 V •i 0 G1 00 � 0 Z ^N Q�o O 4t 41 W O V U W Z -" z �W G1 � U Q Q � � O � Q�w H � 04 p J J () Q 00 i9 F- z N I I O o� Q U ~ Q Z O ILL � o0 o z Jrz0 U IL af0LL (� z_ W� O co O U ::1 J W > � z Y Q W J (93: U d OU0-L� W 0 �u 000 SEAL \\\oulllii��� 028847 ° LNG �\� -,, �. .......... ? G. 1iiil Iiii0\\\ 09120122 C-4,00 PEI JOB#: 21464.PE