Loading...
HomeMy WebLinkAboutNCC215343_NOT Closeout Documents_20221020North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Wake Project: Baytree Lane Natural Gas Main River basin: Neuse Person financially responsible: Public Service of NC, Inc. -Andrew Moore, Project #: WAKE-2022-021 Director, Engineering & Construction Address: 800 Gaston Road, Building A, PO Box 1398 (28056), 1. Project Location: 209 Sandhurst Road, Bartons Creek Pictures: No Township 2. Weather and soil conditions: sunny, dry, workable Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): no one Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: October 10, 2022 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Kimberly Summers Others present: Date of inspection: October 05, 2022 Time arriving on site: 1:40 PM Time leaving site: 1:50 PM cc: