No preview available
HomeMy WebLinkAbout20130912 Ver 1_Emails_20141205Wanucha, Dave From: Matt Hindt <Matt.Hindt @branchhighways.com> Sent: Friday, December 05, 2014 7:00 AM To: Parker, Jerry A; Wanucha, Dave; Bailey, David E SAW Subject: RE: Borrow Permit, Guilford Co. (UNCLASSIFIED) No I already have an environmental specialist to review our borrow site and surrounding areas but just wanted to make sure we had everything covered. I will review this chain of emails with our environmental specialist so he is aware of the concern areas. If any questions come up through our review I will give you a call. Thanks for all your help. Have a good day. Thank you, Matt Hindt Project Engineer Branch Highways, Inc. 540 - 915 -9139 (Cell) www.branchhighways.com - - - -- Original Message---- - From: Parker, Jerry A [mailto:jparker @ncdot.gov] Sent: Thursday, December 04, 2014 3:17 PM To: Wanucha, Dave; Bailey, David E SAW; Matt Hindt Subject: RE: Borrow Permit, Guilford Co. (UNCLASSIFIED) Hello All. I apologize for being a "Johnny come lately" to this discussion. However, Mr. Hindt, if you are planning on utilizing a borrow or waste site which is in any way associated with a NCDOT project then it is highly recommended that an environmental consulting firm be used to review all aspects of the project. NCDOT does not generally approve any waste or borrow sites that have not received such review. There are so many aspects and variables which may result in liability issues that NCDOT would not be willing to utilize any site that has not received a review from a trained professional environmental consulting firm. Generally, the contractor that is working for NCDOT is responsible for securing the environmental review. Once that has been obtained then it will be further reviewed by NCDOT for compliance. Please call me at 336 256 -2063 if you which to discuss this further. Jerry Parker NCDOT Environmental Supervisor - - - -- Original Message---- - From: Wanucha, Dave Sent: Thursday, December 04, 2014 2:36 PM To: Bailey, David E SAW; Matt Hindt Cc: Parker, Jerry A Subject: RE: Borrow Permit, Guilford Co. (UNCLASSIFIED) Hi Matt, In addition to that which Mr. Bailey stated below, as a contractor for NCDOT, you are also required to be in compliance with the requirements of NCDOT's National Pollutant Discharge Elimination System (NPDES) General Stormwater Discharge Permit (NCG 01000) for Construction Activities. NC Division of Water Resources (DWR) is responsible for ensuring that the applicable requirements are met and to investigate pollutant /sediment discharges to surface waters of the state. There are several permit conditions that you need to be aware of, some of which include monitoring of rainfall, inspections, record keeping and ground stabilization. Approved soil erosion control measures and Best Management Practices (BMPs) must also be utilized where needed. Jerry Parker can inform you of the details related to the NPDES General Stormwater Permit. Please don't hesitate to contact me if there are further questions. Thanks. Dave Wanucha Dave Wanucha NC DENR Winston Salem Region Office NC Division of Water Resources Transportation Permitting Unit 450 W. Hanes Mill Rd, Suite 300 Winston - Salem, NC 27105 Cell (336) 403 -5655 Office (336) 776 -9703 Dave.Wanucha @ncdenr.gov E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. - - - -- Original Message---- - From: Bailey, David E SAW [ mailto: David.E.Bailey2 @usace.army.mil] Sent: Thursday, December 04, 2014 11:56 AM To: Matt Hindt Cc: Wanucha, Dave Subject: RE: Borrow Permit, Guilford Co. (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE Matt, Thanks for the additional information. I'm just getting back into the office, so I apologize for not getting back with you sooner. I've reviewed the information you sent and added the proposed borrow site into GIS. Based on aerial photography and LiDAR I am concerned about 2 general areas within your drawn boundary. These areas are hatched in red on the attached sketch. There is a pond just to the north of the project boundary, leaving open the possibility of fringe wetlands along the boundary within the project area. Further, the aerial photo shows what appears to be a stream just to the west of your project area and likely extending into the project boundary. Wetlands may also occur along the fringes of this stream and within non - stream narrow drainages along in the headwaters of the stream. As such, I cannot determine a lack of waters of the US within the entirety of your project area based on the information provided. It is possible that NCDOT conducted wetland delineations /stream determinations within this area for the project. As such, I recommend that you contact NCDOT for this information. If you wish to pursue using portions of the project area that may contain wetlands and other waters of the US I strongly recommend that you contact a qualified environmental consultant to delineate any wetlands or waters of the US within the area and present the information to the USACE for verification. Please note that authorization is required, in the form of a permit, for any discharges of dredged or fill material in waters of the US prior to conducting the activity pursuant to section 404 of the Clean Water Act. Please let me know if you have any questions. Sincerely, Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE- SAW -RG -R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554 -4884, Ext. 30. Fax: (919) 562 -0421 Email: David. E. Bailey2 @usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http : / /regulatory.usacesurvey.com /. - - - -- Original Message---- - From: Matt Hindt [ mailto :Matt.Hindt @branchhighways.com] Sent: Monday, November 24, 2014 3:08 PM To: Bailey, David E SAW Subject: [EXTERNAL] RE: Borrow Permit, Guilford Co. (UNCLASSIFIED) Mr. Bailey, Attached is a rough sketch of our borrow site, approximate proposed haul road, and approximate proposed new road for NCDOT plans. The pond on the outskirt of the borrow site will not be affected by our operations. Let me know if you need any additional information. Thanks for all your help. Matt Hindt Project Engineer Branch Highways, Inc. 540 - 915 -9139 (Cell) www.branchhighways.com - - - -- Original Message---- - From: Bailey, David E SAW [ mailto: David.E.Bailey2 @usace.army.mil] Sent: Monday, November 24, 2014 1:47 PM To: Matt Hindt Cc: Parker, Jerry A Subject: RE: Borrow Permit, Guilford Co. (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE Thanks Mr. Hindt. NCDOT is ultimately responsible for ensuring that their borrow sources do not impact wetlands or other waters of the US. Typically they will send a report detailing their borrow sources (if they occur within 400 feet of a waters of the US) and have already had environmental consultants prepare the necessary documentation to send to us if necessary. As a first step please coordinate with NCDOT to see if this work has been completed yet. I just left Jerry Parker (NCDOT Div. 7 DES) a voicemail letting him know that I am referring you back to NCDOT on this. Please give me a call if you have any questions. -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE- SAW -RG -R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554 -4884, Ext. 30. Fax: (919) 562 -0421 Email: David. E. Bailey2 @usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http : / /regulatory.usacesurvey.com /. - - - -- Original Message---- - From: Matt Hindt [ mailto :Matt.Hindt @branchhighways.com] Sent: Monday, November 24, 2014 12:21 PM To: Bailey, David E SAW Cc: Johnson, Ann SAW; Parker, Jerry A Subject: [EXTERNAL] RE: Borrow Permit, Guilford Co. (UNCLASSIFIED) Mr. Bailey, Yes, this borrow area will be used for NCDOT Project R- 261213, US 421 at SR 3418 (Keeley Road). Let me know if you need any additional information about the project. Thank you, Matt Hindt Project Engineer Branch Highways, Inc. 540 - 915 -9139 (Cell) www.branchhighways.com - - - -- Original Message---- - From: Bailey, David E SAW [ mailto: David.E.Bailey2 @usace.army.mil] Sent: Monday, November 24, 2014 11:50 AM To: Matt Hindt Cc: Johnson, Ann SAW; Parker, Jerry A Subject: Borrow Permit, Guilford Co. (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE Mr. Hindt, Thank you for your inquiry. My name is David Bailey and I am the US Army Corps of Engineers regulatory project manager responsible for Guilford County. I can better answer your question with a little more information. Is this borrow area associated with a NCDOT project? If so, which project is it? If not, I will need additional information about the footprint of the proposed borrow area. Based on that information I will determine if a Jurisdictional Determination is required in order to identify any wetlands or other waters of the US on site, and furthermore if any are proposed to be impacted and therefore subject to our permitting requirements. If you have any questions in the mean time please feel free to contact me via phone or e-mail. Sincerely, Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE- SAW -RG -R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554 -4884, Ext. 30. Fax: (919) 562 -0421 Email: David. E. Bailey2 @usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http : / /regulatory.usacesurvey.com /. This message was sent from the Headquarters U.S. Army Corps of Engineers website. Message From: Matt Hindt Email: matt.hindt @branchhighways.com Response requested: Yes Message: Hello, 5 My company has a project in Guilford County, NC and are looking to receive borrow material from a property owner in the area. Per the NCDOT specifications, we need to check with you and see if you have regulatory jurisdiction in the area. If so, we need to obtain a permit for such borrow sources. The property owners address is 2100 Neeley Road, Pleasant Garden, NC 27313. Please let me know if we will need the permit and if so, what information you will need from my company. Thank you, Matt Hindt Classification: UNCLASSIFIED Caveats: NONE Classification: UNCLASSIFIED Caveats: NONE Classification: UNCLASSIFIED Caveats: NONE Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.