HomeMy WebLinkAboutNCC213690_NOT Closeout Documents_20221021JOHNSTON COUNTY PUBLIC UTILITY DEPARTMENT
SEDIMENTATION INSPECTION REPORT
309 E. MARKET STREET, SMITHFIELD, N C 27577-TELEPHONE (919) 209-8333
Inspection Information
Date: 10/4/2022
Type of Inspection
❑ Initial Inspection
Construction Stage
❑ Pre -Construction
Date of Inspection: 10/4/2022
❑ Routine Site Inspection
❑ Initial Grading
Inspection by: Shannon Stanley
❑ On -Site Meeting
❑ Infrastructure
El Progress Inspection
El Temp, Site Stabilization
Others Present: Click or tap here to enter
❑X Final Inspection
ElVertical
tee
❑ Plat Inspection
❑X Final Site Stabilization
Photos: ❑ Yes ❑X No
❑ Spot Check Inspection
❑ Complaint Inspection
Weather and Site Conditions:
Click or tap here to enter text.
Development/Owner Information
Project Name: HWY 55- Mcgees
Project Number: 21-018-P
Project Location: Insert Project Location.
This Report Sent To: matt(atrackwestpartners.com
Email: Click or tap here to enter text.
❑ File Copy
Land Owner of Record:
Person Financially Responsible for Land Disturbing
Insert Land Owner.
Activity: ❑ Same as owner
6. Comments/Notes:
The erosion control permit for HWY 55-Mcgees is now closed.