Loading...
HomeMy WebLinkAbout20221150 Ver 1_Updated Impact Table_20221013 Page 9 of 20 PCN Form Version 4.3- April 20, 2022 D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project (check all that apply): ☒ Wetlands ☒ Streams - tributaries ☐ Buffers ☐ Open Waters ☐ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, complete this table for each wetland area impacted. 2a. Site #* 2a1. Impact Reason/Type* 2b. Impact Duration* 2c. Wetland Type* 2d. Wetland Name* 2e. Forested ?* 2f. Jurisdiction Type* 2g. Impact Area (ac)* W1 Grading Permanent Seep W1 No Both 0.004 W2 Grading Permanent Seep W2 No Both 0.292 W3 Other Permanent Seep W2 No Both 0.081 W4 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W5 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W6 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W7 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W8 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W9 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W10 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W11 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W12 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W13 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W14 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W15 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter 2g1. Total temporary wetland impacts Click to enter. ac 2g2. Total permanent wetland impacts 0.377 ac 2g3. Total wetland impacts 0.377 ac 2h. Type(s) of material being discharged and the amount of each type in cubic yards: Click to enter text. 2i. Comments: Wetland type: Emergent seep wetlands. See Holly Branch Restoration Project Area Wetland Survey document for additional information on the proposed impacts. W1 and W2 grading impacts for increased floodplain access will not result in a loss of wetlands. W3 conversion impact will convert wetland area to stream area. Page 10 of 20 PCN Form Version 4.3- April 20, 2022 3. Stream Impacts If there are perennial or intermittent stream/ tributary impacts (including temporary impacts) proposed on the site, complete this table for all stream/ tributary sites impacted. ** All Perennial or Intermittent streams must be verified by DWR or delegated local government Site #* 3a Impact Reason* 3b. Impact Duration* 3c. Impact Type* 3d. Stream Name* 3e. Stream Type* 3f. Jurisdiction Type* 3g. Stream Width (avg ft) * 3h. Impact length (linear ft) * S1 Restoration Permanent Restoration/ Enhancement Holley Branch Perennial Both 9 875 S2 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S3 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S4 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S5 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S6 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S7 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S8 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S9 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S10 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S11 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S12 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S13 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S14 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S15 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S16 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S17 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S18 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S19 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S20 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter 3i1. Total jurisdictional ditch impact: Click to enter. linear ft 3i2. Total permanent stream impacts: 875 linear ft 3i3. Total temporary stream impacts: Click to enter. linear ft 3i4. Total stream and ditch impacts: 875 linear ft 3j. Comments: See included plan set for details