Loading...
HomeMy WebLinkAbout20221461 Ver 1_ePCN Application_20221021DWR Division of Water Resources Initial Review Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13, 2022 Ver 4.3 Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. Pre -Filing Meeting Date Request was submitted on: 7/15/2022 BIMS # Assigned* Version#* 20221461 1 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification What amout is owed?* $240.00 $570.00 Reviewing Office* Select Project Reviewer* Washington Regional Office - (252) 946-6481 Robert Tankard:eads\rbtankard Information for Initial Review la. Name of project: The Proximity at New Bern la. Who is the Primary Contact?* Bill Schoettelkotte lb. Primary Contact Email:* lc. Primary Contact Phone:* bill@capefearcommercial.com (910)332-1593 Date Submitted 10/21/2022 Nearest Body of Water HaywardCreek Basin Neuse Water Classification N/A Site Coordinates Latitude: 35.093351° A. Processing Information County (or Counties) where the project is located: Craven Is this a NCDMS Project Yes No Is this project a public transportation project? * Yes No Longitude: *--77.119961 ° la. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No Please provide the date of the previous submission.* 7/15/2022 1 b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) lc. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: 29 - Residential Developments NWP Numbers (for multiple NWPS): ld. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: If. Is this an after -the -fact permit application?* Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1 h. Is the project located in any of NC's twenty coastal counties? Yes No 11. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes 401 Water Quality Certification - Express Riparian Buffer Authorization No Unknown 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information ld. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project?* Yes No 2. Owner Information 2a. Name(s) on recorded deed: Proximity New Bern, LLC 2b. Deed book and page no.: 3723/1018 2c. Contact Person: Bill Schoettelkotte Yes No Yes No 2d. Address Street Address Greenleaf Cemetary Road & Dr. MLK, Jr. Blvd Address Line 2 City State / Province / Region New Bern NC Postal / Zip Code Country 28562 United States 2e. Telephone Number: 2f. Fax Number: (910)332-1593 2g. Email Address: * bill@capefearcommercial.com 4. Agent/Consultant (if applicable) 4a. Name: Jonathan Grubb 4b. Business Name: ECS Limited Southeast 4c. Address Street Address 6714 Netherlands Drive Address Line 2 City Wilmington Postal / Zip Code 28405 4d. Telephone Number: (919)414-0214 4f. Email Address: * Jgrubb@ecslimited.com C. Project Information and Prior Project History State / Province / Region NC Country United States 4e. Fax Number: 1. Project Information 1b. Subdivision name: (if appropriate) lc. Nearest municipality / town: New Bern 2. Project Identification 2a. Property Identification Number: 8-207-213, 8-207-209, 8-207-237, 8-207-258 2c. Project Address Street Address Greenleaf Cemetary Road and MLK Jr. BLVD Address Line 2 City New Bern Postal / Zip Code 28562 3. Surface Waters 3a. Name of the nearest body of water to proposed project: * HaywardCreek 3b. Water Resources Classification of nearest receiving water: * N/A 3c. What river basin(s) is your project located in?* 2b. Property size: 28.33 State / Province / Region NC Country United States Neuse 3d. Please provide the 12-digit HUC in which the project is located. 030202040305 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The site consists of forested land, maintained herbaceous areas, forested wetlands, and two developed commercial properties. The commercial properties are located along Greenleaf Cemetary Road. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? * Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 2.64 4g. List the total estimated linear feet of all existing streams on the property: 2,013 4h. Explain the purpose of the proposed project:* The purpose of the proposed project is to construct a multi -family development and associated parking areas to accommodate the influx of new residents to the area. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * The proposed development will include nine multi -family residential buildings, an office/clubhouse, a pool, two stormwater retention ponds, a maintenance building, and associated parking areas. Standard construction equipment such as cranes, excavators, dump trucks, and similar vehicles would be used for the project. Proper erosion and sedimentation control measures (BMP's) would be employed throughout the project. Typical materials and machinery will be used on -site during the construction process. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes Comments: No Unknown 5b. If the Corps made a jurisdictional determination, what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: SAW-2022-02250 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: Jonathan Grubb ECS Limited Southeast 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR 5/13/2022 6. Future Project Plans 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): Wetlands Open Waters 2. Wetland Impacts Streams -tributaries Pond Construction Buffers 2a. Site #* (?) 2a1 Reason (?) 2b. Impact type* (?) 2c. Type of W.* 2d. W. name 2e. Forested* 2f. Type of Jurisdicition* (?) 29. Impact area* w1 fill P Bottomland Hardwood Forest w1 Yes Both 0.230 (acres) 2g. Total Temporary Wetland Impact 0.000 2g. Total Wetland Impact 0.230 2i. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 2g. Total Permanent Wetland Impact 0.230 la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: A multifamily development is necessary to accommodate the influx of new residents to the area. While current zoning allows for 360 units, the developer voluntarily elected to reduce the number of units to 252, a 30% reduction, and construct the minimum number of required parking spaces. These measures (i) reduce wetland impacts to 9% of total wetland area, (ii) decrease impervious area and (iii) allow the majority of wetlands, including the entirety of the jurisdictional stream to remain undisturbed. lb. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The impacts are isolated to the wetlands that nearly bisect the site. For this reason, avoidance is not feasible even with the significant reduction to the number of units proposed (360 to 252). Additional measures undertaken to exceed wetland buffer requirements are reflected on the final site plan and include repositioning the clubhouse, pool and street parking depicted on the initial site plan provided in impact map. The construction techniques shall be conducted in accordance with NCDENR standards. Temporary and additional erosion control measures shall be maintained throughout the construction process. Silt fencing will be placed at the bottom of the slopes to deter sediment translocation offsite and control erosion during construction activities. Temporary erosion, sedimentation, and pollution controls will be installed prior to and maintained during the entire construction duration and until final stabilization is established. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2c. If yes, mitigation is required by (check all that apply): DWR Corps 2d. If yes, which mitigation option(s) will be used for this project? Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. Yes No 4b. Stream mitigation requested: 4c. If using stream mitigation, what is the stream temperature: (linear feet) 4d. Buffer mitigation requested (DWR only): 4e. Riparian wetland mitigation requested: (square feet) (acres) 4f. Non -riparian wetland mitigation requested: (acres) 0.23 4h. Comments 4g. Coastal (tidal) wetland mitigation requested: (acres) F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: Not within a buffer 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? Yes No N/A - project disturbs < 1 acre 2d. Which of the following stormwater management program(s) apply: Local Government State Local Government Stormwater Programs Phase II NSW USMP Water Supply Please identify which local government stormwater program you are using. Newbern Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? * Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* Yes No 3b. If you answered "no," provide a short narrative description. N/A 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* Yes No N/A 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. Wastewater treated at a treatment plant operated by the City of New Bern. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* Yes 5e. Is this a DOT project located within Division's 1-8? Yes No No Unknown 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS IPaC and NC NHP. Awaiting USFWS for final concurrence. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * NOAA Essential Fish Habitat Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NOAA Essential Fish Habitat Mappe 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8c. What source(s) did you use to make the floodplain determination?* FEMA Flood Map Service Center Mapping and development plans Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document 1 PCN_FillableForm_v1_DRAFT_20220629-merged-compressed.pdf 4.88MB File must be PDF or KMZ Comments Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND I intend to electronically sign and submit the PCN form. Full Name: Jonathan Dale Grubb Signature ogiralfass e`0a4 Date 10/21/2022 x STA-q \1 v e awwv'�s°1' NORTH CAROLINA Environmental Quality Water Resources Office Use Only Corps Action I D no. SAW-2022-XXXXX Date received: [Click to enter.] DWR project no. 'lick enter.l Date received: [Click to enter.] Site Coordinates: Latitude (DD.DDDDDD): 35.093351' Longitude (DD.DDDDDD):-77.119961' Form Version 4.2, January 31, 2022 Pre -Construction Notification (PCN) Form (Ver. 4.2, January 31, 2022)) For Nationwide Permits and Regional General Permits and corresponding Water Quality Certifications Please note: fields marked with a red asterisk are required. The form is not considered complete until all mandatory questions are answered. The online help file may be found at this link: httas://edocs.dea. nc.aov/WaterResources/0/edoc/624704/PCN%20HeID%20File%202018-1-30.Ddf The help document may be found at this link: htt0://www.saw. usace.army.mil/M issions/Regulatory- Perm it- Program/Perm its/2017-Nationwide- Permits/Pre-construction-Notification/ A. Processing Information County (counties) where project is located: Craven Additional (if needed). Is this a NCDMS project? (Click yes only if NCDMS is the applicant or co- applicant) ❑ Yes X No Is this a public transportation project? (Publicly funded municipal, state, or federal road, rail, or airport project) ❑ Yes X No Is this a NCDOT project? ❑ Yes X No If yes, NCDOT TIP or state project number: Click to enter. If yes, NCDOT WBS number: Click to enter. Page 1 of 20 PCN Form -Version 4.2, January31, 2022 ❑x Section 404 Permit (wetlands, streams, waters, Clean Water Act) 1 a. Type(s) of approval sought from the Corps: * ❑ Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted? * ❑ Yes ❑x No Please provide the date of the previous submission. * Click to enter a date. ❑x Nationwide Permit (NWP) 1 b. What type(s) of permit(s) do you wish to seek ❑ Regional General Permit (RGP) authorization? ❑ Standard (IP) This form may be used to initiate the standard/ individual permit process with the USACE. Please contact your Corps representative concerning submittals for standard permits. All required items can be included as attachments and submitted with this form. 1 c. Has the NWP or GP number been verified by the Corps? * ® Yes ❑ No NWP number(s) (list all numbers ): 29 RGP number(s) (list all numbers ): -lick to enter. Are you a federal applicant? ❑ Yes ❑x No If yes, please provide a statement concerning compliance with the Coastal Zone Management Act Click to enter text. 1 d. Type(s) of approval sought from DWR (check all that apply): ❑x 401 Water Quality Certification — Regular ❑ 401 Water Quality Certification— Express ❑ Non-404 Jurisdictional General Permit ❑ Riparian Buffer Authorization ❑ Individual 401 Water Quality Certification Is this a courtesy copy notification ❑ Yes ❑x No 1 e. Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: * ❑ Yes ❑x No For the record only for Corps Permit: * ❑ Yes ❑x No 1f. Is this an after -the -fact permit/certification application? * ❑ Yes ❑x No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for ® Yes ❑ No mitigation of impacts? If yes, attach the acceptance letter from mitigation bank or in -lieu fee program. 1 h. Is the project located in any of NC's twenty coastal counties? * ® Yes ❑ No 1 i. Is the project located within an NC DCM Area of Environmental ❑ Yes ❑x No ❑ Unknown Concern (AEC)? * 1j. Is the project located in a designated trout watershed? * ❑ Yes ❑x No If yes, you must attach a copy of the approval letter from the appropriate Wildlife Resource Commission Office. Trout information may be found at this link: http://www.saw.usace.army.miI/Missions/Regulatory-Permit- Program/Agency-Coordination/Trout.aspx Page 2 of 20 PCN Form - Version 4.2, January31, 2022 B. Applicant Information 1 a. Who is the primary contact? Bill Schoettelkotte 1 b. Primary Contact Email: bill@capefearcommercial.com 1 c. Primary Contact Phone: (###)###-#### (910)332-1593 1 d. Who is applying for the permit/certification? (check all that apply) ® Owner ❑ Applicant (other than owner) 1 e. Is there an agent/consultant for this project? ® Yes ❑ No 2. Landowner Information 2a. Name(s) on Recorded Deed: Proximity New Bern, LLC 2b. Deed Book and Page No.: 3723/1018 2c. Contact Person (for corporations): Bill Schoettelkotte 2d. Address Street Address: Greenleaf Cemetary Road & Dr. MLK, Jr. Blvd Address line 2: Click to enter. City: New Bern State/ Province/ Region: North Carolina Postal/ Zip Code: 28562 Country: United States 2e. Telephone Number: (###)###-#### (910)332-1593 2f. Fax Number: (###)###-#### See Agent Authorization (multiple) 2g. Email Address: See Agent Authorization (multiple) 3. Applicant Information (if different from owner) 3a. Name: Bill Schoettelkotte 3b. Business Name (if applicable): The Proximity at New Bern, LLC 3c. Address: Street Address: 102 Autumn Hall Drive Address line 2: Suite 210 City: Wilmington State/ Province/ Region: North Carolina Postal/ Zip Code: 28403 Country United States 3d. Telephone Number: (###)###-#### (910)332-1593 3e Fax Number: (###)###-#### Click to entr 3f. Email Address: bill@capefearcommercial.com Page 3 of 20 PCN Form - Version 4.2, January31, 2022 4. Agent/ Consultant (if applicable) 4a. Name: Jonathan Grubb 4b. Business Name: ECS Southeast LLP 4c. Address: Street Address: 6714 Netherlands Drive Address line 2: Click to entr City: Wilmingtion State/ Province/ Region: North Carolina Postal/ Zip Code: 28405 Country: United States 4d. Telephone Number: (###)###-#### 919-861-9859 4e Fax Number: (###)###-#### Click to entc 4f. Email Address: jgrubb@ecslimited.com Agent Authorization Letter: Attach a completed/signed agent authorization form or letter. A sample form may be found at this link: https://www.saw.usace.army. mil/Missions/Reg ulatory- Perm it-Program/Permits/2017-Nationwide-Permits/Pre- construction-Notification/ Page 4 of 20 PCN Form - Version 4.2, January31, 2022 C. Project Information and Prior Project History 1. Project Information 1 a. Name of project: * The Proximity at New Bern 1 b. Subdivision name (if appropriate): Click to enter. 1 c. Nearest municipality/town: * New Bern, North Carolina 2. Project Identification 2a. Property identification number (tax PIN or parcel ID): 8-207-213, 8-207-209, 8-207-237, 8-207-258 2b. Property size (in acres): 28.33 2c. Project Address: Street Address: Greenleaf Cemetary Road and MLK Jr. BLVD Address line 2: Southwest corner City: New Bern State/ Province/ Region: North Carolina Postal/ Zip Code: 28562 Country: United States 2d. Site coordinates in decimal degrees (using 4-6 digits after the decimal point): * Latitude (DD.DDDDDD): * 35.093351 ° Longitude (-DD.DDDDDD): *--77.119961 ° 3. Surface Waters 3a. Name of nearest body of water to proposed project: * HaywardCreek 3b. Water Resources Classification of nearest receiving N/A water: * The Surface Water Classification map may be found at this link: https:Hncdenr.maps.arcqis.com/apps/webappviewer/index.html?id=6e125ad7628f494694e259c80dd64265 White Oak 3c. In what river basin(s) is your project located? Choose additional (if needed) 3d. Please provide the 12-digit HUC in which the project is 030202040305 located: The Find Your HUC map may be found at this link: https:Hncdenr.maps.arcgis.com/apps/Publiclnformation/index.html?appid=ad3a85aOc6d644aOb97cdO69db238ac3 Page 5 of 20 PCN Form - Version 4.2, January31, 2022 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site consists of forested land, maintained herbaceous areas, forested wetlands, and two developed commercial properties. The commercial properties are located along Greenleaf Cemetary Road. 4b. Have Corps permits or DWR certifications been obtained for this ❑ Yes ❑x No ❑ Unknown project (including all prior phases) in the past? If yes, please give the DWR Certification number and/or Corps SAW-2022-XXXXX Action ID (ex. SAW-0000-00000): jClick to enter.j Attach any pertinent project history documentation 4b2. Is any portion of the work already complete? ❑ Yes ❑x No If yes, describe the completed work. Click to enter text. 4c. List of other certifications or approvals/denials received from other federal, state or local agencies for work described in this application not related to the 404 or 401. N/A 4d. Attach an 8'h x 11" excerpt from the most recent version of the USGS topographic map indicating the location of the project site. 4e. Attach an 8'h x 11" excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. 4f. List the total estimated acreage of all existing wetlands on the 2.64 acres property: 4g. List the total estimated linear feet of all existing streams (intermittent 2,013 linear feet and perennial) on the property: 4g1. List the total estimated acreage of all existing open waters on the 0 acres property: 4h. Explain the purpose of the proposed project: The purpose of the proposed project is to construct a multi -family development and associated parking areas to accommodate the influx of new residents to the area. 4i. Describe the overall project in detail, including the type of equipment to be used: The proposed development will include nine multi -family residential buildings, an office/clubhouse, a pool, two stormwater retention ponds, a maintenance building, and associated parking areas. Standard construction equipment such as cranes, excavators, dump trucks, and similar vehicles would be used for the project. Proper erosion and sedimentation control measures (BMP's) would be employed throughout the project. Typical materials and machinery will be used on -site during the construction process. 4j. Attach project drawings/site diagrams/depictions of impact areas for the proposed project. 4k. Will this activity involve dredging in wetlands or waters? ❑ Yes ❑x No If yes, describe the type of dredging, the composition of the dredged material, and the locations of disposal area. �.in..n w ci nci Lc/. Page 6 of 20 PCN Form - Version 4.2, January31, 2022 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or in ® Yes ❑ No ❑ Unknown proposed impact areas? Comments: Anticipated wetland impact offset is a 2:1 ratio. 5b. If the Corps made a jurisdictional determination, ❑x Preliminary ❑ Approved ❑ Emailed concurrence what type of determination was made? ❑ Not Verified ❑ Unknown ❑ n/a Corps AID number (ex. SAW-0000-00000): SAW-2022-02250 Name (if known): Jonathan Grubb 5c. If 5a is yes, who delineated the jurisdictional Agency/Consultant Company: ECS Southeast LLP areas? Other: Click to enter 5d. List the dates of the Corps jurisdictional determination or State determination if a determination was made by either agency. 5/13/2022 5d1. Attach jurisdictional determinations. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑x No 6b. If yes, explain. Click to enter. Are any other NWP(s), regional general permit(s), or individual permit(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossings for linear projects that require Department of the Army authorization but don't require pre -construction notification. NO 7. Addresses of adjoining property owners, lessees, etc. whose property adjoins the waterbody (if more than can be entered here, please attach a supplemental list) Church -Faith United Methodist, 4143 MLK Jr. Blvd, New Bern, NC 28562 J Herrin Enterprises, Inc., 110 Outrigger Rd, New Bern, NC 25862 Bo, Win & Bah Blute, 4300 Haywood Farms, New Ber, NC 25862 Roberto Maggio, 4302 Haywood Farms Rd, New Bern, NC 25862 Roger & Casey Moore, 4306 Haywood Farms Rd, New Bern, NC 25862 Alice Allen, 4308 Haywood Farms Rd, New Bern, NC 25862 Lonore Adametz, 4400 Haywood Farms Rd, New Bern, NC 25862 Charles & Titina Carrol, 4402 Haywood Farms Rd, New Bern, NC 45862 Frak Farlow & Paul Brett Unversaw, 4404 Haywood Fardms Rd, New Bern, NC 45862 John & Sherry Kelly, 4406 Haywood Farms Rd, New Bern, NC 45862 Shiwa Inc., 1901 MLK Jr. Blvd, New Bern, NC 45862 8. Scheduling of activity: Click to enter. Page 7 of 20 PCN Form - Version 4.2, January31, 2022 Page 8 of 20 PCN Form - Version 4.2, January31, 2022 D. Proposed Impacts Inventory Impacts Summary ❑x Wetlands ❑ Streams - tributaries 1 a. Where are the impacts associated with your project ❑ Buffers ❑ Open Waters (check all that apply): ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, complete this table for each wetland area impacted. 2a. Site # 2a1. Impact Reason/Type 2b. Impact Duration 2c. Wetland Type 2d. Wetland Name 2e. Forested ? 2f. Jurisdiction Type 2g. Impact Area (ac) W1 Fill (Incl. Riprap) Permanent Bottomland Hardwood Forest W1 Yes Corps 0.23 W2 Choose one Temp/ Perm Choose one Click to ente, Y/N Choose one Click to enter W3 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W4 Choose one Temp/ Perm Choose one Mick to enter Y/N Choose one Click to enter W5 Choose one Temp/ Perm Choose onE Click to enter Y/I Choose one Click to enter W6 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W7 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W8 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W9 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W10 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W11 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W12 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W13 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W14 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W15 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter 2g1. Total temporary wetland impacts 0 ac 2g2. Total permanent wetland impacts 0.23 ac 2g3. Total wetland impacts 0.23 ac 2h. Type(s) of material being discharged and the amount of each type in cubic yards: Clean material; approximately 560 cy 2i. Comments: Click to enter text. Page 9 of 20 PCN Form - Version 4.2, January31, 2022 3. Stream Impacts If there are perennial or intermittent stream/ tributary impacts (including temporary impacts) proposed on the site, complete this table for all stream/ tributary sites impacted. ** All Perennial or Intermittent streams must be verified by DWR or delegated local government Site # 3a Impact Reason* 3b. Impact Duration 3c. Impact Type 3d. Stream Name 3e. Stream Type 3f. Jurisdiction Type 3g. Stream Width (avg ft) 3h. Impact length (linear ft) S1 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S2 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S3 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S4 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S5 dick to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S6 ;lick to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S7 dick to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S8 dick to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S9 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S10 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S11 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S12 Mick to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S13 Mick to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S14 ;lick to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S15 lick to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S16 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S17 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S18 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S19 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S20 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter 3i1. Total jurisdictional ditch impact: Click to ent linear ft 3i2. Total permanent stream impacts: Click to ent, linear ft M. Total temporary stream impacts: Click to entt linear ft 34. Total stream and ditch impacts: Click to ent, linear ft 3j. Comments: LACK to enter. Page 10 of 20 PCN Form - Version 4.2, January31, 2022 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S., individually list all open water impacts in the table below. 4a. Site #* 4a1. Impact Reason 4b. Impact Duration* 4c. Waterbody Name* 4d. Activity Type* 4e. Waterbody Type* 4f. Impact area (ac)* 01 dick to ent( Temp/ Perm Click to enter. Choose one :hoose one Click to enter. 02 Click to enter. Temp/ Perm Click to enter. Choose one -hoose one Click to enter. 03 dick to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 04 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 05 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 4g. Total temporary open water impacts Click to enter. ac 4g. Total permanent open water impacts Click to enter. ac 4g. Total open water impacts Click to enter. ac 4h. Comments: Click to enter. 5. Pond or Lake Construction If pond or lake construction is proposed, complete the table below. (*This does NOT include offline stormwater management ponds.) 5a. 5b. 5c. 5d. 5e. Pond ID Proposed use or Wetland Impacts (ac) Stream Impacts (ft) Upland # purpose of pond Impacts (ac) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. P2 Choose one Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. ente P3 Choose one Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. ente, 5f. Total Click to Click to Click to Click to Click to Click to Clicl enter. enter. enter. enter. enter. enter. ent 5g. Comments: Click to enter. 5h. Is a dam high hazard permit required? ❑ Yes ❑x No If yes, permit ID no.: Click to enter. 5i. Expected pond surface area (acres): Click to enter. 5j. Size of pond watershed (acres): Click to enter. 5k. Method of construction: Click to enter. Page 11 of 20 PCN Form - Version 4.2, January31, 2022 6. Buffer Impacts (DWR requirement) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts. 6a. Project is in which protected basin(s)? (Check all that apply.) ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Jordan ❑ Goose Creek ❑ Randleman ❑ Other: Click to ente Site #* 6b. Impact Type* 6c. Impact Duration* 6d. Stream Name* 6e. Buffer Mitigation Required?* 6f. Zone 1 Impact* (sq ft) 6g. Zone 2 Impact* (sq ft) B1 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter B2 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter B3 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter B4 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter B5 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B6 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B7 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B8 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B9 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B10 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. 1311 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B12 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B13 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B14 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B15 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B16 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B17 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B18 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B19 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B20 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. 6h. Total temporary impacts: Zone 1: Click to enter sq ft Zone 2: Click to enter. sq ft 6h. Total permanent impacts: Zone 1: Click to enter sq ft Zone 2: Click to enter. sq ft 6h. Total combined buffer impacts: Zone 1: Click to enter sq ft Zone 2: Click to enter. sq ft 6i. Comments: LACK to enter. Please attach supporting documentation (impact maps, plan sheets, etc.) for the proposed project. Page 12 of 20 PCN Form - Version 4.2, January31, 2022 E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts through project design: A multifamily development is necessary to accommodate the influx of new residents to the area. While current zoning allows for 360 units, the developer voluntarily elected to reduce the number of units to 252, a 30% reduction, and construct the minimum number of required parking spaces. These measures (i) reduce wetland impacts to 9% of total wetland area, (ii) decrease impervious area and (iii) allow the majority of wetlands, including the entirety of the jurisdictional stream to remain undisturbed. 1 b. Specifically describe measures taken to avoid or minimize proposed impacts through construction techniques: The impacts are isolated to the wetlands that nearly bisect the site. For this reason, avoidance is not feasible even with the significant reduction to the number of units proposed (360 to 252). Additional measures undertaken to exceed wetland buffer requirements are reflected on the final site plan and include repositioning the clubhouse, pool and street parking depicted on the initial site plan provided in impact map. The construction techniques shall be conducted in accordance with NCDENR standards. Temporary and additional erosion control measures shall be maintained throughout the construction process. Silt fencing will be placed at the bottom of the slopes to deter sediment translocation offsite and control erosion during construction activities. Temporary erosion, sedimentation, and pollution controls will be installed prior to and maintained during the entire construction duration and until final stabilization is established. 2. Compensatory Mitigation for Impacts to Waters of the U.S., Waters of the State, or Riparian Buffers 2a. If compensatory mitigation is required, by whom is it required? ❑ DWR ❑x Corps (check all that apply) 2b. If yes, which mitigation option(s) will be used for this ❑ Mitigation Bank project? (check all that apply) ❑x In Lieu Fee Program ❑ Permittee Responsible Mitigation 3. Complete if using a Mitigation Bank (Must satisfy NC General Statute143-214.11 (d1).) 3a. Name of mitigation bank: Click to enter. 3b. Credits purchased/requested: Type: Non -riparian Wetland Quantity Click to enter. Type: Choose one Quantity Click to enter. Type: Choose one Quantity Click to enter. Attach receipt and/or approval letter. 3c. Comments: Click to enter. 4. Complete if Using an In Lieu Fee Program Page 13 of 20 PCN Form - Version 4.2, January31, 2022 4a. Attach approval letter from in lieu fee program. 4b. Stream mitigation requested: Click to ente linear feet 4c. If using stream mitigation, what is the stream temperature: Choose one NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS website: (Please use the filter and select Wilmington district) https://ribits. usace.army. miI/ribits apex/f?p=107:27:2734709611497::NO: RP:P27 BUTTON KEY:O 4d. Buffer mitigation requested (DWR only): Click to enter. square feet 4e. Riparian wetland mitigation requested: Click to enter. acres 4f. Non -riparian wetland mitigation requested: Click to enter. acres 4g. Coastal (tidal) wetland mitigation requested: Click to enter. acres 4h. Comments: Click to enter. 5. Complete if Providing a Permittee Responsible Mitigation Plan 5a. If proposing a permittee responsible mitigation plan, provide a description of the proposed mitigation plan, including mitigation credits generated. Click to enter 5b. Attach mitigation plan/documentation. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — DWR requirement 6a. Will the project result in an impact within a protected riparian buffer ❑ Yes ❑ No that requires buffer mitigation? If yes, please complete this entire section — please contact DWR for more information. 6b. If yes, identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required in the table below. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 Click to enter. Click to enter. Choose one Slick to enter. Zone 2 ;lick to enter. Click to enter. Choose one Click to enter. 6f. Total buffer mitigation required Click to enter. 6g. If buffer mitigation is required, is payment to a mitigation bank or ❑ Yes ❑ No NC Division of Mitigation Services proposed? 6h. If yes, attach the acceptance letter from the mitigation bank or NC Division of Mitigation Services. 6i. Comments: U11CK io enter. Page 14 of 20 PCN Form - Version 4.2, January31, 2022 F. Stormwater Management and Diffuse Flow Plan (DWR requirement) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers ❑ Yes ❑x No identified within one of the NC Riparian Buffer Protection Rules? 1 b. All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. If the project is subject to a state implemented riparian buffer protection program, include a plan that fully documents how diffuse/dispersed flow will be maintained. All Stormwater Control Measures (SCM) must be designed in accordance with the NC Stormwater Design Manual (https://deg.nc.,qov/about/divisions/energv-mineral-land-resources/energv-mineral-land-Permit- guidance/stormwater-bmp-manual). Associated supplement forms and other documentation must be provided. ❑ Level Spreader What Type of SCM are you ❑ Vegetated Conveyance (lower seasonal high water table- SHWT) providing? ❑ Wetland Swale (higher SHWT) (Check all that apply) ❑ Other SCM that removes minimum 30% nitrogen ❑ Proposed project will not create concentrated stormwater flow through the buffer For a list of options to meet the diffuse flow requirements, click here. Attach diffuse flow documentation. 2. Stormwater Management Plan 2a. Is this an NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? ❑ Yes ❑x No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? ❑ Yes ❑x No To look up low density requirements, click here: http://reports.oah.state. nc.us/ncac/title%2015a%20-%20environmental%20guaIity/chapter%2002%20- %20environmental%20manage ment/subchapter%20h/15a%20ncac%2002h%20.1003.pdf 2c. Does this project have a stormwater management plan (SMP) ❑x Yes ❑ No reviewed and approved under a state stormwater program or state - approved local government stormwater program? ❑ n/a — project disturbs < 1 acre Note: Projects that have vested rights, exemptions, or grandfathering from state or locally implemented stormwater programs or projects that satisfy state or locally -implemented stormwater programs through use of community in -lieu programs should answer "no" to this question. 2d. Which of the following stormwater management program(s) apply? ❑x Local Government (Check all that apply.) ❑ State If you have local government approval, please include the SMP on their overall impact map. ❑x Phase II ❑ USMP Local Government Stormwater Programs ❑ NSW ❑ Water Supply Page 15 of 20 PCN Form - Version 4.2, January31, 2022 Please identify which local government stormwater program you are using. City of New Bern State Stormwater Programs ❑ Phase II ❑ HQW or ORW ❑x Coastal Counties ❑x Other Comments: NCDEQ will review for Neuse NSW Watershed Program Page 16 of 20 PCN Form - Version 4.2, January31, 2022 G. Supplementary Information 1. Environmental Documentation 1 a. Does the project involve an expenditure of public (federal/state/local) ❑ Yes ❑x No funds or the use of public (federal/state) land? * 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental El Yes El No Policy Act (NEPA/SEPA)? * 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the ❑ Yes ❑ No NEPA or SEPA final approval letter.) Comments: Click to enter. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), Federally Non -Jurisdictional Wetlands /Classified Surface Waters ❑ Yes ❑x No (15A NCAC 2H. 1400) DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. If you answered "yes" to the above question, provide an explanation of the violation(s): U11CK to enter. 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby ❑ Yes ❑x No downstream water quality? * 3b. If you answered "no", provide a short narrative description: The proposed development will be confined to the existing property boundary and no plans of expansion or related residential development is anticipated. Future development of surrounding/local properties is unknown at this time. 3c. If yes, provide a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWR policy. (Attach .pdf) 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? * ® Yes ❑ No ❑ N/A Page 17 of 20 PCN Form - Version 4.2, January31, 2022 4b. If yes, describe in detail the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. Wastewater treated at a treatment plant operated by the City of New Bern. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected ® Yes ❑ No species or habitat? (IPAC weblink: htti3s://www.fws.ciov/ii3ac/ ffws.govl) 5b. Have you checked with the USFWS concerning Endangered Species ® Yes ❑ No Act impacts? * 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another federal agency involved? * ❑ Yes ❑x No ❑ Unknown If yes, which federal agency? Click to enter. 5e. Is this a DOT project located within Divisions 1-8? * ❑ Yes ❑x No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? * ® Yes ❑ No 5g. Does this project involve bridge maintenance or removal? * ❑ Yes ❑x No 5g1. If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? Representative photos of signs of bat use ❑ Yes ❑ No can be found in the NLEB SLOPES, Appendix F, pages 3-7. Representative photos of signs of bat use can be found in the NLEB SLOPES, Appendix F, pages 3-7. Link to NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed NLEB-SLOPES&apps.pdf If you answered yes to 5g1, did you discover any signs of bat use? * ❑ Yes ❑ No ❑ Unknown If yes, please show the location of the bridge on the permit drawings/ project plans 5h. Does this project involve the construction/ installation of a wind turbine(s)? * ❑ Yes ❑x No If yes, please show the location of the wind turbine(s) on the permit drawings/ project plans (attach .pdf) 5i. Does this project involve blasting and /or other percussive activities that will be conducted by machines, such as jackhammers, ❑ Yes ❑x No mechanized pile drivers, etc.? * If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property (attach .pdf) 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? * USFWS IPaC and NC NHP. Awaiting USFWS for final concurrence. Attach consultation documentation. 6. Essential Fish Habitat (Corps Requirement) Page 18 of 20 PCN Form - Version 4.2, January31, 2022 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? ❑ Yes ❑x No Is there submerged aquatic vegetation (SAV) around the project vicinity? El Yes ❑x No El Unknown Will this project affect submerged aquatic vegetation? ❑ Yes ❑x No ❑ Unknown Explain: Click to entr 6b. What data source(s) did you use to determine whether your site would impact Essential Fish Habitat? NOAA Essential Fish Habitat Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data): http://-qis.ncdcr.-gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or ❑ Yes ❑x No properties significant in North Carolina history and archaeology)? 7b. What data source(s) did you use to determine whether your site would impact historic or archeological resources? NC HPO Web Survey Mapping. We are awaiting Concurrance from NCSHPO which will be forwarded upon receipt. 7c. Attach historic or prehistoric documentation. 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.,qov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ❑ No 8b. If yes, explain how the project meets FEMA requirements. A portion of the project boundary is situated within the 100-year floodplain, however; as proposed, no construction activity will occur within the 100-year floodplain. 8c. What source(s) did you use to make the floodplain determination? FEMA Flood Map Service Center Mapping and development plans H. Miscellaneous Comments: Click to enter. Attach pertinent documentation or attachments not previously requested Page 19 of 20 PCN Form - Version 4.2, January31, 2022 I. Signature * ❑x By checking the box and signing below, I, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete, to the best of my knowledge and belief; • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time; • The project proponent hereby agrees that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • The project proponent hereby agrees to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • The project proponent hereby understands that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • As the project proponent, I intend to electronically sign and submit the PCN/online form. Full Name: * Jonathan Grubb Signature: * Jonathan Grubb Date: * 7/6/2022 Page 20 of 20 PCN Form - Version 4.2, January31, 2022 w O a` to U U = Z a U) z m = O a O w d Z (P is • ■ L.L 00 N O N R 0 CDw o Z m 2— N LU L�JNLJ M co LL CO y � O w m w LL � o Q a o W o ■ • '� N ■i � • 0 i S • o • r � O ! • o .LO O ■ • ■ r s ■ ■ f so* a • f ff N a o a aLU _ a °} 0 z ui fD Z a CD U)z� U 0) L 0 0 � O m ZLU p QU LL z 0 a LU z N U) O>H o fn w U oar U) a> w m O o p 0 y 0 2 ti fn U a U a ew , 4MF N f � CO LL N °�' m Y � o M u R W U 0 N O � � m a w LL m O w m R o Q- 0 a Ak 0 LO 0 Ln N 0 IV� I -WI :aagwnN iaags Osl =J :ale)s HozU•90 :aje0 00.88b000L1 •aN;aa.1aad X) iaags 01 saajq Z9S8Z `eullo.leD 4laoN `u.1ag M@N `Pnlg •a f 8u1A j@Hlnl ull.leW 'a4 XXXX Al!wixoad all 180L'005'016 d wa)-gasauaq-mmm Eovez )N'ual8ulwl!m I I I alins •peat' p"mise3 810Z hEdwaq g gasaua8 paalltl yosaueq 0UH :asuanl )N d cQ G W Z< 00 F Q 0 U Z O J x 0 z • s IT 3L I III ~ I N l��sl I s= I pI IIs� N II , � a J Z ro LU W LLJ ll� J Q ° m W Z Q a Q � m 00 Q � Q Q m Z J z o Of Q a W w w m zz Z-WI :aagwnN ZgSgZ `eullOJeD HIJON `u.lag M@N ;aa 4$ P^Ig 'af Sul�l aa4}nl ullaeW 'a4 XXXX worooauaq- waa yxauaq mMn fovgz)N'uol2ulwl!M Osl = J :aleos III alins •peat' pooegse3 BIOZ hedwoq g yasauaq paalltl HONDO 00'88b000L1 :aje0 Ali w ixoJ d a yl y o s a u eq Z'X) yaays oy saajq 2 0 Z LL a a J Z Z W 0- F Q W I-- cl� C) C) m N O Q z as W J Q H ii Q : N p $ Z c Q N� W M� W Q J H cl Q m_ Z J H W z Q J >w o >W Of m OUH :asuanl )N W W W = LL av� �U)m moZ oo¢ omm Owm w 1-7 3 ZA EXHIBIT A RO, ECT SUMMARY �46 UNITS ` + 470 PARKS Ms ing lot and garage sitioned on final site in an effort to !ed wetland buffer irements. .K14n x7� w United States Department of the Interior FISH AND WILDLIFE SERVICE } 4m, � ' _ � {{ Raleigh Ecological Services Field Office Post Office Box 33726 Raleigh, NC 27636-3726 Phone: (919) 856-4520 Fax: (919) 856-4556 In Reply Refer To: July 15, 2022 Project Code: 2022-0064255 Project Name: 49-14995 The Proximity at New Bern Subject: List of threatened and endangered species that may occur in your proposed project location or may be affected by your proposed project To Whom It May Concern: The enclosed species list identifies threatened, endangered, proposed and candidate species, as well as proposed and final designated critical habitat, that may occur within the boundary of your proposed project and/or may be affected by your proposed project. The species list fulfills the requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.). If your project area contains suitable habitat for any of the federally -listed species on this species list, the proposed action has the potential to adversely affect those species. If suitable habitat is present, surveys should be conducted to determine the species' presence or absence within the project area. The use of this species list and/or North Carolina Natural Heritage program data should not be substituted for actual field surveys. New information based on updated surveys, changes in the abundance and distribution of species, changed habitat conditions, or other factors could change this list. Please feel free to contact us if you need more current information or assistance regarding the potential impacts to federally proposed, listed, and candidate species and federally designated and proposed critical habitat. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species list should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the ECOS-IPaC website at regular intervals during project planning and implementation for updates to species lists and information. An updated list may be requested through the ECOS-IPaC system by completing the same process used to receive the enclosed list. The purpose of the Act is to provide a means whereby threatened and endangered species and the ecosystems upon which they depend may be conserved. Under sections 7(a)(1) and 7(a)(2) of the Act and its implementing regulations (50 CFR 402 et sea.), Federal agencies are required to utilize their authorities to carry out programs for the conservation of threatened and endangered 07/15/2022 species and to determine whether projects may affect threatened and endangered species and/or designated critical habitat. A Biological Assessment is required for construction projects (or other undertakings having similar physical impacts) that are major Federal actions significantly affecting the quality of the human environment as defined in the National Environmental Policy Act (42 U.S.C. 4332(2) (c)). For projects other than major construction activities, the Service suggests that a biological evaluation similar to a Biological Assessment be prepared to determine whether the project may affect listed or proposed species and/or designated or proposed critical habitat. Recommended contents of a Biological Assessment are described at 50 CFR 402.12. If a Federal agency determines, based on the Biological Assessment or biological evaluation, that listed species and/or designated critical habitat may be affected by the proposed project, the agency is required to consult with the Service pursuant to 50 CFR 402. In addition, the Service recommends that candidate species, proposed species and proposed critical habitat be addressed within the consultation. More information on the regulations and procedures for section 7 consultation, including the role of permit or license applicants, can be found in the "Endangered Species Consultation Handbook" at: http://www.fws.gov/endangered/esa-library/pdf/TOC-GLOS.PDF Migratory Birds: In addition to responsibilities to protect threatened and endangered species under the Endangered Species Act (ESA), there are additional responsibilities under the Migratory Bird Treaty Act (MBTA) and the Bald and Golden Eagle Protection Act (BGEPA) to protect native birds from project -related impacts. Any activity, intentional or unintentional, resulting in take of migratory birds, including eagles, is prohibited unless otherwise permitted by the U.S. Fish and Wildlife Service (50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)). For more information regarding these Acts see https://www.fws.gov/birds/policies-and-regulations.php. The MBTA has no provision for allowing take of migratory birds that may be unintentionally killed or injured by otherwise lawful activities. It is the responsibility of the project proponent to comply with these Acts by identifying potential impacts to migratory birds and eagles within applicable NEPA documents (when there is a federal nexus) or a Bird/Eagle Conservation Plan (when there is no federal nexus). Proponents should implement conservation measures to avoid or minimize the production of project -related stressors or minimize the exposure of birds and their resources to the project -related stressors. For more information on avian stressors and recommended conservation measures see https://www.fws.gov/birds/bird-enthusiasts/threats-to- birds.php. In addition to MBTA and BGEPA, Executive Order 13186: Responsibilities of Federal Agencies to Protect Migratory Birds, obligates all Federal agencies that engage in or authorize activities that might affect migratory birds, to minimize those effects and encourage conservation measures that will improve bird populations. Executive Order 13186 provides for the protection of both migratory birds and migratory bird habitat. For information regarding the implementation of Executive Order 13186, please visit https://www.fws.gov/birds/policies-and-regulations/ executive-orders/e0-13186.php. 07/15/2022 We appreciate your concern for threatened and endangered species. The Service encourages Federal agencies to include conservation of threatened and endangered species into their project planning to further the purposes of the Act. Please include the Consultation Code in the header of this letter with any request for consultation or correspondence about your project that you submit to our office. Attachment(s): • Official Species List • Migratory Birds • Marine Mammals 07/15/2022 Official Species List This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the requirement for Federal agencies to "request of the Secretary of the Interior information whether any species which is listed or proposed to be listed may be present in the area of a proposed action". This species list is provided by: Raleigh Ecological Services Field Office Post Office Box 33726 Raleigh, NC 27636-3726 (919) 856-4520 07/15/2022 2 Project Summary Project Code: 2022-0064255 Event Code: None Project Name: 49-14995 The Proximity at New Bern Project Type: Residential Construction Project Description: Residential Development Project Location: Approximate location of the project can be viewed in Google Maps: https: www.google.com/maps/Q35.093198150000006,-77.11983169512445,14z 1 CiroV louW ROW @rm Counties: Craven County, North Carolina 07/15/2022 Endangered Species Act Species There is a total of 11 threatened, endangered, or candidate species on this species list. Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area. For example, certain fish may appear on the species list because a project could affect downstream species. IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA Fisheriesi, as USFWS does not have the authority to speak on behalf of NOAA and the Department of Commerce. See the "Critical habitats" section below for those critical habitats that lie wholly or partially within your project area under this office's jurisdiction. Please contact the designated FWS office if you have questions. 1. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. Mammals NAME STATUS Northern Long-eared Bat Myotis septentrionalis Threatened No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/9045 West Indian Manatee Trichechus manatus Threatened There is final critical habitat for this species. The location of the critical habitat is not available. This species is also protected by the Marine Mammal Protection Act, and may have additional consultation requirements. Species profile: https:Hecos.fws.gov/ecp/species/4469 Birds NAME STATUS Eastern Black Rail Laterallus jamaicensis ssp. jamaicensis Threatened No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/10477 Red Knot Calidris canutus ru fa Threatened There is proposed critical habitat for this species. The location of the critical habitat is not available. Species profile: https:Hecos.fws.gov/ecp/species/1864 Red -cockaded Woodpecker Picoides borealis Endangered No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/7614 07/15/2022 4 Reptiles NAME American Alligator Alligator mississippiensis No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/776 STATUS Similarity of Appearance (Threatened) Green Sea Turtle Chelonia mydas Threatened Population: North Atlantic DPS There is final critical habitat for this species. The location of the critical habitat is not available. Species profile: https:Hecos.fws.gov/ecp/species/6199 Leatherback Sea Turtle Dermochelys coriacea Endangered There is final critical habitat for this species. The location of the critical habitat is not available. Species profile: https:Hecos.fws.gov/ecp/species/1493 Amphibians NAME STATUS Neuse River Waterdog Necturus lewisi Threatened There is final critical habitat for this species. The location of the critical habitat is not available. Species profile: https:Hecos.fws.gov/ecp/species/6772 Insects NAME STATUS Monarch Butterfly Danaus plexippus Candidate No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/9743 Flowering Plants NAME STATUS Rough -leaved Loosestrife Lysimachia asperulaefolia Endangered No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/2747 Critical habitats THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S JURISDICTION. 07/15/2022 Migratory Birds Certain birds are protected under the Migratory Protection Act2. Bird Treaty Act! and the Bald and Golden Eagle Any person or organization who plans or conducts activities that may result in impacts to migratory birds, eagles, and their habitats should follow appropriate regulations and consider implementing appropriate conservation measures, as described below. 1. The gyratory Birds Treaty Act of 1918. 2. The Bald and Golden Eagle Protection Act of 1940. 3. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a) The birds listed below are birds of particular concern either because they occur on the USFWS Birds of Conservation Concern (BCC) list or warrant special attention in your project location. To learn more about the levels of concern for birds on your list and how this list is generated, see the FAQ below. This is not a list of every bird you may find in this location, nor a guarantee that every bird on this list will be found in your project area. To see exact locations of where birders and the general public have sighted birds in and around your project area, visit the E-bird data mapping tool (Tip: enter your location, desired date range and a species on your list). For projects that occur off the Atlantic Coast, additional maps and models detailing the relative occurrence and abundance of bird species on your list are available. Links to additional information about Atlantic Coast birds, and other important information about your migratory bird list, including how to properly interpret and use your migratory bird report, can be found below. For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impacts to migratory birds on your list, click on the PROBABILITY OF PRESENCE SUMMARY at the top of your list to see when these birds are most likely to be present and breeding in your project area. MKOLVA III BREEDING SEASON American Kestrel Falco sparverius paulus Breeds Apr 1 to This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions Aug 31 (BCRs) in the continental USA https:Hecos.fws.gov/ecp/species/9587 Bald Eagle Haliaeetus leucocephalus Breeds Sep 1 to This is not a Bird of Conservation Concern (BCC) in this area, but warrants attention Jul 31 because of the Eagle Act or for potential susceptibilities in offshore areas from certain types of development or activities. https:Hecos.fws.gov/ecp/species/1626 07/15/2022 BREEDING NAME SEASON Eastern Whip -poor -will Antrostomus voci ferns Breeds May 1 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Aug 20 and Alaska. Prairie Warbler Dendroica discolor Breeds May 1 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Jul 31 and Alaska. Prothonotary Warbler Protonotaria citrea Breeds Apr 1 to This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA Jul 31 and Alaska. Red-headed Woodpecker Melanerpes erythrocephalus Breeds May 10 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Sep 10 and Alaska. Wood Thrush Hylocichla mustelina Breeds May 10 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Aug 31 and Alaska. Probability Of Presence Summary The graphs below provide our best understanding of when birds of concern are most likely to be present in your project area. This information can be used to tailor and schedule your project activities to avoid or minimize impacts to birds. Please make sure you read and understand the FAQ "Proper Interpretation and Use of Your Migratory Bird Report" before using or attempting to interpret this report. Probability of Presence (■) Each green bar represents the bird's relative probability of presence in the 10km grid cell(s) your project overlaps during a particular week of the year. (A year is represented as 12 4-week months.) A taller bar indicates a higher probability of species presence. The survey effort (see below) can be used to establish a level of confidence in the presence score. One can have higher confidence in the presence score if the corresponding survey effort is also high. How is the probability of presence score calculated? The calculation is done in three steps: The probability of presence for each week is calculated as the number of survey events in the week where the species was detected divided by the total number of survey events for that week. For example, if in week 12 there were 20 survey events and the Spotted Towhee was found in 5 of them, the probability of presence of the Spotted Towhee in week 12 is 0.25. 2. To properly present the pattern of presence across the year, the relative probability of presence is calculated. This is the probability of presence divided by the maximum probability of presence across all weeks. For example, imagine the probability of presence in week 20 for the Spotted Towhee is 0.05, and that the probability of presence at week 12 07/15/2022 3 (0.25) is the maximum of any week of the year. The relative probability of presence on week 12 is 0.25/0.25 = 1; at week 20 it is 0.05/0.25 = 0.2. 3. The relative probability of presence calculated in the previous step undergoes a statistical conversion so that all possible values fall between 0 and 10, inclusive. This is the probability of presence score. Breeding Season( ) Yellow bars denote a very liberal estimate of the time -frame inside which the bird breeds across its entire range. If there are no yellow bars shown for a bird, it does not breed in your project area. Survey Effort (1) Vertical black lines superimposed on probability of presence bars indicate the number of surveys performed for that species in the 10km grid cell(s) your project area overlaps. The number of surveys is expressed as a range, for example, 33 to 64 surveys. No Data (—) A week is marked as having no data if there were no survey events for that week. Survey Timeframe Surveys from only the last 10 years are used in order to ensure delivery of currently relevant information. The exception to this is areas off the Atlantic coast, where bird returns are based on all years of available data, since data in these areas is currently much more sparse. ■ probability of presence breeding season I survey effort — no data SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC American Kestrel "+— +Q„ ,++' ++++ ++++ +++ ++++ +++� �`oo +++"'+"'+� BCC - BCR NONE r000 �NN�� Bald Eagle +-4- Non -BCC 111+ 1111 111111d, "11 1111 ++++ "i01 + IN IN IN Vul wailsl ern Whip -Poor- +—+++1 ++++ ++++ + + ++ + + JJJ+ ++++ + ++ -- BCC Rangewide NONE NONE01 (CON) Prairie Warbler +++ ++++ ++,+ + ++ ++++ ++++ ++ BCC Rangewide ■ ■■'� (CON) Prothonotary �� ���"� ���� Warbler +—+— ++++ ++++,+++ ++++ ++++ ++++ ++++ ++++ ++++ --+— � 4- BCC Rangewide (CON) Red-headed +—+— ++++ ++++,+,+ 11++ 1++1 1i11 1+11'++' ++++ --+— ---+ Woodpecker 07/15/2022 0 BCC Rangewide (CON) Wood Thrush BCC Rangewide I I I I 1111 1111 1111 1111 I I I Jill (CON) Additional information can be found using the following links: • Birds of Conservation Concern haps://www.fws.gov/program/migratory-birds/species • Measures for avoiding and minimizing impacts to birds https://www.fws.gov/librgg/ collections/avoiding-and-minimizing-incidental-take-migratory • Nationwide conservation measures for birds https://www.fws.gov/sites/default/files/ documents/nationwide-standard-conservation-measures.Ddf Migratory Birds FAQ Tell me more about conservation measures I can implement to avoid or minimize impacts to migratory birds. Nationwide Conservation Measures describes measures that can help avoid and minimize impacts to all birds at any location year round. Implementation of these measures is particularly important when birds are most likely to occur in the project area. When birds may be breeding in the area, identifying the locations of any active nests and avoiding their destruction is a very helpful impact minimization measure. To see when birds are most likely to occur and be breeding in your project area, view the Probability of Presence Summary. Additional measures or permits may be advisable depending on the type of activity you are conducting and the type of infrastructure or bird species present on your project site. What does IPaC use to generate the migratory birds potentially occurring in my specified location? The Migratory Bird Resource List is comprised of USFWS Birds of Conservation Concern (BCQ and other species that may warrant special attention in your project location. The migratory bird list generated for your project is derived from data provided by the Avian Knowledge Network (AKN). The AKN data is based on a growing collection of survey, banding_, and citizen science datasets and is queried and filtered to return a list of those birds reported as occurring in the 10km grid cell(s) which your project intersects, and that have been identified as warranting special attention because they are a BCC species in that area, an eagle (Eagle Act requirements may apply), or a species that has a particular vulnerability to offshore activities or development. Again, the Migratory Bird Resource list includes only a subset of birds that may occur in your project area. It is not representative of all birds that may occur in your project area. To get a list of all birds potentially present in your project area, please visit the AKN Phenology Tool. What does IPaC use to generate the probability of presence graphs for the migratory birds potentially occurring in my specified location? 07/15/2022 The probability of presence graphs associated with your migratory bird list are based on data provided by the Avian Knowledge Network (AKN). This data is derived from a growing collection of survey, banding, and citizen science datasets . Probability of presence data is continuously being updated as new and better information becomes available. To learn more about how the probability of presence graphs are produced and how to interpret them, go the Probability of Presence Summary and then click on the "Tell me about these graphs" link. How do I know if a bird is breeding, wintering, migrating or present year-round in my project area? To see what part of a particular bird's range your project area falls within (i.e. breeding, wintering, migrating or year-round), you may refer to the following resources: The Cornell Lab of Ornithology All About Birds Bird Guide, or (if you are unsuccessful in locating the bird of interest there), the Cornell Lab of Ornithology Neotropical Birds guide. If a bird on your migratory bird species list has a breeding season associated with it, if that bird does occur in your project area, there may be nests present at some point within the timeframe specified. If "Breeds elsewhere" is indicated, then the bird likely does not breed in your project area. What are the levels of concern for migratory birds? Migratory birds delivered through IPaC fall into the following distinct categories of concern: 1. "BCC Rangewide" birds are Birds of Conservation Concern (BCC) that are of concern throughout their range anywhere within the USA (including Hawaii, the Pacific Islands, Puerto Rico, and the Virgin Islands); 2. "BCC - BCR" birds are BCCs that are of concern only in particular Bird Conservation Regions (BCRs) in the continental USA; and 3. "Non -BCC - Vulnerable" birds are not BCC species in your project area, but appear on your list either because of the Eagle Act requirements (for eagles) or (for non -eagles) potential susceptibilities in offshore areas from certain types of development or activities (e.g. offshore energy development or longline fishing). Although it is important to try to avoid and minimize impacts to all birds, efforts should be made, in particular, to avoid and minimize impacts to the birds on this list, especially eagles and BCC species of rangewide concern. For more information on conservation measures you can implement to help avoid and minimize migratory bird impacts and requirements for eagles, please see the FAQs for these topics. Details about birds that are potentially affected by offshore projects For additional details about the relative occurrence and abundance of both individual bird species and groups of bird species within your project area off the Atlantic Coast, please visit the Northeast Ocean Data Portal. The Portal also offers data and information about other taxa besides birds that may be helpful to you in your project review. Alternately, you may download the bird model results files underlying the portal maps through the NOAA NCCOS Integrative Statistical Modeling and Predictive Mapping of Marine Bird Distributions and Abundance on the Atlantic Outer Continental Shelf project webpage. 07/15/2022 Bird tracking data can also provide additional details about occurrence and habitat use throughout the year, including migration. Models relying on survey data may not include this information. For additional information on marine bird tracking data, see the Diving Bird Study and the nanotag studies or contact Caleb Spiegel or Pam Lorin. What if I have eagles on my list? If your project has the potential to disturb or kill eagles, you may need to obtain a permit to avoid violating the Eagle Act should such impacts occur. Proper Interpretation and Use of Your Migratory Bird Report The migratory bird list generated is not a list of all birds in your project area, only a subset of birds of priority concern. To learn more about how your list is generated, and see options for identifying what other birds may be in your project area, please see the FAQ "What does IPaC use to generate the migratory birds potentially occurring in my specified location". Please be aware this report provides the "probability of presence" of birds within the 10 km grid cell(s) that overlap your project; not your exact project footprint. On the graphs provided, please also look carefully at the survey effort (indicated by the black vertical bar) and for the existence of the "no data" indicator (a red horizontal bar). A high survey effort is the key component. If the survey effort is high, then the probability of presence score can be viewed as more dependable. In contrast, a low survey effort bar or no data bar means a lack of data and, therefore, a lack of certainty about presence of the species. This list is not perfect; it is simply a starting point for identifying what birds of concern have the potential to be in your project area, when they might be there, and if they might be breeding (which means nests might be present). The list helps you know what to look for to confirm presence, and helps guide you in knowing when to implement conservation measures to avoid or minimize potential impacts from your project activities, should presence be confirmed. To learn more about conservation measures, visit the FAQ "Tell me about conservation measures I can implement to avoid or minimize impacts to migratory birds" at the bottom of your migratory bird trust resources page. 07/15/2022 Marine Mammals Marine mammals are protected under the Marine Mammal Protection Act. Some are also protected under the Endangered Species Act! and the Convention on International Trade in Endangered Species of Wild Fauna and Flora. The responsibilities for the protection, conservation, and management of marine mammals are shared by the U.S. Fish and Wildlife Service [responsible for otters, walruses, polar bears, manatees, and dugongs] and NOAA Fisheries3 [responsible for seals, sea lions, whales, dolphins, and porpoises]. Marine mammals under the responsibility of NOAA Fisheries are not shown on this list; for additional information on those species please visit the Marine Mammals page of the NOAA Fisheries website. The Marine Mammal Protection Act prohibits the take of marine mammals and further coordination may be necessary for project evaluation. Please contact the U.S. Fish and Wildlife Service Field Office shown. 1. The Endangered Species Act (ESA) of 1973. 2. The Convention on International Trade in Endangered Species of Wild Fauna and Flora (CITES) is a treaty to ensure that international trade in plants and animals does not threaten their survival in the wild. 3. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. 1►/G11►L hI West Indian Manatee Trichechus manatus Species profile: https://ecos.fws.gov/ecp/species/4469 07/15/2022 IPaC User Contact Information Agency: ECS Southeast LLP Name: Michelle Measday Address: 5260 Greens Dairy Road City: Raleigh State: NC Zip: 27616 Email mmeasday@ecslimited.com Phone: 9198619910 6/30/22, 12:35 PM EFH Report EFH Data Notice EFH Mapper Report Essential Fish Habitat (EFH) is defined by textual descriptions contained in the fishery management plans developed by the regional fishery management councils. In most cases mapping data can not fully represent the complexity of the habitats that make up EFH. This report should be used for general interest queries only and should not be interpreted as a definitive evaluation of EFH at this location. A location -specific evaluation of EFH for any official purposes must be performed by a regional expert. Please refer to the following links for the appropriate regional resources. Southeast Regional Office Atlantic Highly Migratory Species Management Division Query Results Degrees, Minutes, Seconds: Latitude = 35' 5' 34" N, Longitude = 78' 52' 47" W Decimal Degrees: Latitude = 35.093, Longitude =-77.120 The query location intersects with spatial data representing EFH and/or HAPCs for the following species/management units. EFH Lifestage(s) Data Species/Management Management Link Caveats Unit Found at Council FMP Location ] Bluefish Juvenile Mid -Atlantic Bluefish Atlantic Mackerel, ] Atlantic Butterfish Adult Mid -Atlantic Squid,& Butterfish Amendment 11 Larvae Summer Flounder, ]0 Summer Flounder Juvenile Mid -Atlantic Scup, Black Sea Bass Adult Salmon EFH No Pacific Salmon Essential Fish Habitat (EFH) were identified at the report location. HAPCs No Habitat Areas of Particular Concern (HAPC) were identified at the report location. EFH Areas Protected from Fishing No EFH Areas Protected from Fishing (EFHA) were identified at the report location. https://www.habitat.noaa.gov/apps/efhmapper/efhreport/ 1 /2 6/30/22, 12:35 PM EFH Report Spatial data does not currently exist for all the managed species in this area. The following is a list of species or management units for which there is no spatial data. "For links to all EFH text descriptions see the complete data inventory: open data inventory --> South Atlantic Shrimp EFH, Brown Shrimp, Pink Shrimp, Rock Shrimp, White Shrimp, South Atlantic Dolphin Wahoo EFH, Wahoo, South Atlantic Sargassum EFH, Sargassum, South Atlantic HAPCs, Coastal Migratory Pelagics, Golden Crab, Sargassum, Secretarial EFH, Bigeye Sand Tiger Shark, Bigeye Sixgill Shark, Caribbean Sharpnose Shark, Galapagos Shark, Narrowtooth Shark, Sevengill Shark, Sixgill Shark, Smooth Hammerhead Shark, Smalltail Shark https://www.habitat.noaa.gov/apps/efhmapper/efhreport/ 2/2 a� o a w m LL o N Y m z Y Q w o LO cnZ)0 X C C wC14 ;; Z U ❑ a) LLJ Q LL N D wL U Q w 0Q N x H a pQ LLN Um '^ m LU LL V co •• (�j 0 LL M m 0 w m W L= c w Q _ 3 o w o x ti a R a (j a 1 0 CD CD r • 1+ p1�s. N Q a� �+ M v'p� (V o N N d [v 4, s a n7l .� , ti {, j O O 601 WN N- +Y LO cn SD�>w [V w a o` o m nr a w LU Ln CD 0 r7 q7 P80 9 C60 L co N co O O LL o- O N U N N � -2 co co co co J co T- co O Gi �C co co = -a O = -a co N 0 O O O 0 Q > J i O m LL >+ a O LL N O o O Q' O +J Qi r co 0 a� C 0 a� U C E U co C U a� -J q'�' - - Q U m O N N °O a? U ° a 0 �c U) o O o 'a U LL O a a�i U) cn co cn O L tL O O LL c a c 0 U o O Q-' O 2 Q E LL = o O a N a- LL U U) Q' U) Q O LL }� 0 a- 0 "` J ^V+J W 0 C 0 4 w- J LL J LL N SAW-2021-02250 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2021-02250 County: Craven U.S.G.S. Quad: NC -New Bern NOTIFICATION OF JURISDICTIONAL DETERNIINATION Requestor: Cape Fear Four, LLC c/o Mr. Bill Schoettelkotte Address: 1051 Military Cutoff Road, Suite 200 Wilmington, North Carolina 28405 Telephone Number: 910-880-0063 E-mail: bill(kap efearcommercial. com Size (acres) 28.33 Nearest Town New Bern Nearest Waterway Trent River River Basin Neuse USGS HUC 03020204 Coordinates Latitude: 35.093277 Longitude:-77.119836 Location description: The review area is comprised of several parcels adiacent to the property addressed 4115 Dr. M.L.K. Jr. Boulevard in New Bern, NC. Parcel Index Numbers: 8-207-209; 8-207-213; 8-207-228; 8-207-258; 8-207-237. Indicate Which of the Following Apply: A. Preliminary Determination ® There annear to be waters, including wetlands on the above described nroiect area/nronerty, that may be subiect to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters, including wetlands have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. The approximate boundaries of these waters are shown on the enclosed delineation map dated 2/21/2022. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an annealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may reauest an annroved JD. which is an annealable action. by contacting the Corns district for further instruction. ❑ There appear to be waters, including wetlands on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters, including wetlands have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHA jurisdiction over all of the waters, including wetlands at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters, including wetlands on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination ❑ There are Navigable Waters of the United States within the above described project area/property subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are waters, including wetlandson the above described project area/property subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ We recommend you have the waters, including wetlands on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. ❑ The waters, including wetlands on your project area/property have been delineated and the delineation has been verified by the Corps. The approximate boundaries of these waters are shown on the enclosed delineation map dated DATE. We strongly SAW-2021-02250 suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. ❑ The waters, including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below onDATE. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are no waters of the U.S., to include wetlands, present on the above described project area/property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Emily B. Thompson at (910)251-4629 or Emily.B.Thompson(&usace.army.mil. C. Basis For Determination: See the preliminary iurisdictional determination form dated 5/13/2022. D. Remarks: None. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Mr. Philip A. Shannin Administrative Appeal Review Officer 60 Forsyth Street SW, Floor M9 Atlanta, Georgia 30303-8803 AND PHILIP.A. SHANNIN(&USACE.ARMY.MIL In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by Not applicable. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** j�J. J � Corps Regulatory Official: r Date of JD: 5/13/2022 Expiration Date of JD: Not applicable SAW-2021-02250 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Copy furnished (via email): Agent: ECS Southeast, LLP Mr. Jonathan Dale Grubb Address: 6714 Netherlands Drive Wilmington, North Carolina 28405 Telephone Number: 919-861-9859 E-mail: JGrubb(&ecslimited.com 0 p WWN } wwo Opp d' F Z N y WW a..1 N (n Z J 7 Q ::j W W 0� co U l m O Q R= LL, W i U Z U N w Z K~ W O W W p W Z p W 2 O > � w O O viz W W = O m 0 i (j) Daa�i 0 Z W (n FQ(nN m y Q 0 R F W W W W o = " (L mom C Z: a �i4..F �. coQ 1 40 3: oo ��_� � N r a li OL ( d Q • u r. acoi co �. Q co (0 (0 � C C N N O O d d d N 00 m O N a w CO t NI- a)U y � O D m LL a 10 u m 0 w m W LL 3 o o a N N O LL v■ NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Cave Fear Four. LLC, c/o Mr. Bill File Number: SAW-2021-02250 Date: 5/13/2022 Schoettelkotte Attached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D ❑X PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at or hllp://www.usace.army.miUMissions/CivilWorks/RegulatoryProgramandPermits.aspx or the Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. Nor - SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division MR. PHILIP A. SHANNIN Attn: Emily B. Thompson ADMINISTRATIVE APPEAL REVIEW OFFICER Washington Regulatory Office CESAD-PDS-O U.S Army Corps of Engineers 60 FORSYTH STREET SOUTHWEST, FLOOR M9 2407 West Fifth Street ATLANTA, GEORGIA 30303-8803 Washington, North Carolina 27889 PHONE: (404) 562-5136; FAX (404) 562-5138 EMAIL: PHILIP.A.SHANNIN(aUSACE.ARMY.MIL RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15-day notice of any site investigation, and will have the opportunit to participate in all site investi ations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Emily B. Thompson, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Philip Shannin, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: 12/27/2021 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Cape Fear Four, LLC, c/o Mr. Bill Schoettelkotte, 1051 Military Cutoff Road, Suite 200, Wilmington, North Carolina 28405 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, 4115 Dr. M.L.K. Jr. Blvd / Kariblue, LLC / Craven County, SAW-2021-02250 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: The review area is comprised of several parcels adjacent to the property addressed 4115 Dr. M.L.K. Jr. Boulevard in New Bern, NC. Parcel Index Numbers: 8-207-209; 8-207-213; 8-207-228; 8-207-258; 8-207-237 (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County: Craven City: New Bern Center coordinates of site (lat/long in degree decimal format): Latitude: 35.093277 Longitude:-77.119836 Universal Transverse Mercator: 18 Name of nearest waterbody: Trent River E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ❑ Office (Desk) Determination. Date: ®Field Determination. Date(s): February 16th and March 22nd TABLE OF AQUATIC RESOURCES IN REVIEWAREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION Estimated Geographic amount of Type of authority to aquatic aquatic which the Latitude Longitude resource in resource (i.e. aquatic "may Site Number (decimal (decimal review area wetland vs. resource degrees) degrees) (acreage and non -wetland be subject linear feet, if waters) (i.e., Section applicable) 404 or Section 10/404 SAW-2021- 35.091763 -77.1195 844 feet Non -wetland Section 404 Tributarywaters ,02250 SAW-2021- 02250 Wetlands 35.091917 -77.11968 2.89 acres Wetland Section 404 1. The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre- construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AID constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items are included in the administrative record and are appropriately cited: ®Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: ECS Southeast, LLP Map: Figure 6: Potential Wetlands and Waters of the U.S. Man ®Data sheets prepared/submitted by or on behalf of the PJD requestor. Datasheets: ® Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: ❑Corps navigable waters' study: ®U.S. Geological Survey Hydrologic Atlas: ® USGS NHD data: USACE National Regulatory Viewers — SAD — NC ❑USGS 8 and 12 digit HUC maps: ® U.S. Geological Survey map(s). Cite scale & quad name: Figure 2 ®Natural Resources Conservation Service Soil Survey. Citation: Craven County 1996 ® National wetlands inventory map(s). Cite name: Figure 4; USACE National Regulatory Viewers — SAD — NC ❑ State/local wetland inventory map(s): ® FEMA/FIRM maps: Figure 5; USACE National Regulatory Viewers — SAD — NC ❑ 100-year Floodplain Elevation is: ® Photographs: ® Aerial (Name & Date): (National Geodetic Vertical Datum of 1929) or ® Other (Name & Date): ECS nhotolog El Previous determination(s). File no. and date of response letter: ®Other information (please specify): Gen2 LiDAR IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later Jurisdictional determinations. /,) 4 wwiJ. )�- Signature and date of Regu atory staff member completing PJD 5/13/2022 Signature and date of person requesting PJD (REQUIRED, unless obtaining the signature is impracticable)1 1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action.