HomeMy WebLinkAboutNC0021229_Modified Short Term Monitoring Plan_20221025Town of Old Fort
-FOUNDED IN 1873-
38 CATAWBA AVENUE
OLD FORT, NORTH CAROLINA 28762
828-668-4244
October 21, 2022
Keys McGee
NCDEQ/DWR
Municipal Permitting Unit
Pretreatment
1611 Mail Service Center
Raleigh, NC 27699-1611
Dear Mr. McGee:
Attached are the Town of Old Forts updated industrial pre-treatment sampling plan modifications
for short term monitoring plan (STMP). This submission is for the upcoming 2023 head works
analysis with sampling to occur at the wastewater treatment facility and two local breweries,
Hillman brewery and Whaley Farm Brewery.
The only minor revisions the Town has changed is the wastewater treatment plant no longer land
applies bio-solids and now is taking all bio-solids to the area land fill Caldwell County landfill
and is hauled by Republic Services. Because of no -longer land applying, the Sampling of the
digestive bio solids is no
longer required.
The only other change is the addition of Whaley Farm Brewery which has just opened July 2022.
The first STMP sampling shall begin in the fourth quarter of 2022 with an anticipation date the
second week of November and further quarterly sampling shall follow until third quarter of
2023.
Sincerely,
Josh Cagle
Town of Old Fort WWTP
38 Catawba Ave
Old Fort, NC 28762
jcagle@oldfortnc.com
W: 828-668-4561
C: 828-655-6755
TOWN OF OLD FORT WWTP - NCO021229
PRETREATMENT PROGRAM (MODIFIED)
SHORT TERM MONITORING PLAN (STMP)
ACTIVATED SLUDGE/ AEROBIC DIGESTER WITH
BIORESIDUALS LANDFILLED
SAMPLING FREQUENCY
SAMPLING POINT
lWithin one year before HWA:
1— INFLUENT
QUARTERLY
2—EFFLUENT
QUARTERLY
3—ACTIVATED
ONCE
SLUDGE TANK
SLUDGE NOT
SLUDGE TO LANDFILL FOR
SAMPLED
DISPOSAL
4, 5--SIU's
PER SIU PERMIT AND ONCE
(Hillman, Whaley
PER YEAR FOR POC's
Farm
Influent and effluent will be sampled for 4 quarters to coincide with
Chronic Toxicity testing (usually the first full week of the month.)
TOWN OF OLD FORT WWTP - NCO021229
PRETREATMENT PROGRAM (MODIFIED)
SHORT TERM MONITORING PLAN (STMP)
ACTIVATED SLUDGE/ AEROBIC DIGESTER WITH
BIORESIDUALS LANDFILLED
SAMPLING PLAN:
P_O.C.
JPT. 1
I PT. 2
1 PT. 3
1
1 PTA
PT. S
As
x
x
X
X
X
Cd
X
x
x
x
X
Cr
x
X
x
X
x
Cu
X
x
X
X
X
Pb
X
X
x
X
x
Hg
x
x
x
x
x
Mb
x
x
X
X
X
Ni
x
x
x
X
x
Se
x
x
x
X
x
Act
x
x
x
x
x
Zn
X
x
x
X
X
CN
X
x
X
X
x
FLOW
x
X
X
% SOLIDS
BOD
X
X
X
x
TSS
X
X
x
X
X
NH3
x
X
x
x
X
CHLORIDE
X
X
X
x
x
Sampling Points
PT.1 - Influent
PT. 2 - Effluent
PT. 3 -Activated Sludge
PT. 4 - Hillman
PT. 5 - Whaley Farm
TOWN OF OLD FORT WWTP - NCO02129
PRETREATMENT PROGRAM (MODIFIED)
SHORT TERM MONITORING PLAN (STMP)
ACTIVATED SLUDGE/ AEROBIC DIGESTER WITH BIORESIDUALS
LANDFILLED
PRACTICAL QUANTITATION LEVEL PQL AND SAMPLING METHOD
P.O.C.
PQL, m9jI
ISAMPLING METHOD
As
0.002
24 HOUR COMPOSITE
Cd
0.001
24 HOUR COMPOSITE
Cr
0.005
24 HOUR COMPOSITE
Cu
0.002
124 HOUR COMPOSITE
Pb
0.002
24 HOUR COMPOSITE
Hg
0.0002
24 HOUR COMPOSITE
Mb
0.01
24 HOUR COMPOSITE
Ni
0.002
24 HOUR COMPOSITE
Se
0.001
24 HOUR COMPOSITE
Act
0.001
24 HOUR COMPOSITE
Zn
0.01
24 HOUR COMPOSITE
CN
0.01
GRAB
FLOW
NIA
% SOLIDS
NIA
NIA
BOO
2
24 HOUR COMPOSITE
TSS
2
24 HOUR COMPOSITE
NH3
0.1 124
HOUR COMPOSITE
CHLORIDE
1 124
HOUR COMPOSITE
* Effluent (sampling point 2) mercury samples require EPA method 1631
with a detection limit of 0.000001 mg/L ( 1 ng/L).
TOWN OF OLD FORT WWTP - NG002129
PRETREATMENT PROGRAM (MODIFIED) SHORT
TERM MONITORING PLAN (STMP)
ACTIVATED SLUDGE/ AEROBIC DIGESTER WITH
BIORESIDUALS LANDFILLED
STMP -DIAGRAM:
4&6-SIIJ'S
pump station eration tank
influent ualization .2 MG
n1c
.S MG
3
ndfill for disposal
12 contact
hamber
�2
receiving stream- Curtis Creek