Loading...
HomeMy WebLinkAboutNCC213690_NOT Closeout Documents_20221021JOHNSTON COUNTY PUBLIC UTILITY DEPARTMENT SEDIMENTATION INSPECTION REPORT 309 E. MARKET STREET, SMITHFIELD, N C 27577-TELEPHONE (919) 209-8333 Inspection Information Date: 10/4/2022 Type of Inspection ❑ Initial Inspection Construction Stage ❑ Pre -Construction Date of Inspection: 10/4/2022 ❑ Routine Site Inspection ❑ Initial Grading Inspection by: Shannon Stanley ❑ On -Site Meeting ❑ Infrastructure El Progress Inspection El Temp, Site Stabilization Others Present: Click or tap here to enter ❑X Final Inspection ElVertical tee ❑ Plat Inspection ❑X Final Site Stabilization Photos: ❑ Yes ❑X No ❑ Spot Check Inspection ❑ Complaint Inspection Weather and Site Conditions: Click or tap here to enter text. Development/Owner Information Project Name: HWY 55- Mcgees Project Number: 21-018-P Project Location: Insert Project Location. This Report Sent To: matt(atrackwestpartners.com Email: Click or tap here to enter text. ❑ File Copy Land Owner of Record: Person Financially Responsible for Land Disturbing Insert Land Owner. Activity: ❑ Same as owner 6. Comments/Notes: The erosion control permit for HWY 55-Mcgees is now closed.