Loading...
HomeMy WebLinkAbout20191233 Ver 3_ePCN Application_20221021 DW R mrlsloa of ware.Besourcrs Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13,2022 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. Pre-Filing Meeting Date Request was submitted on: 2/3/2021 BIMS#Assigned* Version#* 20191233 3 Is a payment required for this project?* No payment required What amout is owed?* Fee received $240.00 Fee needed-send electronic notification $570.00 Reviewing Office* Select Project Reviewer* Central Office-(919)707-9000 Rob Ridings:eads\rgridings Information for Initial Review 1a.Name of project: Crabtree Creek Greenway-Lindsay Drive to Ebenezer Church Rd. 1a.Who is the Primary Contact?* Lisa Schiffbauer,City of Raleigh 1 b.Primary Contact Email:* 1c.Primary Contact Phone:* parkplan@raleighnc.gov (919)996-4785 Date Submitted 10/21/2022 Nearest Body of Water Crabtree Creek,Richland Creek Basin Neuse Water Classification QNSW Site Coordinates Latitude: Longitude: 35.842792 -78.714409 A. Processing Information County(or Counties)where the project is located: Wake Is this a NCDMS Project Yes No Is this project a public transportation project?* Yes No Is this a NCDOT Project?* Yes No 1a.Type(s)of approval sought from the Corps: Section 404 Permit(wetlands,streams and waters,Clean Water Act) Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No Please provide the date of the previous submission." 3/5/2021 1 b.What type(s)of permit(s)do you wish to seek authorization? Nationwide Permit(NWP) Regional General Permit(RGP) Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit(NWP)Number: 14-Linear transportation NWP Numbers(for multiple NWPS): 1d.Type(s)of approval sought from the DWR: 401 Water Quality Certification-Regular 401 Water Quality Certification-Express Non-404 Jurisdictional General Permit Riparian Buffer Authorization Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f.Is this an after-the-fact permit application?" Yes No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? Yes No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? Yes No 1 h.Is the project located in any of NC's twenty coastal counties? Yes No 1j.Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d.Who is applying for the permit? Owner Applicant(other than owner) le.Is there an Agent/Consultant for this project?" Yes No 2.Owner Information 2a.Name(s)on recorded deed: City of Raleigh,NC 2b.Deed book and page no.: 2c.Contact Person: Lisa Schiffbauer,Engineering Supervisor of Capital Improvements 2d.Address Street Address 222 W.Hargett Street Address Line 2 Suite 601 City State/Province/Region Raleigh NC Postal/Zip Code Country 27601 USA 2e.Telephone Number: 2f.Fax Number: (919)996-4785 2g.Email Address:" parkplan@raleighnc.gov 4.Agent/Consultant(if applicable) 4a.Name: David G.Cooper 4b.Business Name: VHS 4c.Address Street Address Venture 1,940 Main Campus Drive Address Line 2 Suite 500 City State I Province/Region Raleigh NC Postal/Zip Code Country 27606 USA 4d.Telephone Number: 4e.Fax Number: (919)741-5784 4f.Email Address:* dcooper@vhb.com C. Project Information and Prior Project History 1.Project Information 1 b.Subdivision name: (if appropriate) 1c.Nearest municipality/town: Raleigh 2.Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address Multiple,easements obtained Address Line 2 City State/Province/Region Postal/Zip Code Country 3. Surface Waters 3a.Name of the nearest body of water to proposed project: Crabtree Creek,Richland Creek 3b.Water Resources Classification of nearest receiving water:* QNSW 3c. What river basin(s)is your project located in?* Neuse 3d.Please provide the 12-digit HUC in which the project is located. 030202010803 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project area is a forested riparian corridor surrounded by residential development and a Hanson Aggregates quarry.Portions of the project area also include maintained sewer easements. The City of Raleigh has been in contact with NCDEQ regarding protection of the greenway trail from erosion caused by an existing stormwater discharge from an adjacent lot,as well as minimizing the potential for sedimentation to Richland Creek from this discharge.Revisions to the project design in this area including addition of a 24"pipe under the greenway and additional riprap stabilization required recalculations of stream and buffer impacts. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past? Yes No Unknown If yes,please give the DWR Certification number or the Corps Action ID(exp.SAW-0000-00000). DWR:20191233 USACE:SAW-2017-00269 4f.List the total estimated acreage of all existing wetlands on the property: 1.946 4g.List the total estimated linear feet of all existing streams on the property: 9,935 4h.Explain the purpose of the proposed project:" The project will construct a greenway trail between Lindsay Drive and Ebenezer Church Road. 41.Describe the overall project in detail,including indirect impacts and the type of equipment to be used: The project has been previously described in detail in prior submittals,and has not changed since the Version 2 approval. The proposed design change to add the pipe under the greenway trail will protect the trail from undercutting due to stormwater flow.The additional riprap will reduce stormwater velocity and protect the adjacent bank of Richland Creek from erosion. 5. Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: SAW-2017-00269 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): David Cooper,Ed Hajnos Agency/Consultant Company: VHB(formerly Ecological Engineering) Other: 5d.List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR USACE site visit date:Nov.29,2016,Tasha Alexander.No PJD letter received to date.NCDWR site visit date:10/31/2016,Stephanie Goss.Please see attached NCDWR determination letter. 6.Future Project Plans 6a.Is this a phased project?* Yes No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): Wetlands Streams-tributaries Buffers Open Waters Pond Construction 2.Wetland Impacts 2a1 Reason(?) 2b.Impact type*(?) 2c.Type of W. 2d.W.name 2e.Forested 2f.Type of Jurisdicition" 2g.Impact i area 11 18"HDPE P Headwater Forest WI Yes Both 0.008 (acres) 11 Mechanized clearing P Headwater Forest WI Yes Both 0.003 (acres) 13 Mechanized clearing P Hardwood Flat WH Yes Both 0.001 acres) 2g.Total Temporary Wetland Impact 2g.Total Permanent Wetland Impact 0.000 0.012 2g.Total Wetland Impact 0.012 21.Comments: No changes to wetland impacts since the Version 2 approval. 3. Stream Impacts L 3a.Reason for impact 3b.lmpact type* 3c.Type of impact* 3d.S.name* �3e.Stream Type* 3f.Type of 3g.S.width 3h.Impact (?) Jurisdiction* length* S1 Riprap 18"HDPE outlet Permanent Bank Stabilization Fdrawi7ngsite reek(permit Perennial Both 70 1) Average(feet) (linearfeet) g2 Riprap ditch outlet Permanent Bank Stabilization SB(permit drawing site 2) Perennial Both 4 11 Average(feet) (linearfeet) S3 Riprap ditch outlet Temporary Bank Stabilization SB(permit drawing site 2) Perennial Both 23 Average(feet) (linearfeet) S4 Boardwalk crossing Permanent Bank Stabilization Richland Creek(permit Perennial Both 45 40 drawing site 3) Average(feet) (linearfeet) S5 Both Boardwalk crossing Temporary Bank Stabilization Richland Creek(permit Perennial 45 34 drawing site 3) Average(feet) near reef) S6 Boardwalk crossing Permanent Bank Stabilization Richland Creek(permit Perennial Both 40 38 drawing site 4) Average(feet) (linearfeet) g7 Boardwalk crossing Temporary Bank Stabilization Richland Creek(permit Perennial Both 40 29 draWing site 4) Average(feet) (linearfeet) S8 Boardwalk crossing Permanent Bank Stabilization J SC(permit drawing site 5) Perennial Both 21 Average(feet) (linearfeet) gg Boardwalk crossing Temporary Bank Stabilization J SC(permit drawing site 5) Perennial Both 8 42 Average(feet) (linearfeet) �01 Boardwalk crossing Permanent Bank Stabilization Richland Creek(permit Perennial Both 40 28 drawing site 6) Average(feet) (linearfeet) S71 Boardwalk crossing Temporary Bank Stabilization Richland Creek(permit Perennial Both 40 27 dra wing site 6) Average(feet) pinearfeet) F2]�Riprap 18"HDPE out Permanent Bank Stabilization Crabtree Creek(permit Perennial Both 50 11 drawing site 7) Average(feet) (linear feeQ �13 �Riprap 36"HDPE out Permanent Bank Stabilization Crabtree Creek(permit Perennial Both 60 22 drawing site 8) Average(feeQ pinear teat) F4]�Riprap ditch outlet Permanent Bank Stabilization Fdra tree Creek(permit Perennial Both 70 ing site 9) Average(feet) (linearfeet) S15 Riprap 18"HDPE out Permanent Bank Stabilization Crabtree Creek(permit Perennial Both 70 13 drawing site 10) Average(feet) (linear feeQ �61�Riprap 18"HDPE out Permanent Bank Stabilization Crabtree Creek(permit Perennial Both 70 13 drawing site 12) Average(feeQ pinearfeet) S17 Riprap 15"HDPE out Permanent Bank Stabilization Crabtree Creek(permit Perennial Both 70 12 drawing site 14) Average(feet) (linearfeet) g1g Riprap 24"HDPE outlet Permanent Bank Stabilization Richland Creek(permit Perennial Both 40 10 drawing site 15) Average(feet) (linearfeet) 3i.Total jurisdictional ditch impact in square feet: 0 31.Total permanent stream impacts: 31.Total temporary stream impacts: 235 155 31.Total stream and ditch impacts: 390 3j.Comments: Corrected a typo for SC from 11 to 21 LF of permanent bank stabilization impact(S8 in above table). Added the bank stabilization impact that resulted from the design change(S18 in above table). 6. Buffer Impacts (for DWR) 6a.Project is in which protect basin(s)? Check all that apply. Neuse Tar-Pamlico Catawba Randleman Goose Creek Jordan Lake Other 6b.Impact Type 6c.Per or Temp 6d.Stream name Se.Buffer mitigation required? 6f.Zone 1 impact 6g.Zone 2 impact Site 1,Allowable P Crabtree Creek No 2,733 4,635 Site 2,Allowable P Crabtree Creek No 10,045 11 12,124 Site 3,Allowable P Crabtree Creek No 4,729 4,563 Site 4,Allowable P Richland Creek No 4,012 10,924 Site 5,Allowable P Richland Creek No 11,889 13,610 Site 6,Allowable P Richland Creek No 5,214 6,483 Site 7,Allowable P Richland Creek No 4,068 4,839 Site 8,Allowable P Crabtree Creek No 17,484 15,614 Site 9,Allowable P Crabtree Creek No 6,549 12,160 Site 10,Allowable P Crabtree Creek No 20,654 15,625 Site 11,Allowable P SG No 473 1,279 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 87,850.00 101,856.00 Zone 1 Zone 2 Total combined buffer impacts: 87,850.00 101,856.00 6i.Comments: Added 416 SF of impact to Site 5 Zone 2. E. Impact Justification and Mitigation 1.Avoidance and Minimization la.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The project design is constrained by the steep topography of the slopes above Crabtree and Richland Creeks.Bridges have been designed in order to minimize impacts to the stream bed.Boardwalks are utilized to cross tributary streams.Wetland impacts have been almost entirely avoided.Where feasible,the trail has been designed to utilize existing cleared sewer easements. 1 b.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Erosion control has been designed to adhere to the design standards for sensitive watersheds.The contractor shall be responsible for minimizing impacts through construction techniques.Boardwalks will be constructed using the"top-down"method,which minimizes disturbance. 2.Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? Yes No 2b.If this project DOES NOT require Compensatory Mitigation,explain why: Impacts to Neuse riparian buffers for greenway projects are allowable if no practicable alternative exists.The steepness of the topography makes alternative routes impracticable. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No What type of SCM are you providing? Level Spreader Vegetated Conveyance(lower SHWT) Wetland Swale(higher SHWT) Other SCM that removes minimum 30%nitrogen Proposed project will not create concentrated stormwater flow through the buffer 2. Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* Yes No 2b.Does this project meet the requirements for low density projects as defined in 15A NCAC 02H.1003(2)? Yes No Comments: G. Supplementary Information 1. Environmental Documentation la.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* Yes No 1 b.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPA/SEPA)?* Yes No Comments:* The project is a City of Raleigh project,with environmental review/oversight by NCDOT. 2.Violations (DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(I SA NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality? Yes No 3b.If you answered"no,"provide a short narrative description. The greenway trail is not expected to catalyze additional development in the area. 4. Sewage Disposal (DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5c.If yes,indicate the USFWS Field Office you have contacted. Raleigh 5d.Is another Federal agency involved?* Yes No Unknown What Federal Agency is involved? FEMA 5e.Is this a DOT project located within Division's 1-8? Yes No 5f.Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g.Does this project involve bridge maintenance or removal? Yes No 5h.Does this project involve the construction/installation of a wind turbine(s)?* Yes No 51.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.? Yes No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS previously concurred with effect determinations for the prior two approved submittals.All species have determinations of No Effect or Not Likely to Adversely Affect based on survey results in the project area.Surveys for protected aquatic species were conducted,and no specimens were found. An updated IPaC species list for the project study area,reviewed on 1 0/1 712 0 2 2,did not include any bat species. 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat? Yes No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat? NOAA fisheries EFH mapper. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* NC SHPO letter is provided in the attachment. 8. Flood Zone Designation (Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8b.If yes,explain how project meets FEMA requirements: An approved CLOMR has been obtained for the project. 8c.What source(s)did you use to make the floodplain determination?* NC FIRM 3720078600J(NC panel 0786) Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document Supporting Information_CrabtreeWestVer3.pdf 150.68MB File must be PDF or KMZ Comments Attachment includes updated construction drawings showing the current project configuration and changes,including voided sheets.These construction drawings are in review by the City of Raleigh,pending final approval.If construction drawings change again resulting in impact increases,an update will be provided. Signature * By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief';and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: David G.Cooper Signature 06�1 4-0�&Avewt Date 10/21/2022