Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout20141237 Ver 1_Application_20141203 STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
PAT L. MCCRORY ANTHONY J. TATA
GOVERNOR SECRETARY
November 25, 2014
NC Division of Water Resources
Transportation Permitting Unit
1650 Mail Service Center,
Raleigh, NC 27699-1650
ATTN: Mr. Rob Ridings
NCDOT Coordinator
Dear Sir:
Subject: Notice of Use of Section 404 Nationwide Permit No. 3, Application for a
Section 401 Water Quality Certification and Neuse River Riparian Buffer
Authorization for the proposed replacement of Bridge No. 119 over Little
Contentnea Creek on SR 1531 in Wilson County. Federal Aid Project No. BRZ-
1531(5), TIP No. B-4681, Debit $240 from WBS Element 38465.1.2
The North Carolina Department of Transportation (NCDOT) proposes to replace the 35-foot, 2-
span Bridge No. 119 with a 55-foot, single-span bridge on the existing alignment. Traffic will
follow an offsite detour during construction. Permanent impacts to jurisdictional resources
include < 0.01 acre of excavation and fill.
Please see enclosed copies of the Pre-Construction Notification (PCN), permit drawings,
stormwater management plan, and design plans for the above referenced project. The
Categorical Exclusion (CE) was completed in June 2014. Copies were distributed shortly
thereafter. Additional copies are available upon request.
This project calls for a letting date of April 21, 2015 and a review date of March 3, 2015. The
project schedule may be advanced if funding becomes available.
Regulatory Approvals
Section 404 Permit: Under current design, a Nationwide Permit 3 is applicable for the
jurisdictional impacts associated with this project. Neither written notification to nor written
concurrence from the USACE is required. NCDOT will comply with all conditions and
descriptions in the attached Permit Drawings, 404 General Conditions, and 401 Standard
Conditions. A permit modification may be required if any of the above conditions and
descriptions cannot be met.
MAILING ADDRESS:
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS
1548 MAIL SERVICE CENTER
RALEIGH NC 27699-1548
TELEPHONE: 919-707-6000
FAX: 919-250-4224
WEBSITE: WWW.NCDOT.GOV/DOH/PRECONSTRUCT/PE/
LOCATION:
CENTURY CENTER, BUILDING A
1000 BIRCH RIDGE DRIVE
RALEIGH NC 27610
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1a. Type(s) of approval sought from the
Corps: Section 404 Permit Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: 3 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? Yes No
1d. Type(s) of approval sought from the DWQ (check all that apply):
401 Water Quality Certification – Regular Non-404 Jurisdictional General Permit
401 Water Quality Certification – Express Riparian Buffer Authorization
1e. Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification:
Yes No
For the record only for Corps Permit:
Yes No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
Yes No
1g. Is the project located in any of NC’s twenty coastal counties. If yes, answer 1h
below.
Yes No
1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No
2. Project Information
2a. Name of project: Replacement of Bridge No. 119 over Little Contentnea on SR 1531
2b. County: Wilson Co.
2c. Nearest municipality / town: Fountain
2d. Subdivision name: not applicable
2e. NCDOT only, T.I.P. or state
project no: B-4681
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. not applicable
3c. Responsible Party (for LLC if
applicable): not applicable
3d. Street address: 1598 Mail Service Center
3e. City, state, zip: Raleigh, NC 27699-1598
3f. Telephone no.: (919) 707-6156
3g. Fax no.: (919) 250-4224
3h. Email address: tstanton@ncdot.gov
Office Use Only:
Corps action ID no. _____________
DWQ project no. _______________
Form Version 1.3 Dec 10 2008
1
4. Applicant Information (if different from owner)
4a. Applicant is: Agent Other, specify:
4b. Name: not applicable
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name: not applicable
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
2
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): not applicable
1b. Site coordinates (in decimal degrees): Latitude: 34.6538 Longitude: - 77.7014
(DD.DDDDDD) (-DD.DDDDDD)
1c. Property size: 1.10 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
proposed project: Little Contentnea
2b. Water Quality Classification of nearest receiving water: C;Sw, NSW
2c. River basin: Neuse
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application: Existing conditions at the site include maintained/disturbed roadside shoulder and forested areas. Land use
in the project vicinity is predominantly forested with some agriculture, and light residential development.
3b. List the total estimated acreage of all existing wetlands on the property: 0.50
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 110
3d. Explain the purpose of the proposed project: To replace a structurally deficient bridge
3e. Describe the overall project in detail, including the type of equipment to be used:
The project involves replacing a 35-foot, 2-span bridge with a 55-foot, single-span bridge on the existing alignment. Traffic
will be detoured off-site during construction. Standard road building equipment, such as trucks, dozers, and cranes will be
used.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
Comments: JD Packet was sent to USACE on 01 June 2011
Yes No Unknown
4b. If the Corps made the jurisdictional determination, what type
of determination was made? Preliminary Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known): Lance Fontaine
Agency/Consultant Company: NCDOT
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past? Yes No Unknown
5b. If yes, explain in detail according to “help file” instructions.
6. Future Project Plans
6a. Is this a phased project? Yes No
6b. If yes, explain.
3
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
Wetlands Streams - tributaries Buffers
Open Waters Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number –
Permanent (P) or
Temporary (T)
2b.
Type of impact
2c.
Type of wetland
(if known)
2d.
Forested
2e.
Type of jurisdiction
(Corps - 404, 10
DWQ – non-404, other)
2f.
Area of impact
(acres)
Site 1 P T Fill Riverine Yes
No
Corps
DWQ < 0.01
Site 1 P T Excavation Riverine Yes
No
Corps
DWQ < 0.01
Site 2 P T Yes
No
Corps
DWQ
Site 3 P T Yes
No
Corps
DWQ
Site 3 P T Yes
No
Corps
DWQ
2g. Total wetland impacts
< 0.01
Permanent
0.00 Temporary
2h. Comments: There will be 0.02 ac of hand clearing in wetlands and proposed temporary impacts to wetlands of < 0.01 acre
of temporary fill in wetlands in the hand clearing areas for the installation of erosion control measures, including temporary silt
fence and/or special sediment control fence.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number -
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial
(PER) or
intermittent
(INT)?
3e.
Type of
jurisdiction
(Corps - 404, 10
DWQ – non-404,
other)
3f.
Average
stream
width
(feet)
3g.
Impact length
(linear feet)
Site 4 P T PER
INT
Corps
DWQ
Site 4 P T PER
INT
Corps
DWQ
Site 4 P T PER
INT
Corps
DWQ
Site 4 P T PER
INT
Corps
DWQ
3h. Total stream and tributary impacts 0.00 Perm
0.00 Temp
3i. Comments:
4
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
Open water
impact number –
Permanent (P) or
Temporary (T)
4b.
Name of
waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody type
4e.
Area of impact (acres)
O1 P T Little
Contentnea Fill Stream < 0.01
O1 P T Little
Contentnea Fill Stream < 0.01
O2 P T
O3 P T
4f. Total open water impacts < 0.01 Permanent
< 0.01 Temporary
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below.
5a.
Pond ID
number
5b.
Proposed use or
purpose of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded Filled Excavat
ed Flooded Filled Excavated Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
Yes No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
5
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer
impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a.
Project is in which protected basin?
Neuse Tar-Pamlico Other:
Catawba Randleman
6b.
Buffer impact
number –
Permanent (P) or
Temporary (T)
6c.
Reason for impact
6d.
Stream name
6e.
Buffer
mitigation
required?
6f.
Zone 1 impact
(square feet)
6g.
Zone 2 impact
(square feet)
B1 P T Bridge Little
Contentnea
Yes
No 142 0
B2 P T Roadway Little
Contentnea
Yes
No 314 203
B3 P T Yes
No
6h. Total buffer impacts 456 203
6i. Comments:
6
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
The proposed bridge is 20 feet longer than the existing bridge. The removal of existing road fill for longer bridge and
increasing bridge openings will improve hydrological conveyance and wildlife passage, and reduce bridge opening
velocities.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Construction will be top-down. Best Management Practices for the Protection of Surface Waters, as well as, Best
Management Practices for Construction and Maintenance Activities, and Design Standards for Sensitive Watersheds will
be implemented.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
Yes No
If no, explain:
2b. If yes, mitigation is required by (check all that apply): DWQ Corps
2c. If yes, which mitigation option will be used for this
project?
Mitigation bank
Payment to in-lieu fee program
Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: not applicable
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: warm cool cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
7
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) – required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
Yes No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone
6c.
Reason for impact
6d.
Total impact
(square feet)
Multiplier
6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
8
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rules?
Yes No
1b. If yes, then is a diffuse flow plan included? If not, explain why.
Comments: Yes No
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? N/A
2b. Does this project require a Stormwater Management Plan? Yes No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
See attached permit drawings and stormwater management plan.
2e. Who will be responsible for the review of the Stormwater Management Plan?
Certified Local Government
DWQ Stormwater Program
DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government’s jurisdiction is this project? not applicable
3b. Which of the following locally-implemented stormwater management programs
apply (check all that apply):
Phase II
NSW
USMP
Water Supply Watershed
Other:
3c. Has the approved Stormwater Management Plan with proof of approval been
attached?
Yes No
4. DWQ Stormwater Program Review
4a. Which of the following state-implemented stormwater management programs apply
(check all that apply):
Coastal counties
HQW
ORW
Session Law 2006-246
Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? Yes No N/A
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes No N/A
5b. Have all of the 401 Unit submittal requirements been met? Yes No N/A
9
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1a. Does the project involve an expenditure of public (federal/state/local) funds or the
use of public (federal/state) land? Yes No
1b. If you answered “yes” to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
Yes No
1c. If you answered “yes” to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.)
Comments:
Yes No
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
or Riparian Buffer Rules (15A NCAC 2B .0200)?
Yes No
2b. Is this an after-the-fact permit application? Yes No
2c. If you answered “yes” to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
additional development, which could impact nearby downstream water quality?
Yes
No
3b. If you answered “yes” to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered “no,” provide a short narrative description.
Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby
land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
not applicable
10
(V
e
r
s
i
o
n
1
.
2
;
R
e
l
e
a
s
e
d
S
e
p
t
e
m
b
e
r
2
0
1
1
)
B-
4
6
8
1
Co
u
n
t
y
(
i
e
s
)
:
WI
L
S
O
N
Page 1of 1
Pr
o
j
e
c
t
T
y
p
e
:
D
a
t
e
:
Ph
o
n
e
:
Ph
o
n
e
:
Em
a
i
l
:
Em
a
i
l
:
Co
u
n
t
y
(
i
e
s
)
:
CA
M
A
C
o
u
n
t
y
?
De
s
i
g
n
/
F
u
t
u
r
e
:
Ex
i
s
t
i
n
g
:
Su
p
p
l
e
m
e
n
t
a
l
:
Pr
i
m
a
r
y
:
LI
T
T
L
E
C
O
N
T
E
N
T
N
E
A
C
R
E
E
K
Ne
u
s
e
27
-
8
6
-
2
6
CR
L
E
W
I
S
2
@
N
C
D
O
T
.
G
O
V
Tw
o
l
a
n
e
r
o
a
d
w
a
y
w
i
t
h
t
w
o
1
1
'
t
r
av
e
l
l
a
n
e
s
w
i
t
h
5
'
s
h
o
u
l
d
e
r
a
n
d
8'
w
i
t
h
g
u
a
r
d
r
a
i
l
.
T
w
o
l
a
n
e
r
o
a
d
w
a
y
w
i
t
h
t
w
o
1
0
'
t
r
a
v
e
l
l
a
n
e
s
a
n
d 3' paved shoulders.
Ne
u
s
e
NC
D
W
Q
S
t
r
e
a
m
I
n
d
e
x
N
o
.
:
Pr
o
j
e
c
t
/
T
I
P
N
o
.
:
NC
D
O
T
C
o
n
t
a
c
t
:
Pr
o
j
e
c
t
N
o
.
:
B-
4
6
8
1
Co
n
t
r
a
c
t
o
r
/
D
e
s
i
g
n
e
r
:
PA
T
K
I
N
S
O
N
@
N
C
D
O
T
.
G
O
V
Ge
n
e
r
a
l
P
r
o
j
e
c
t
I
n
f
o
r
m
a
t
i
o
n
Ad
d
r
e
s
s
:
10/2/2014
10
2
0
B
I
R
C
H
R
I
D
G
E
R
D
.
RA
L
E
I
G
H
,
N
C
2
7
6
1
0
RA
L
E
I
G
H
,
N
C
2
7
6
1
0
No
r
t
h
C
a
r
o
l
i
n
a
D
e
p
a
r
t
m
e
n
t
o
f
T
r
a
n
s
p
o
r
t
a
t
i
o
n
Hi
g
h
w
a
y
S
t
o
r
m
w
a
t
e
r
P
r
o
g
r
a
m
S
T
O
R
M
W
A
T
E
R
M
A
N
A
G
E
M
E
N
T
P
L
A
N
FO
R
L
I
N
E
A
R
R
O
A
D
W
A
Y
P
R
O
J
E
C
T
S
PA
U
L
A
T
K
I
N
S
O
N
,
P
E
BR
I
D
G
E
R
E
P
L
A
C
E
M
E
N
T
ac.
Ge
n
e
r
a
l
P
r
o
j
e
c
t
N
a
r
r
a
t
i
v
e
:
B-
4
6
8
1
i
s
t
h
e
p
l
a
n
n
e
d
r
e
p
l
a
c
e
m
e
n
t
o
f
b
r
i
d
g
e
1
1
9
i
n
W
i
l
s
o
n
C
o
u
n
t
y
.
M
i
n
i
m
a
l
l
a
n
e
w
i
d
e
n
i
n
g
i
s
p
l
a
n
n
e
d
i
n
t
h
e
i
m
m
e
d
i
a
t
e
v
i
c
i
n
i
t
y
o
f
t
h
e
b
r
i
d
g
e
r
e
p
l
a
c
e
m
e
n
t
.
T
h
e
p
r
o
j
e
c
t
d
o
e
s
l
i
e
wi
t
h
i
n
t
h
e
N
e
u
s
e
R
i
v
e
r
B
a
s
i
n
a
n
d
N
e
u
s
e
B
u
f
f
e
r
R
u
l
e
s
d
o
a
p
p
l
y
.
T
h
e
s
t
r
u
c
t
u
r
e
o
v
e
r
L
i
t
t
l
e
C
o
n
t
en
t
n
e
a
C
r
e
e
k
w
i
l
l
b
e
a
s
i
n
g
l
e
s
p
a
n
2
1
"
C
o
r
e
d
S
l
a
b
s
t
r
u
c
t
u
r
e
w
i
t
h
a
t
o
t
a
l
l
e
n
g
t
h
o
f
55
'
.
T
h
e
p
r
o
p
o
s
e
d
s
t
r
u
c
t
u
r
e
w
i
l
l
r
e
q
u
i
r
e
t
h
e
e
x
c
a
v
a
t
i
o
n
o
f
m
a
t
e
r
i
al
u
n
d
e
r
t
h
e
e
x
i
s
t
i
n
g
s
t
r
u
c
t
u
r
e
f
o
r
t
h
e
p
u
r
p
o
s
e
s
o
f
f
u
t
u
r
e
i
n
sp
e
c
t
i
o
n
s
.
N
o
d
r
a
i
n
a
g
e
s
t
r
u
c
t
u
r
e
s
a
r
e
p
r
o
p
o
s
e
d
f
o
r
th
i
s
p
r
o
j
e
c
t
a
n
d
a
n
y
c
o
n
c
e
n
t
r
a
t
e
d
f
l
o
w
c
o
m
i
n
g
f
r
o
m
t
h
e
s
t
r
u
c
t
u
r
e
i
s
n
e
g
l
i
g
i
b
l
e
a
n
d
d
o
e
s
n
o
t
e
x
c
e
e
d
0
.
1
C
F
S
.
D
i
t
c
h
e
s
h
a
v
e
b
e
e
n
eliminated from the majority of the project to
pr
o
m
o
t
e
s
h
e
e
t
f
l
o
w
a
n
d
p
r
e
v
e
n
t
c
o
n
c
e
n
t
r
a
t
e
d
f
l
o
w
f
r
o
m
c
o
m
i
n
g
i
n
t
o
t
h
e
b
u
f
f
e
r
s
.
I
n
t
h
e
N
o
r
t
h
e
a
s
t
e
r
n
q
u
a
d
r
a
n
t
o
f
t
h
e
p
r
o
j
e
c
t
,
a
di
t
c
h
w
a
s
u
s
e
d
t
o
c
o
n
t
i
n
u
e
e
x
i
s
t
i
n
g
d
r
a
i
n
a
g
e
pa
t
t
e
r
n
s
,
a
n
d
w
a
s
d
a
y
l
i
g
h
t
e
d
p
r
i
o
r
t
o
d
r
a
i
n
i
n
g
t
o
t
h
e
w
e
t
l
a
n
d
s
.
T
he
r
e
s
u
l
t
i
n
g
f
l
o
w
w
a
s
d
i
s
p
e
r
s
e
d
p
r
i
o
r
t
o
r
e
a
c
h
i
n
g
t
h
e
b
u
f
f
e
r
s
.
Ty
p
i
c
a
l
C
r
o
s
s
S
e
c
t
i
o
n
D
e
s
c
r
i
p
t
i
o
n
:
Re
f
e
r
e
n
c
e
s
135
0.
5
3
Av
e
r
a
g
e
D
a
i
l
y
T
r
a
f
f
i
c
(
v
e
h
/
h
r
/
d
a
y
)
:
ac
.
Ot
h
e
r
S
t
r
e
a
m
C
l
a
s
s
i
f
i
c
a
t
i
o
n
:
CH
R
I
S
T
O
P
H
E
R
R
.
L
E
W
I
S
,
P
E
Ci
t
y
/
T
o
w
n
:
91
9
-
7
0
7
-
6
7
1
4
10
2
0
B
I
R
C
H
R
I
D
G
E
R
D
.
Ad
d
r
e
s
s
:
91
9
-
7
0
7
-
6
7
0
7
WI
L
S
O
N
No
NC
D
W
Q
S
u
r
f
a
c
e
W
a
t
e
r
C
l
a
s
s
i
f
i
c
a
t
i
o
n
f
o
r
P
r
i
m
a
r
y
R
e
c
e
i
v
i
n
g
W
a
t
e
r
30
3
(
d
)
I
m
p
a
i
r
m
e
n
t
s
:
Ri
v
e
r
B
a
s
i
n
(
s
)
:
Pr
i
m
a
r
y
R
e
c
e
i
v
i
n
g
W
a
t
e
r
:
Bu
f
f
e
r
R
u
l
e
s
i
n
E
f
f
e
c
t
Pr
o
j
e
c
t
D
e
s
c
r
i
p
t
i
o
n
Su
r
r
o
u
n
d
i
n
g
L
a
n
d
U
s
e
:
Sw
a
m
p
a
n
d
F
a
r
m
l
a
n
d
0.
1
0
30
0
0.
5
3
Pr
o
j
e
c
t
B
u
i
l
t
-
U
p
o
n
A
r
e
a
(
a
c
.
)
Pr
o
p
o
s
e
d
P
r
o
j
e
c
t
E
x
i
s
t
i
n
g
S
i
t
e
Pr
o
j
e
c
t
L
e
n
g
t
h
(
l
i
n
.
M
i
l
e
s
o
r
f
e
e
t
)
:
W
E
T
L
A
N
D
A
N
D
S
T
R
E
A
M
I
M
P
A
C
T
S
S
I
T
E
1
EN
G
L
I
S
H
S
H
E
E
T
1
O
F
7
P
E
R
M
I
T
D
R
A
W
I
N
G
R:\Hydraulics\PERM ITS_Environm ental\Drawings\PERM IT IM PACTS\1-B4681_Hyd_prm _wet_TSH.dgncrlewis29/23/2014
DTV ======%%MPH ADTADT% *
I
N
C
O
M
P
L
E
T
E
P
L
A
N
S
D
O
N
O
T
U
S
E
F
O
R
R
/
W
A
C
Q
U
I
S
I
T
I
O
N
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
W
I
L
S
O
N
C
O
U
N
T
Y
000PROFILE (HORIZONTAL)
B
R
Z
-
1
5
3
1
(
5
)
B
R
Z
-
1
5
3
1
(
5
)
P
R
O
J
E
C
T
L
E
N
G
T
H
R
I
G
H
T
O
F
W
A
Y
D
A
T
E
:
L
E
T
T
I
N
G
D
A
T
E
:
ST
A
T
E
S
T
A
T
E
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
S
T
A
T
E
P
R
O
J
.
N
O
.
F
.
A
.
P
R
O
J
.
N
O
.
DE
S
C
R
I
P
T
I
O
N
N
O
.
T
O
T
A
L
S
H
E
E
T
S
N
.
C
.
SH
E
E
T
1
DESIGN DATA
P
r
e
p
a
r
e
d
i
n
t
h
e
O
f
f
i
c
e
o
f
:
S
I
G
N
A
T
U
R
E
:
S
I
G
N
A
T
U
R
E
:
P
.
E
.
P
.
E
.
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
2
0
1
2
S
T
A
N
D
A
R
D
S
P
E
C
I
F
I
C
A
T
I
O
N
S
P
R
O
J
E
C
T
E
N
G
I
N
E
E
R
P
R
O
J
E
C
T
D
E
S
I
G
N
E
N
G
I
N
E
E
R
GRAPHIC SCALES PLANSPROFILE (VERTICAL)
H
Y
D
R
A
U
L
I
C
S
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
O
A
D
W
A
Y
D
E
S
I
G
N
L
O
C
A
T
I
O
N
:
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
000$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAM E$$$$
1
0
0
0
B
i
r
c
h
R
i
d
g
e
D
r
.
,
R
a
l
e
i
g
h
N
C
,
2
7
6
1
0
CONTRACT:TIP PROJECT:B-4681
ARTMEN
N
A
S
O
H
DEP
T
O
F
T
R
A
S
P
OR
T
T
IO N
T
ATE
O
F
N
R
T
C
AROLINA
VICINITY MAPDETOUR Swamp Shackleford AlbertSaraMooreAtkinsonGeorgeFriendlyAspen GrovePopEastCityForkRd.Rd.SmokehousePineyGroveChurchRd.Rd.ScarboroughPl.Cardy Ct.LenfersCt.School ArrowHeadPl.1532 1531 1531153015791534152615261573157215711550153315701571ChurchPiney Grove264A264130713081309131013061306130812291228122912301231130
3
1
3
1
2
1
3
1
1
1226 1260 1259 1310BYNUM RD SCHOOL HOUSE RD STRICKLAND RDSPRING BRANCH CHURCH RD CRAFT RDN WILSON STN MAIN STREET EXTRAILROAD STREET EXT WHITLEY ST GALLOWAY RD
BELL RD
APPIE RDAppie Churc
h
1
2
3
5
123
2
1
2
3
2
1233
DunnRd.
Bell
Rd.
Allen
R
d
.
Rd.
B
ell
Rd.
Bell
Rd.
Stantonsburg
Moseley St.Jam
e
s
1
2
3
1
1
2
3
1
B
R
I
D
G
E
1
1
9
1
2
0
0
1579 26450’100’25’50’50’100’10’20’25’50’10’5’JenkinsCrossroads
E
N
D
T
I
P
P
R
O
J
E
C
T
B
-
4
6
8
1
R
E
K
H
A
P
A
T
E
L
,
P
.
E
.
Gay2015SUBREGIONAL TIER 60
N
O
V
E
M
B
E
R
2
1
,
2
0
1
4
PROJECT Rd.1353002035 55 12 8* TTST =4%DUAL =4%
4
B
-
4
6
8
1
P
E
3
8
4
6
5
.
1
.
2
-
L
-
P
O
T
S
T
A
.
1
8
+
5
0
.
0
0
-L- POT
S
T
A
.
1
3
+
0
0
.
0
0
L
E
N
G
T
H
R
O
A
D
W
A
Y
L
E
N
G
T
H
S
T
R
U
C
T
U
R
E
T
O
T
A
L
L
E
N
G
T
H
O
F
M
I
.
M
I
.
M
I
.
T
I
P
P
R
O
J
E
C
T
B
-
4
6
8
1
T
I
P
P
R
O
J
E
C
T
B
-
4
6
8
1
T
I
P
P
R
O
J
E
C
T
B
-
4
6
8
1
=
0
.
0
9
3
=
0
.
0
1
1
=
0
.
1
0
4
TO US 264
T
O
N
C
2
2
2
Walstonburg WILSON COUNTYGREENE COUNTY 22222
2
CreekAYCOCK RD.MERCER RD.MERCER RD.Rd.CRAFT RD.1306 Galloway13041227PITT COUNTY
CreekCarolina and Northwestern Railway LittleContentneaBEGIN
T
I
P
P
R
O
J
E
C
T
B
-
4
6
8
1
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
L
ITTLE
CONTENTNEA
CREEK
S
R
1
5
3
1
E
A
G
L
E
C
R
O
S
S
R
D
.
K
-
L
-
B
R
I
A
N
R
O
B
I
N
S
O
N
3
8
4
6
5
.
2
.
1
See Sheet 1A For Index of SheetsSee Sheet 1B For Conventional Symbols
R
O
W
&
U
T
L
THERE IS NO CONTROL OF ACCESS ON THIS PROJECT.
T
Y
P
E
O
F
W
O
R
K
:
G
R
A
D
I
N
G
,
P
A
V
I
N
G
,
D
R
A
I
N
A
G
E
&
S
T
R
U
C
T
U
R
E
B
R
I
D
G
E
N
O
.
1
1
9
O
V
E
R
L
I
T
T
L
E
C
O
N
T
E
N
T
N
E
A
C
R
E
E
K
O
N
S
R
1
5
3
1
(
E
A
G
L
E
C
R
O
S
S
R
O
A
D
)
B
E
G
I
N
B
R
I
D
G
E
E
N
D
B
R
I
D
G
E
-
L
-
S
T
A
.
1
5
+
8
3
.
8
8
-
L
-
S
T
A
.
1
6
+
4
1
.
1
3
FUNC CLASS = RURALLOCAL CLEARING ON THIS PROJECT SHAL BE PERFORMED TO THE LIMITS
E
S
T
A
B
L
I
S
H
E
D
B
Y
M
E
T
H
O
D
I
I
A
P
R
I
L
2
1
,
2
0
1
5
N
A
D
8
3/ 9
5
E
E
I
N
W
E
T
L
A
N
D
D
E
N
O
T
E
S
E
X
C
A
V
A
T
I
O
N
W
E
T
L
A
N
D
D
E
N
O
T
E
S
F
I
L
L
I
N
F
F
H
C
H
C
C
L
E
A
R
I
N
G
D
E
N
O
T
E
S
H
A
N
D
S
S
S
U
R
F
A
C
E
W
A
T
E
R
D
E
N
O
T
E
S
I
M
P
A
C
T
S
I
N
T
S
T
S
I
M
P
A
C
T
S
I
N
S
U
R
F
A
C
E
W
A
T
E
R
D
E
N
O
T
E
S
T
E
M
P
O
R
A
R
Y
I
N
W
E
T
L
A
N
D
E
X
C
A
V
A
T
I
O
N
H
A
N
D
C
L
E
A
R
I
N
G
H
A
N
D
C
L
E
A
R
I
N
G
F
I
L
L
I
N
W
E
T
L
A
N
D
I
N
W
E
T
L
A
N
D
E
X
C
A
V
A
T
I
O
N
F
I
L
L
I
N
W
E
T
L
A
N
D
S
U
R
F
A
C
E
W
A
T
E
R
I
M
P
A
C
T
I
N
S
U
R
F
A
C
E
W
A
T
E
R
IM
P
A
C
T
I
N
H
A
N
D
C
L
E
A
R
I
N
G
(
S
H
E
E
T
4
O
F
7
)
S
E
E
E
N
L
A
G
E
M
E
N
T
H
A
N
D
C
L
E
A
R
I
N
G
H
A
N
D
C
L
E
A
R
I
N
G
F
I
L
L
I
N
W
E
T
L
A
N
D
EN
G
L
I
S
H
G
R
A
P
H
I
C
S
C
A
L
E
0
’
1
0
0
’
1
0
0
’
S
H
E
E
T
2
O
F
7
P
E
R
M
I
T
D
R
A
W
I
N
G
I
N
W
E
T
L
A
N
D
E
X
C
A
V
A
T
I
O
N
I
N
W
E
T
L
A
N
D
E
X
C
A
V
A
T
I
O
N
I
N
W
E
T
L
A
N
D
E
X
C
A
V
A
T
I
O
N
R:\Hydraulics\PERM ITS_Environm ental\Drawings\PERM IT IM PACTS\2-B4681_Hyd_prm _wet_PSH4.dgncrlewis210/1/2014
I
N
S
U
R
F
A
C
E
W
A
T
E
R
T
E
M
P
.
I
M
P
A
C
T
N
A
D
8
3/ 9
5
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
I
N
C
O
M
P
L
E
T
E
P
L
A
N
S
D
O
N
O
T
U
S
E
F
O
R
R
/
W
A
C
Q
U
I
S
I
T
I
O
N
4
B
-
4
6
8
1
10+00
15+00
20+00
B
R
I
D
G
E
1
1
9
LITTLE CONTENTNEA CREEK
E
X
I
S
T
I
N
G
R
/
W
EXISTING R/WEXISTING R/W 60.00’
W
O
O
D
S
S
O
I
L
60.00’
W
O
O
D
S
E
X
I
S
T
I
N
G
R
/
W
SOIL
CAROLYN EAGLES NEWMAN MARGERET L MORIARTY &CAROLYN EAGLES NEWM
A
N
MARGERET L MORIARTY
&
W
O
O
D
S
W
O
O
D
S
W
O
O
D
S
W
O
O
D
S
R
O
B
E
R
T
L
D
I
X
O
N
B
L
A
N
C
H
E
M
D
I
X
O
N
R
O
B
E
R
T
L
D
I
X
O
N
B
L
A
N
C
H
E
M
D
I
X
O
N
1
7
.
5
’
B
S
T
S
R
1
5
3
1
E
A
G
L
E
C
R
O
S
S
R
D
.
SR 1531 EAGLE CROSS RD.11
F
C
F
C
C
C
F
F
F
FF
C
C
C
F
F
F
F
C
C
C C
C
C
C C
FF
C
C
C
C
E
E
I
N
W
E
T
L
A
N
D
D
E
N
O
T
E
S
E
X
C
A
V
A
T
I
O
N
W
E
T
L
A
N
D
D
E
N
O
T
E
S
F
I
L
L
I
N
F
F
H
C
H
C
C
L
E
A
R
I
N
G
D
E
N
O
T
E
S
H
A
N
D
S
S
S
U
R
F
A
C
E
W
A
T
E
R
D
E
N
O
T
E
S
I
M
P
A
C
T
S
I
N
T
S
T
S
I
M
P
A
C
T
S
I
N
S
U
R
F
A
C
E
W
A
T
E
R
D
E
N
O
T
E
S
T
E
M
P
O
R
A
R
Y
I
N
W
E
T
L
A
N
D
E
X
C
A
V
A
T
I
O
N
H
A
N
D
C
L
E
A
R
I
N
G
H
A
N
D
C
L
E
A
R
I
N
G
F
I
L
L
I
N
W
E
T
L
A
N
D
I
N
W
E
T
L
A
N
D
E
X
C
A
V
A
T
I
O
N
F
I
L
L
I
N
W
E
T
L
A
N
D
S
U
R
F
A
C
E
W
A
T
E
R
I
M
P
A
C
T
I
N
S
U
R
F
A
C
E
W
A
T
E
R
IM
P
A
C
T
I
N
H
A
N
D
C
L
E
A
R
I
N
G
(
S
H
E
E
T
4
O
F
7
)
S
E
E
E
N
L
A
G
E
M
E
N
T
H
A
N
D
C
L
E
A
R
I
N
G
H
A
N
D
C
L
E
A
R
I
N
G
F
I
L
L
I
N
W
E
T
L
A
N
D
EN
G
L
I
S
H
G
R
A
P
H
I
C
S
C
A
L
E
0
’
1
0
0
’
1
0
0
’
S
H
E
E
T
3
O
F
7
P
E
R
M
I
T
D
R
A
W
I
N
G
I
N
W
E
T
L
A
N
D
E
X
C
A
V
A
T
I
O
N
I
N
W
E
T
L
A
N
D
E
X
C
A
V
A
T
I
O
N
I
N
W
E
T
L
A
N
D
E
X
C
A
V
A
T
I
O
N
R:\Hydraulics\PERM ITS_Environm ental\Drawings\PERM IT IM PACTS\3-B4681_Hyd_prm _wet_PSH4_CO NTO URS.dgncrlewis210/1/2014
I
N
S
U
R
F
A
C
E
W
A
T
E
R
T
E
M
P
.
I
M
P
A
C
T
N
A
D
8
3/ 9
5
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
I
N
C
O
M
P
L
E
T
E
P
L
A
N
S
D
O
N
O
T
U
S
E
F
O
R
R
/
W
A
C
Q
U
I
S
I
T
I
O
N
4
B
-
4
6
8
1
10+00
15+00
20+00
B
R
I
D
G
E
1
1
9
LITTLE CONTENTNEA CREEK
E
X
I
S
T
I
N
G
R
/
W
EXISTING R/WEXISTING R/W 60.00’
W
O
O
D
S
S
O
I
L
60.00’
W
O
O
D
S
E
X
I
S
T
I
N
G
R
/
W
SOIL
CAROLYN EAGLES NEWMAN MARGERET L MORIARTY &CAROLYN EAGLES NEWM
A
N
MARGERET L MORIARTY
&
W
O
O
D
S
W
O
O
D
S
W
O
O
D
S
W
O
O
D
S
R
O
B
E
R
T
L
D
I
X
O
N
B
L
A
N
C
H
E
M
D
I
X
O
N
R
O
B
E
R
T
L
D
I
X
O
N
B
L
A
N
C
H
E
M
D
I
X
O
N
1
7
.
5
’
B
S
T
S
R
1
5
3
1
E
A
G
L
E
C
R
O
S
S
R
D
.
SR 1531 EAGLE CROSS RD.11
74.00
75.
0
0
76.
00
76.00
7
7
.0
077.00 77.00 77.00
78.00
7
8.0
0
78.00
78.00
78.00 78.00
7
9
.
0
0
7
9
.
0
0
79.00 80.00
80.00
80.00
8
0
.
0
0
8
0
.0
0
80.00
80
.00
8
0.
0
0
8
0
.
0
0
81.00
81.00
8
1.
0
0
81.00
8
2
.0
0
8
2
.
0
0
82.00
8
2.
0
0
8
2
.
0
0
8
2
.
0
0
82.00
8
3
.0
0
8
3
.0
0
8
3
.
0
0
8
3.
0
0
83.00
83.00
8
3
.
0
0
8
3.0
0
83.00 8
4
.0
0
84.00
8
4
.0
0
8
4
.
0
0
84.00
84.00
8
4
.
0
0
8
5.
0
0
8
5
.
0
0
85.00
85.00
85.00
86.00
86.00
8
6
.0
0
86.00
86.00
86.00
86.00
87.00
88.00
89.00
90.00
9
0.
0
0
91.
00
92.00
93.00 94.0094.00 94.00 95.0095.00 96.0096.00 97.0097.00 98.0098.00 98.0099.0099.00
F
C
F
C
C
C
F
F
F
FF
C
C
C
F
F
F
F
C
C
C C
C
C
C C
FF
C
C
C
C
3
0
s
c
a
l
e
F
I
L
L
I
N
W
E
T
L
A
N
D
C
L
E
A
R
I
N
G
H
A
N
D
CLEARIN
G
HANDCLEA
R
I
N
G
H
A
N
D
C
L
E
A
R
I
N
G
H
A
N
D
F
I
L
L
I
N
W
E
T
L
A
N
D
IN WETLAN
D
EXCAVATIO
N
I
N
W
E
T
L
A
N
D
E
X
C
A
V
A
T
I
O
N
IN WE
T
L
A
N
D
EXCA
V
A
T
I
O
N
I
N
W
E
T
L
A
N
D
E
X
C
A
V
A
T
I
O
N
S
U
R
F
A
C
E
W
A
T
E
R
T
E
M
P
.
I
M
P
A
C
T
I
N
E
N
L
A
R
G
E
M
E
N
T
G
R
A
P
H
I
C
S
C
A
L
E
3
0
’
0
’
3
0
’
EEIN WETLAND DENOTES EXCAVATIONWETLANDDENOTES FILL INFFHCHCCLEARINGDENOTES HANDSSSURFACE WATER DENOTES IMPACTS INTSTSIMPACTS IN SURFACE WATER DENOTES TEMPORARY
W
I
L
S
O
N
C
O
U
N
T
Y
PR
O
J
E
C
T
:
3
8
4
6
5
.
1
.
2
(
B
-
4
6
8
1
)
(
E
A
G
L
E
C
R
O
S
S
R
O
A
D
)
O
N
S
R
1
5
3
1
O
V
E
R
L
I
T
T
L
E
C
O
N
T
E
N
T
N
E
A
C
R
E
E
K
1
0
/
0
1
/
1
4
EN
G
L
I
S
H
S
H
E
E
T
4
O
F
7
FILL IN WET
L
A
N
D
R:\Hydraulics\PERM ITS_Environm ental\Drawings\PERM IT IM PACTS\4-B4681_Hyd_prm _wet_Enlargem ent.dgncrlewis210/1/2014
N
C
D
O
T
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
I
M
P
A
C
T
I
N
S
U
R
F
A
C
E
W
A
T
E
R
N
A
D
8
3/ 9
5
SURFACE W
A
T
E
R
IMPACT
I
N
EXISTING R/W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
EXISTING R/W
-
L
-
S
E
E
D
E
T
A
I
L
"
A
"
S
P
E
C
I
A
L
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
13
PROPERTY LINE IS CL OF CREEK
C
C
C
F
FF
FF
C
CC
C
C
C
C
-L- STA. 15+83.88
BEGIN BRIDGE
-L- STA. 16+41.13
END BRIDGE
6
0
7
0
8
0
9
0
1
0
0
101112
1
3
1
4
1
5
1
6
1
7
1
8
1
9
2
0
2
1
2
2
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
I
N
C
O
M
P
L
E
T
E
P
L
A
N
S
D
O
N
O
T
U
S
E
F
O
R
R
/
W
A
C
Q
U
I
S
I
T
I
O
N
5/14/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
5
B
-
4
6
8
1
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAM E$$$$
-
L
-
EL = 86.90’ (MATCH EXIST.)
BEGIN GRADE -L- STA. 13+00.00
EL = 83.46’ (MATCH EXIST.)
END GRADE -L- STA 18+50.00
S
E
E
S
H
E
E
T
4
F
O
R
-
L
-
P
L
A
N
V
I
E
W
60 70 80 90 100
P
I
=
1
4
+
0
0
.
0
0
E
L
=
8
5
.
0
4
’
(-
)1.8
6
0
0
%
(-
)0
.3
5
7
8
%
V
C
=
1
7
5
’
K
=
1
1
6
V
=
5
5
m
p
h
R
/
R
S
P
I
K
E
I
N
B
A
S
E
O
F
T
E
L
E
P
H
O
N
E
P
O
L
E
E
L
E
V
.
=
1
0
1
.
0
1
O
U
T
O
F
P
R
O
J
E
C
T
L
I
M
I
T
S
N
6
9
4
2
5
9
E
2
3
8
5
2
6
8
B
M
#
2
0
1
R
/
R
S
P
I
K
E
I
N
B
A
S
E
O
F
8
"
O
A
K
E
L
E
V
.
=
9
1
.
2
4
O
U
T
O
F
P
R
O
J
E
C
T
L
I
M
I
T
S
N
6
9
5
7
5
7
E
2
3
8
5
8
3
1
B
M
#
2
0
2
(
+
)
0
.3
0
0
0
%
B
E
G
I
N
S
P
E
C
I
A
L
D
I
T
C
H
G
R
A
D
E
R
T
.
-
L
-
S
T
A
.
1
7
+
0
0
.
0
0
E
N
D
S
P
E
C
I
A
L
D
I
T
C
H
G
R
A
D
E
R
T
.
-
L
-
S
T
A
.
1
8
+
0
0
.
0
0
E
L
=
8
1
.
3
4
’
E
L
=
8
1
.
6
4
’
1.5:1
1
.5
:1
S
T
R
U
C
T
U
R
E
H
Y
D
R
A
U
L
I
C
D
A
T
A
D
E
S
I
G
N
D
I
S
C
H
A
R
G
E
D
E
S
I
G
N
F
R
E
Q
U
E
N
C
Y
B
A
S
E
D
I
S
C
H
A
R
G
E
C
F
S
Y
R
S
Y
R
S
B
A
S
E
F
R
E
Q
U
E
N
C
Y
O
V
E
R
T
O
P
P
I
N
G
E
L
E
V
A
T
I
O
N
O
V
E
R
T
O
P
P
I
N
G
F
R
E
Q
U
E
N
C
Y
O
V
E
R
T
O
P
P
I
N
G
D
I
S
C
H
A
R
G
E
C
F
S
C
F
S
Y
R
S
F
T
F
T
F
T
D
E
S
I
G
N
H
W
E
L
E
V
A
T
I
O
N
B
A
S
E
H
W
E
L
E
V
A
T
I
O
N
=
8
3
.
5
=
1
1
8
5
=
8
3
.
1
5
=
1
0
7
7
=
8
2
.
4
=
7
0
9
=
2
5
=
1
0
0
=
1
0
0
+
R
I
G
H
T
D
I
T
C
H
(
S
T
R
U
C
T
U
R
E
’
S
P
A
Y
I
T
E
M
)
C
L
A
S
S
’
I
I
’
R
I
P
R
A
P
E
X
C
A
V
A
T
E
T
O
E
L
=
7
9
’
E
X
C
A
V
A
T
I
O
N
S
T
R
U
C
T
U
R
E
U
N
C
L
A
S
S
I
F
I
E
D
E
X
C
A
V
A
T
E
T
O
E
L
=
7
9
’
E
X
C
A
V
A
T
I
O
N
S
T
R
U
C
T
U
R
E
U
N
C
L
A
S
S
I
F
I
E
D
S
K
E
W
=
9
0
G
R
A
D
E
P
O
I
N
T
E
L
E
V
.
=
8
4
.
2
8
’
2
1
"
C
O
R
E
D
S
L
A
B
1
@
5
7
’
-
3
"
-
L
-
S
T
A
.
1
6
+
1
2
.
5
0
N
W
S
=
8
0
.
4
(
O
C
T
.
1
,
2
0
1
3
)
T
O
B
E
R
E
M
O
V
E
D
E
X
I
S
T
I
N
G
B
R
I
D
G
E
S
H
E
E
T
5
O
F
7
P
E
R
M
I
T
D
R
A
W
I
N
G
R:\Hydraulics\PERM ITS_Environm ental\Drawings\PERM IT IM PACTS\5-B4681_Hyd_prm _wet_PFL.dgncrlewis29/30/2014
LIM ITS
CLEARING
LIM ITS
CLEARIN G
W LB W LB
S
H
E
E
T
6
O
F
7
P
E
R
M
I
T
D
R
A
W
I
N
G
R:\Hydraulics\PERM ITS_Environm ental\Drawings\PERM IT IM PACTS\6-B4681_Hyd_prm _wet_XSC.dgncrlewis29/30/2014
00
00
1010
1010
2020
2020
3030
3030
4040
4040
50
50$$$$$$SYSTIM E$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAM E$$$$
S
H
E
E
T
N
O
.
10/26/98
0
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
75 75
80 80
85 85
90 90
95 95
70 7016+00.00
80 80
85 85
90 90
75 75
16+50.00
85 85
90 90
80 80
17+00.00
85 85
90 90
80 8017+50.00
85 859090
80 8018+00.00
80 808585757518+50.00
X
-
2
B
-
4
6
8
1
-L-
2.5 5
79.67
15+85+/-
BEG IN BRIDGE
16+40+/-
EN D BRIDGE
0.02 FT/FT 0.02 FT/FT
15’-5"15’-5"
84.28
0.020 0.020
4
:1
84.14
0.020 0.020
4
:1
83.92
0.020 0.020 4
:1
83.600.020 0.02083.4618+50.00END PRO JECT
Ha
n
d
Existing Existing
Pe
r
m
a
n
e
n
t
T
e
m
p
.
E
x
c
a
v
a
t
i
o
n
M
e
c
h
a
n
i
z
e
d
C
l
e
a
r
i
n
g
P
e
r
m
a
n
e
n
t
T
e
m
p
.
C
h
a
n
n
e
l
C
h
a
n
n
e
l
N
a
t
u
r
a
l
Si
t
e
St
a
t
i
o
n
St
r
u
c
t
u
r
e
Fi
l
l
I
n
F
i
l
l
I
n
i
n
C
l
e
a
r
i
n
g
i
n
S
W
S
W
I
m
p
a
c
t
s
I
m
p
a
c
t
s
S
t
r
e
a
m
No
.
(F
r
o
m
/
T
o
)
Si
z
e
/
T
y
p
e
We
t
l
a
n
d
s
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
i
n
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
i
m
p
a
c
t
s
i
m
p
a
c
t
s
P
e
r
m
a
n
e
n
t
T
e
m
p
.
D
e
s
i
g
n
(a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
f
t
)
(
f
t
)
(
f
t
)
1
-
L
-
S
T
A
1
4
+
7
5
T
O
5
5
'
C
O
R
E
D
S
L
A
B
2
1
"
<
0
.
0
1
<
0
.
0
1
0.
0
2
<
0
.
0
1
<
0
.
0
1
-
L
-
S
T
A
1
7
+
5
0
TO
T
A
L
S
*
:
<
0
.
0
1
<
0
.
0
1
0.
0
2
<
0
.
0
1
<
0
.
0
1
0
00
*R
o
u
n
d
e
d
t
o
t
a
l
s
a
r
e
s
u
m
o
f
a
c
t
u
a
l
i
m
p
a
c
t
s
NO
T
E
S
:
Re
v
i
s
e
d
2
0
1
3
1
0
2
4
SHEET 7 OF 7
WE
T
L
A
N
D
P
E
R
M
I
T
I
M
P
A
C
T
S
U
M
M
A
R
Y
WE
T
L
A
N
D
I
M
P
A
C
T
S
SURFACE WATER IMPACTS WILSON COUNTY BRIDGE 0119 ON SR 1531 OVER LITTLE CONTENTNEA CREEKNC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 10/1/2014
<0
.
0
1
a
c
r
e
o
f
T
e
m
p
o
r
a
r
y
F
i
l
l
i
n
W
e
t
l
a
n
d
s
i
n
t
h
e
H
a
n
d
C
l
e
a
r
i
n
g
a
r
e
a
s
f
o
r
e
r
o
s
i
o
n
c
o
n
t
r
o
l
m
e
a
s
u
r
e
s
S
I
T
E
1
S
H
E
E
T
1
O
F
5
P
E
R
M
I
T
D
R
A
W
I
N
G
B
U
F
F
E
R
I
M
P
A
C
T
S
R:\Hydraulics\PERM ITS_Environm ental\Drawings\BUFFER IM PACTS\1-B4681_Hyd_prm _buf_TSH.dgncrlewis29/30/2014
DTV ======%%MPH ADTADT% *
I
N
C
O
M
P
L
E
T
E
P
L
A
N
S
D
O
N
O
T
U
S
E
F
O
R
R
/
W
A
C
Q
U
I
S
I
T
I
O
N
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
W
I
L
S
O
N
C
O
U
N
T
Y
000PROFILE (HORIZONTAL)
B
R
Z
-
1
5
3
1
(
5
)
B
R
Z
-
1
5
3
1
(
5
)
P
R
O
J
E
C
T
L
E
N
G
T
H
R
I
G
H
T
O
F
W
A
Y
D
A
T
E
:
L
E
T
T
I
N
G
D
A
T
E
:
S
T
A
T
E
S
T
A
T
E
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
S
T
A
T
E
P
R
O
J
.
N
O
.
F.
A
.
P
R
O
J
.
N
O
.
DE
S
C
R
I
P
T
I
O
N
N
O
.
T
O
T
A
L
S
H
E
E
T
S
N
.
C
.
S
H
E
E
T
1
DESIGN DATA
P
r
e
p
a
r
e
d
i
n
t
h
e
O
f
f
i
c
e
o
f
:
S
I
G
N
A
T
U
R
E
:
S
I
G
N
A
T
U
R
E
:
P
.
E
.
P
.
E
.
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
2
0
1
2
S
T
A
N
D
A
R
D
S
P
E
C
I
F
I
C
A
T
I
O
N
S
P
R
O
J
E
C
T
E
N
G
I
N
E
E
R
P
R
O
J
E
C
T
D
E
S
I
G
N
E
N
G
I
N
E
E
R
GRAPHIC SCALES PLANSPROFILE (VERTICAL)
H
Y
D
R
A
U
L
I
C
S
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
O
A
D
W
A
Y
D
E
S
I
G
N
L
O
C
A
T
I
O
N
:
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
000$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$
1
0
0
0
B
i
r
c
h
R
i
d
g
e
D
r
.
,
R
a
l
e
i
g
h
N
C
,
2
7
6
1
0
CON TRACT:TIP PROJECT:B-4681
ARTMEN
N
A
S
O
H
DEP
T
O
F
T
R
A
S
P
OR
T
T
IO N
T
ATE
O
F
N
R
T
C
AROLINA
VICINITY MAPDETOUR Swamp Shackleford AlbertSaraMooreAtkinsonGeorgeFriendlyAspen GrovePopEastCityForkRd.Rd.SmokehousePineyGroveChurchRd.Rd.ScarboroughPl.Cardy Ct.LenfersCt.School ArrowHeadPl.1532 1531 1531153015791534152615261573157215711550153315701571ChurchPiney Grove264A264130713081309131013061306130812291228122912301231130
3
1
3
1
2
1
3
1
1
1226 1260 1259 1310BYNUM RD SCHOOL HOUSE RD STRICKLAND RDSPRING BRANCH CHURCH RD CRAFT RDN WILSON STN MAIN STREET EXTRAILROAD STREET EXT WHITLEY ST GALLOWAY RD
B
ELL RD
APPIE RDAppie Church
1
2
3
5
123
2
1
2
3
2
1233
DunnRd.
BellRd.
Allen
R
d
.
Rd.
Bell
Rd.
Bell
Rd.
Stantonsburg
Moseley St.Jam
e
s
1
2
3
1
1
2
3
1
B
R
I
D
G
E
1
1
9
1
2
0
0
1579 26450’100’25’50’50’100’10’20’25’50’10’5’JenkinsCrossroads
E
N
D
T
I
P
P
R
O
J
E
C
T
B
-
4
6
8
1
R
E
K
H
A
P
A
T
E
L
,
P
.
E
.
Gay2015SUBREGIONAL TIER 60
N
O
V
E
M
B
E
R
2
1
,
2
0
1
4
PROJECT Rd.1353002035 55 12 8* TTST =4%DUAL =4%
4
B
-
4
6
8
1
P
E
3
8
4
6
5
.
1
.
2
-
L
-
P
O
T
S
T
A
.
1
8
+
5
0
.
0
0
-L- POT
S
T
A
.
1
3
+
0
0
.
0
0
L
E
N
G
T
H
R
O
A
D
W
A
Y
L
E
N
G
T
H
S
T
R
U
C
T
U
R
E
T
O
T
A
L
L
E
N
G
T
H
O
F
M
I
.
M
I
.
M
I
.
T
I
P
P
R
O
J
E
C
T
B
-
4
6
8
1
T
I
P
P
R
O
J
E
C
T
B
-
4
6
8
1
T
I
P
P
R
O
J
E
C
T
B
-
4
6
8
1
=
0
.
0
9
3
=
0
.
0
1
1
=
0
.
1
0
4
TO US 264
T
O
N
C
2
2
2
Walstonburg WILSON COUNTYGREENE COUNTY 22222
2
CreekAYCOCK RD.MERCER RD.MERCER RD.Rd.CRAFT RD.1306 Galloway13041227PITT COUNTY
CreekCarolina and Northwestern Railway LittleContentneaBEGIN
T
I
P
P
R
O
J
E
C
T
B
-
4
6
8
1
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
L
ITTLE
CONTENTNEA
CREEK
S
R
1
5
3
1
E
A
G
L
E
C
R
O
S
S
R
D
.
K
-
L
-
B
R
I
A
N
R
O
B
I
N
S
O
N
3
8
4
6
5
.
2
.
1
See Sheet 1A For Index of SheetsSee Sheet 1B For Conventional Symbols
R
O
W
&
U
T
L
THERE IS NO CONTROL OF ACCESS ON THIS PROJECT.
T
Y
P
E
O
F
W
O
R
K
:
G
R
A
D
I
N
G
,
P
A
V
I
N
G
,
D
R
A
I
N
A
G
E
&
S
T
R
U
C
T
U
R
E
B
R
I
D
G
E
N
O
.
1
1
9
O
V
E
R
L
I
T
T
L
E
C
O
N
T
E
N
T
N
E
A
C
R
E
E
K
O
N
S
R
1
5
3
1
(
E
A
G
L
E
C
R
O
S
S
R
O
A
D
)
B
E
G
I
N
B
R
I
D
G
E
E
N
D
B
R
I
D
G
E
-
L
-
S
T
A
.
1
5
+
8
3
.
8
8
-
L
-
S
T
A
.
1
6
+
4
1
.
1
3
FUNC CLASS = RURALLOCAL CLEARING ON THIS PROJECT SHAL BE PERFORMED TO THE LIMITS
E
S
T
A
B
L
I
S
H
E
D
B
Y
M
E
T
H
O
D
I
I
A
P
R
I
L
2
1
,
2
0
1
5
N
A
D
8
3/ 9
5
-
L
-
(
S
H
E
E
T
3
O
F
5
)
S
E
E
E
N
L
A
G
E
M
E
N
T
S
H
E
E
T
2
O
F
5
P
E
R
M
I
T
D
R
A
W
I
N
G
EN
G
L
I
S
H
A
L
L
O
W
A
B
L
E
I
M
P
A
C
T
S
Z
O
N
E
1
A
L
L
O
W
A
B
L
E
I
M
P
A
C
T
S
Z
O
N
E
2
A
L
L
O
W
A
B
L
E
Z
O
N
E
1
A
L
L
O
W
A
B
L
E
Z
O
N
E
2
R:\Hydraulics\PERM ITS_Environm ental\Drawings\BUFFER IM PACTS\2-B4681_Hyd_prm _buf.dgncrlewis210/1/2014
G
R
A
P
H
I
C
S
C
A
L
E
0
’
1
0
0
’
1
0
0
’
A
L
L
O
W
A
B
L
E
Z
O
N
E
1
A
L
L
O
W
A
B
L
E
Z
O
N
E
1
A
L
L
O
W
A
B
L
E
Z
O
N
E
1
A
L
L
O
W
A
B
L
E
Z
O
N
E
2
E
L
E
V
.
7
9
.
0
’
E
X
C
A
V
A
T
E
T
O
N
A
D
8
3/ 9
5
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
I
N
C
O
M
P
L
E
T
E
P
L
A
N
S
D
O
N
O
T
U
S
E
F
O
R
R
/
W
A
C
Q
U
I
S
I
T
I
O
N
4
B
-
4
6
8
1
10+00
15+00
20+00
B
R
I
D
G
E
1
1
9
LITTLE CONTENTNEA CREEK
E
X
I
S
T
I
N
G
R
/
W
EXISTING R/WEXISTING R/W 60.00’
W
O
O
D
S
E
I
P
S
O
I
L
60.00’
W
O
O
D
S
E
X
I
S
T
I
N
G
R
/
W
SOIL
C
A
R
O
L
Y
N
E
A
G
L
E
S
N
E
W
M
A
N
M
A
R
G
E
R
E
T
L
M
O
R
I
A
R
T
Y
&
W
O
O
D
S
W
O
O
D
S
W
O
O
D
S
W
O
O
D
S
R
O
B
E
R
T
L
D
I
X
O
N
B
L
A
N
C
H
E
M
D
I
X
O
N
R
O
B
E
R
T
L
D
I
X
O
N
B
L
A
N
C
H
E
M
D
I
X
O
N
1
7
.
5
’
B
S
T
S
R
1
5
3
1
E
A
G
L
E
C
R
O
S
S
R
D
.
SR 1531 EAGLE CROSS RD.CAROLYN EAGLES NEWMAN MARGERET L MORIARTY &1
1
FC
F
C
C
C
F
FF
FF
C
C
F
F F
C
C
C
C C
FF
C
C
C
EN
G
L
I
S
H
A
L
L
O
W
A
B
L
E
Z
O
N
E
1
A
L
L
O
W
A
B
L
E
Z
O
N
E
2
A
L
L
O
W
A
B
L
E
Z
O
N
E
2
BZ 1BZ 1 BZ 2BZ 2
A
L
L
O
W
A
B
L
E
I
M
P
A
C
T
S
Z
O
N
E
1
A
L
L
O
W
A
B
L
E
I
M
P
A
C
T
S
Z
O
N
E
2
R:\Hydraulics\PERM ITS_Environm ental\Drawings\BUFFER IM PACTS\3-B4681_Hyd_prm _buf_Enlargem ent.dgncrlewis210/1/2014
N
A
D
8
3/ 9
5
EN
L
A
R
G
E
M
E
N
T
N
.
C
.
D
E
P
T
.
O
F
T
R
A
N
S
P
O
R
T
A
T
I
O
N
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
W
I
L
S
O
N
C
O
U
N
T
Y
P
R
O
J
E
C
T
:
3
8
4
6
5
.
1
.
2
(
B
-
4
6
8
1
)
(
E
A
G
L
E
C
R
O
S
S
R
O
A
D
)
O
N
S
R
1
5
3
1
O
V
E
R
L
I
T
T
L
E
C
O
N
T
E
N
T
N
E
A
C
R
E
E
K
S
H
E
E
T
3
O
F
5
1
0
/
0
1
/
1
4
G
R
A
P
H
I
C
S
C
A
L
E
3
0
’
0
’
3
0
’
A
L
L
O
W
A
B
L
E
Z
O
N
E
1
ALLOWABLE ZONE 1 ALLOWABLE ZONE 1
B
R
ID
G
E
119 LITTLE CONTENTNEA CREEK
E
I
P
CC FF
FF
C
C
C
C
C
C
C
C
C
C
RO
A
D
CR
O
S
S
I
N
G
B
R
I
D
G
E
PA
R
A
L
L
E
L
IM
P
A
C
T
ZO
N
E
1
(f
t
2)
ZO
N
E
2
(f
t
2)
TO
T
A
L
(f
t
2)
ZO
N
E
1
(f
t
2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)
1
5
5
'
C
O
R
E
D
S
L
A
B
2
1
"
-
L
-
S
T
A
1
5
+
7
0
T
O
X
3
1
4
2
0
3
5
1
7
-
L
-
S
T
A
1
7
+
1
0
X
1
4
2
1
4
2
TO
T
A
L
:
45
6
2
0
3
6
5
9
0
0
0
NO
T
E
:
Z
o
n
e
1
A
l
l
o
w
a
b
l
e
I
m
p
a
c
t
s
i
n
c
l
u
d
e
4
0
0
s
q
.
f
t
.
o
f
W
e
t
l
a
n
d
s
i
n
B
u
f
f
e
r
s
.
Zo
n
e
2
A
l
l
o
w
a
b
l
e
I
m
p
a
c
t
s
i
n
c
l
u
d
e
1
4
8
s
q
.
f
t
.
o
f
W
e
t
l
a
n
d
s
i
n
B
u
f
f
e
r
s
.
IM
P
A
C
T
BU
F
F
E
R
I
M
P
A
C
T
S
S
U
M
M
A
R
Y
TY
P
E
SI
T
E
N
O
.
ST
R
U
C
T
U
R
E
S
I
Z
E
/
TY
P
E
S
T
A
T
I
O
N
(
F
R
O
M
/
T
O
)
AL
L
O
W
A
B
L
E
M
I
T
I
G
A
B
L
E
BUFFER REPLACEMENT SHEET 4 OF 5 10/01/14PROJECT: 38465.1.2 (B-4681) N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS WILSON COUNTY Rev. May 2006
ZO
N
E
1
(f
t
2)
ZO
N
E
2
(f
t
2)
1
-
L
-
S
T
A
1
5
+
7
0
T
O
-
L
-
S
T
A
1
7
+
1
0
40
0
1
4
8
TO
T
A
L
:
40
0
1
4
8
WE
T
L
A
N
D
S
I
N
B
U
F
F
E
R
I
M
P
A
C
T
S
S
U
M
M
A
R
Y
SHEET 5 OF 5PROJECT: 38465.1.2 (B-4681) 10/1/2014N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS WILSON COUNTY
WE
T
L
A
N
D
S
I
N
BU
F
F
E
R
S
SI
T
E
N
O
.
S
T
A
T
I
O
N
(
F
R
O
M
/
T
O
)
Rev. Jan 2009
DTV ======%%MPH ADTADT% *
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
W
I
L
S
O
N
C
O
U
N
T
Y
000PROFILE (HORIZONTAL)
B
R
Z
-
1
5
3
1
(
5
)
B
R
Z
-
1
5
3
1
(
5
)
P
R
O
J
E
C
T
L
E
N
G
T
H
R
I
G
H
T
O
F
W
A
Y
D
A
T
E
:
L
E
T
T
I
N
G
D
A
T
E
:
S
T
A
T
E
ST
A
T
E
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
S
T
A
T
E
P
R
O
J
.
N
O
.
F.
A
.
P
R
O
J
.
N
O
.
D
E
S
C
R
I
P
T
I
O
N
N
O
.
T
O
T
A
L
S
H
E
E
T
S
N
.
C
.
S
H
E
E
T
1
DESIGN DATA
P
r
e
p
a
r
e
d
i
n
t
h
e
O
f
f
i
c
e
o
f
:
S
I
G
N
A
T
U
R
E
:
S
I
G
N
A
T
U
R
E
:
P
.
E
.
P
.
E
.
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
2
0
1
2
S
T
A
N
D
A
R
D
S
P
E
C
I
F
I
C
A
T
I
O
N
S
P
R
O
J
E
C
T
E
N
G
I
N
E
E
R
P
R
O
J
E
C
T
D
E
S
I
G
N
E
N
G
I
N
E
E
R
GRAPHIC SCALES C203621 PLANSPROFILE (VERTICAL)
H
Y
D
R
A
U
L
I
C
S
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
O
A
D
W
A
Y
D
E
S
I
G
N
L
O
C
A
T
I
O
N
:
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
00014-NOV-2014 07:19R:\Roadw ay\Proj\B4681_Rdy_tsh.dgn$$$$USERNAME$$$$
1
0
0
0
B
i
r
c
h
R
i
d
g
e
D
r
.
,
R
a
l
e
i
g
h
N
C
,
2
7
6
1
0
CONTRACT:TIP PROJECT:B-4681
ARTMEN
N
A
S
O
H
DEP
T
O
F
T
R
A
S
P
OR
T
T
IO N
T
ATE
O
F
N
R
T
C
AROLINA
VICINITY MAPDETOUR Swamp Shackleford AlbertSaraMooreAtkinsonGeorgeFriendlyChurchPiney Grove264A264N WILSON STAppie Churc
h
St.Jam
e
s
B
R
I
D
G
E
1
1
9
26450’100’25’50’50’100’10’20’25’50’10’5’JenkinsCrossroads
E
N
D
T
I
P
P
R
O
J
E
C
T
B
-
4
6
8
1
R
E
K
H
A
P
A
T
E
L
,
P
.
E
.
2015SUBREGIONAL TIER 60 PROJECT1353002035 55 12 8* TTST =4%DUAL =4%
4
B
-
4
6
8
1
P
E
3
8
4
6
5
.
1
.
2
-
L
-
P
O
T
S
T
A
.
1
8
+
5
0
.
0
0
-L- POT
S
T
A
.
1
3
+
0
0
.
0
0
L
E
N
G
T
H
R
O
A
D
W
A
Y
L
E
N
G
T
H
S
T
R
U
C
T
U
R
E
T
O
T
A
L
L
E
N
G
T
H
O
F
M
I
.
M
I
.
M
I
.
T
I
P
P
R
O
J
E
C
T
B
-
4
6
8
1
T
I
P
P
R
O
J
E
C
T
B
-
4
6
8
1
T
I
P
P
R
O
J
E
C
T
B
-
4
6
8
1
=
0
.
0
9
3
=
0
.
0
1
1
=
0
.
1
0
4
TO US 264
T
O
N
C
2
2
2
Walstonburg WILSON COUNTYGREENE COUNTY 22222
2
CreekPITT COUNTY
CreekCarolina and Northwestern Railway LittleContentneaBEGIN
T
I
P
P
R
O
J
E
C
T
B
-
4
6
8
1
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
L
ITTLE
CONTENTNEA
CREEK
S
R
1
5
3
1
E
A
G
L
E
C
R
O
S
S
R
D
.
K
-
L
-
B
R
I
A
N
R
O
B
I
N
S
O
N
See Sheet 1A For Index of SheetsSee Sheet 1B For Conventional Symbols
R
O
W
&
U
T
L
THERE IS NO CONTROL OF ACCESS ON THIS PROJECT.
T
Y
P
E
O
F
W
O
R
K
:
G
R
A
D
I
N
G
,
P
A
V
I
N
G
,
D
R
A
I
N
A
G
E
&
S
T
R
U
C
T
U
R
E
B
R
I
D
G
E
N
O
.
1
1
9
O
V
E
R
L
I
T
T
L
E
C
O
N
T
E
N
T
N
E
A
C
R
E
E
K
O
N
S
R
1
5
3
1
(
E
A
G
L
E
C
R
O
S
S
R
O
A
D
)
B
E
G
I
N
B
R
I
D
G
E
E
N
D
B
R
I
D
G
E
-
L
-
S
T
A
.
1
5
+
8
3
.
8
8
-
L
-
S
T
A
.
1
6
+
4
1
.
1
3
FUNC CLASS = RURALLOCAL CLEARING ON THIS PROJECT SHAL BE PERFORMED TO THE LIMITS
E
S
T
A
B
L
I
S
H
E
D
B
Y
M
E
T
H
O
D
A
P
R
I
L
2
1
,
2
0
1
5
I
I
.
O
C
T
O
B
E
R
3
1
,
2
0
1
4
3
8
4
6
5
.
2
.
F
D
1
N
A
D
8
3/ 9
5
Aspen GrovePopEastCityForkRd.Rd.SmokehousePineyGroveChurchRd.Rd.ScarboroughPl.Cardy Ct.LenfersCt.School ArrowHeadPl.1532 1531 1531153015791534152615261573157215711550153315701571130713081309131013061306130812291228122912301231130
3
1
3
1
2
1
3
1
1
1226 1260 1259 1310BYNUM RD SCHOOL HOUSE RD STRICKLAND RDSPRING BRANCH CHURCH RD CRAFT RDN MAIN STREET EXTRAILROAD STREET EXT WHITLEY ST GALLOWAY RD
B
ELL RD
APPIE RD
1
2
3
5
123
2
1
2
3
2
1233
DunnRd.
Bell
Rd.
Allen
R
d
.
Rd.
Bell
Rd.
Bell
Rd.
Stantonsburg
Moseley
1
2
3
1
1
2
3
1
1
2
0
0
1579 GayRd.AYCOCK RD.MERCER RD.MERCER RD.Rd.CRAFT RD.1306 Galloway13041227
Existin
g
E
d
g
e
o
f
P
a
v
e
m
e
n
t
Existin
g
C
u
r
b
Propos
e
d
S
l
o
p
e
S
t
a
k
e
s
C
u
t
Propos
e
d
S
l
o
p
e
S
t
a
k
e
s
F
i
l
l
Existin
g
M
e
t
a
l
G
u
a
r
d
r
a
i
l
Existin
g
C
a
b
l
e
G
u
i
d
e
r
a
i
l
Propos
e
d
G
u
a
r
d
r
a
i
l
Equali
t
y
S
y
m
b
o
l
Pavem
e
n
t
R
e
m
o
v
a
l
Baselin
e
C
o
n
t
r
o
l
P
o
i
n
t
RIGH
T
O
F
W
A
Y
:
Existin
g
R
i
g
h
t
o
f
W
a
y
M
a
r
k
e
r
Existin
g
R
i
g
h
t
o
f
W
a
y
L
i
n
e
h
Existin
g
C
o
n
t
r
o
l
o
f
A
c
c
e
s
s
Propos
e
d
C
o
n
t
r
o
l
o
f
A
c
c
e
s
s
Propos
e
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
CF
Existin
g
E
a
s
e
m
e
n
t
L
i
n
e
Propos
e
d
T
e
m
p
o
r
a
r
y
C
o
n
s
t
r
u
c
t
i
o
n
E
a
s
e
m
e
n
t
Propos
e
d
T
e
m
p
o
r
a
r
y
D
r
a
i
n
a
g
e
E
a
s
e
m
e
n
t
Propos
e
d
P
e
r
m
a
n
e
n
t
D
r
a
i
n
a
g
e
E
a
s
e
m
e
n
t
Propos
e
d
P
e
r
m
a
n
e
n
t
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
HYDROLOGY:Stream or Body of WaterHydro, Pool or ReservoirFlow ArrowDisappearing StreamSpring
;
zvWKProposed Lateral, Tail, Head DitchFalse Sump Propos
e
d
C
a
b
l
e
G
u
i
d
e
r
a
i
l
M
A
J
O
R
:
B
r
i
d
g
e
,
T
u
n
n
e
l
o
r
B
o
x
C
u
l
v
e
r
t
B
r
i
d
g
e
W
i
n
g
W
a
l
l
,
H
e
a
d
W
a
l
l
a
n
d
E
n
d
W
a
l
l
M
I
N
O
R
:
H
e
a
d
a
n
d
E
n
d
W
a
l
l
P
i
p
e
C
u
l
v
e
r
t
F
o
o
t
b
r
i
d
g
e
P
a
v
e
d
D
i
t
c
h
G
u
t
t
e
r
U
T
I
L
I
T
I
E
S
:
ROA
D
S
A
N
D
R
E
L
A
T
E
D
F
E
A
T
U
R
E
S
:
E
x
i
s
t
i
n
g
P
o
w
e
r
P
o
l
e
P
r
o
p
o
s
e
d
P
o
w
e
r
P
o
l
e
P
U
/
G
P
o
w
e
r
C
a
b
l
e
H
a
n
d
H
o
l
e
P
o
w
e
r
M
a
n
h
o
l
e
P
o
w
e
r
L
i
n
e
T
o
w
e
r
P
o
w
e
r
T
r
a
n
s
f
o
r
m
e
r
E
x
i
s
t
i
n
g
J
o
i
n
t
U
s
e
P
o
l
e
P
r
o
p
o
s
e
d
J
o
i
n
t
U
s
e
P
o
l
e
E
x
i
s
t
i
n
g
T
e
l
e
p
h
o
n
e
P
o
l
e
P
r
o
p
o
s
e
d
T
e
l
e
p
h
o
n
e
P
o
l
e
T
e
l
e
p
h
o
n
e
M
a
n
h
o
l
e
T
e
l
e
p
h
o
n
e
B
o
o
t
h
T
e
l
e
p
h
o
n
e
P
e
d
e
s
t
a
l
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
H
a
n
d
H
o
l
e
R}T pQle]/b
H
-
F
r
a
m
e
P
o
l
e
O
O
P
O
W
E
R
:
T
E
L
E
P
H
O
N
E
:
T
e
l
e
p
h
o
n
e
C
e
l
l
T
o
w
e
r
R
e
c
o
r
d
e
d
U
/
G
P
o
w
e
r
L
i
n
e
R
e
c
o
r
d
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
D
e
s
i
g
n
a
t
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
(
S
.
U
.
E
.
*
)
R
e
c
o
r
d
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
o
n
d
u
i
t
D
e
s
i
g
n
a
t
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
o
n
d
u
i
t
(
S
.
U
.
E
.
*
)
R
e
c
o
r
d
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
s
C
a
b
l
e
W
A
T
E
R
:
W
a
t
e
r
M
a
n
h
o
l
e
W
a
t
e
r
M
e
t
e
r
W
a
t
e
r
V
a
l
v
e
W
a
t
e
r
H
y
d
r
a
n
t
R
e
c
o
r
d
e
d
U
/
G
W
a
t
e
r
L
i
n
e
4IHa
T
V
:
T
V
S
a
t
e
l
l
i
t
e
D
i
s
h
T
V
P
e
d
e
s
t
a
l
T
V
T
o
w
e
r
U
/
G
T
V
C
a
b
l
e
H
a
n
d
H
o
l
e
R
e
c
o
r
d
e
d
U
/
G
T
V
C
a
b
l
e
R
e
c
o
r
d
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
C
a
b
l
e
D
e
s
i
g
n
a
t
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
C
a
b
l
e
(
S
.
U
.
E
.
*
)
r|I]
G
A
S
:
G
a
s
V
a
l
v
e
G
a
s
M
e
t
e
r
R
e
c
o
r
d
e
d
U
/
G
G
a
s
L
i
n
e
n c
S
A
N
I
T
A
R
Y
S
E
W
E
R
:
S
a
n
i
t
a
r
y
S
e
w
e
r
M
a
n
h
o
l
e
S
a
n
i
t
a
r
y
S
e
w
e
r
C
l
e
a
n
o
u
t
U
/
G
S
a
n
i
t
a
r
y
S
e
w
e
r
L
i
n
e
R
e
c
o
r
d
e
d
S
S
F
o
r
c
e
d
M
a
i
n
L
i
n
e
D
e
s
i
g
n
a
t
e
d
S
S
F
o
r
c
e
d
M
a
i
n
L
i
n
e
(
S
.
U
.
E
.
*
)
do
A
/
G
W
a
t
e
r
A
b
o
v
e
G
r
o
u
n
d
G
a
s
L
i
n
e
A
/
G
G
a
s
A
b
o
v
e
G
r
o
u
n
d
W
a
t
e
r
L
i
n
e
A
b
o
v
e
G
r
o
u
n
d
S
a
n
i
t
a
r
y
S
e
w
e
r
A
/
G
S
a
n
i
t
a
r
y
S
e
w
e
r
M
I
S
C
E
L
L
A
N
E
O
U
S
:
U
t
i
l
i
t
y
P
o
l
e
OFS3
U
t
i
l
i
t
y
P
o
l
e
w
i
t
h
B
a
s
e
U
t
i
l
i
t
y
L
o
c
a
t
e
d
O
b
j
e
c
t
U
t
i
l
i
t
y
T
r
a
f
f
i
c
S
i
g
n
a
l
B
o
x
U
t
i
l
i
t
y
U
n
k
n
o
w
n
U
/
G
L
i
n
e
?
C
O
N
C
C
O
N
C
W
W
v
v
D
r
a
i
n
a
g
e
B
o
x
:
C
a
t
c
h
B
a
s
i
n
,
D
I
o
r
J
B
S
t
o
r
m
S
e
w
e
r
S
t
o
r
m
S
e
w
e
r
M
a
n
h
o
l
e
m
U
/
G
T
a
n
k
;
W
a
t
e
r
,
G
a
s
,
O
i
l
A
/
G
T
a
n
k
;
W
a
t
e
r
,
G
a
s
,
O
i
l
BOUNDARIES AND PROPERTY:State LineCounty LineTownship LineCity LineReservation LineProperty LineExisting Iron PinProperty CornerProperty MonumentExisting Fence LineProposed Woven Wire FenceProposed Chain Link FenceProposed Barbed Wire Fence gF123Existing Wetland BoundaryProposed Wetland BoundaryExisting Endangered Animal BoundaryExisting Endangered Plant BoundaryBUILDINGS AND OTHER CULTURE:Area Outline Gas Pump Vent or U/G Tank CapChurchSchoolDamSignSmall Mine Well VMWWSxFoundationSBuildingyyVEGE
T
A
T
I
O
N
:
Single
T
r
e
e
XY
V
i
n
e
y
a
r
d
Single
S
h
r
u
b
HedgeWoods
L
i
n
e
O
r
c
h
a
r
d
V
i
n
e
y
a
r
d
RAIL
R
O
A
D
S
:
Standa
r
d
G
a
u
g
e
RR Sig
n
a
l
M
i
l
e
p
o
s
t
SwitchRR Ab
a
n
d
o
n
e
d
RR Dis
m
a
n
t
l
e
d
S
FLOW
D
e
s
i
g
n
a
t
e
d
U
/
G
P
o
w
e
r
L
i
n
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
s
C
a
b
l
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
W
a
t
e
r
L
i
n
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
T
V
C
a
b
l
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
G
a
s
L
i
n
e
(
S
.
U
.
E
.
*
)
U
/
G
T
e
s
t
H
o
l
e
(
S
.
U
.
E
.
*
)
*S.U.E. = Subsurface Utility EngineeringWLBEIPBECM
C
O
N
C
H
W
C
B
C
S
X
T
R
A
N
S
P
O
R
T
A
T
I
O
N
M
I
L
E
P
O
S
T
3
5
S
W
I
T
C
H
Cemetery
E
X
I
S
T
I
N
G
S
T
R
U
C
T
U
R
E
S
:
Parcel / Sequence Number
E
A
A
T
U
R
E
n
d
o
f
I
n
f
o
r
m
a
t
i
o
n
E
.
O
.
I
.
Note: Not to Scale
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
1
B
B
-
4
6
8
1
A
b
a
n
d
o
n
e
d
A
c
c
o
r
d
i
n
g
t
o
U
t
i
l
i
t
y
R
e
c
o
r
d
s
WLBEABEPB
RW
RW
RW
CAET
D
E
P
D
E
P
U
E
SPPTTT
C
T
C
T
F
O
T
F
O
WWT
V
T
V
T
V
F
O
T
V
F
O
GG
S
S
F
S
S
F
S
S
?
U
T
L
Jurisdictional StreamJS 12/05/11Buffer Zone 1Buffer Zone 2 BZ 1BZ 2Wetland Propos
e
d
P
e
r
m
a
n
e
n
t
E
a
s
e
m
e
n
t
w
i
t
h
Iron
P
i
n
a
n
d
C
a
p
M
a
r
k
e
r
Propos
e
d
T
e
m
p
o
r
a
r
y
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
T
U
E
Iron
P
i
n
a
n
d
C
a
p
M
a
r
k
e
r
Propos
e
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
w
i
t
h
D
U
E
Propos
e
d
P
e
r
m
a
n
e
n
t
D
r
a
i
n
a
g
e
/
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
A
U
E
Propos
e
d
A
e
r
i
a
l
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
C
R
Propos
e
d
C
u
r
b
R
a
m
p
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
CO
N
V
E
N
T
I
O
N
A
L
P
L
A
N
S
H
E
E
T
S
Y
M
B
O
L
S
U
n
d
e
r
g
r
o
u
n
d
S
t
o
r
a
g
e
T
a
n
k
,
A
p
p
r
o
x
.
L
o
c
.
G
e
o
e
n
v
i
r
o
n
m
e
n
t
a
l
B
o
r
i
n
g
U
S
T
Known Soil Contamination: Area or SitePotential Soil Contamination: Area or Site Conc
r
e
t
e
o
r
G
r
a
n
i
t
e
R
/
W
M
a
r
k
e
r
Propos
e
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
w
i
t
h
CA
Conc
r
e
t
e
C
/
A
M
a
r
k
e
r
Propos
e
d
C
o
n
t
r
o
l
o
f
A
c
c
e
s
s
L
i
n
e
w
i
t
h
E
1
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
1
C
1
CL
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
1
.
0
2
8’
T
.0
8
.
0
2
6
"
NOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
CL-
L
-
3
0
’
-
1
0
"
1
1
’
4
’
-
5
"
1
1
’
(FINAL PAVEMENT DESIGN)
4
’
-
5
"
.
0
2
.
0
2
T
3
:1 M
A
X
4:1
1
1
’
1
1
’
5
’
8
’
W
/
G
R
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
G
R
A
D
E
P
O
I
N
T
G
R
A
D
E
P
O
I
N
T
N
O
T
E
S
:
(
1
)
T
R
A
N
S
I
T
I
O
N
F
R
O
M
E
X
I
S
T
I
N
G
T
O
T
.
S
.
N
O
.
1
-
L
-
S
T
A
.
1
3
+
0
0
.
0
0
T
O
-
L
-
S
T
A
.
1
4
+
3
5
.
0
0
(
2
)
T
R
A
N
S
I
T
I
O
N
F
R
O
M
T
.
S
.
N
O
.
1
T
O
E
X
I
S
T
I
N
G
-
L
-
S
T
A
.
1
7
+
1
5
.
0
0
T
O
-
L
-
S
T
A
.
1
8
+
5
0
.
0
0
3:1 MAX
-
L
-
6:1 VAR 5’8’ W/G
R
.08
-
L
-
S
T
A
.
1
5
+
8
3
.
8
8
T
O
-
L
-
S
T
A
.
1
6
+
4
1
.
1
3
-
L
-
S
T
A
.
1
4
+
3
5
.
0
0
T
O
-
L
-
S
T
A
.
1
5
+
8
3
.
8
8
(
B
E
G
I
N
B
R
I
D
G
E
)
-
L
-
S
T
A
.
1
6
+
4
1
.
1
3
(
E
N
D
B
R
I
D
G
E
)
T
O
-
L
-
S
T
A
.
1
7
+
1
5
.
0
0
7
"
@
C
B
R
I
D
G
E
L
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
2
A
-
1
B
-
4
6
8
1
P
A
V
E
M
E
N
T
D
E
S
I
G
N
6/2/9914-NOV-2014 07:19R:\Roadway\Proj\b4681_rdy_typ.dgn$$$$USERNAM E$$$$
(S
E
E
X
-S
E
C
T
IO
N
S
)
(SEE X-SECTIONS)
P
R
O
P
O
S
E
D
C
O
R
E
D
S
L
A
B
S
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
O
N
S
T
R
U
C
T
U
R
E
(
S
E
E
S
T
R
U
C
T
U
R
E
P
L
A
N
S
)
3
"
@
C
B
R
I
D
G
E
L
3
"
@
C
B
R
I
D
G
E
L
C
1
C
2
E
2
M
I
N
.
3
"
C
1
C
2
E
2
R
A
I
L
B
R
I
D
G
E
S
U
R
F
A
C
E
O
N
S
T
R
U
C
T
U
R
E
W
E
D
G
I
N
G
D
E
T
A
I
L
F
O
R
W
E
A
R
I
N
G
P A V E M E N T S C H E D U L ETC1EARTH MATERIAL E1 PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE SF9.5A,AT AN AVERAGE RATE OF 110 LBS. PER SQ. YD. PER 1" DEPTHOR GREATER THAN 1" IN DEPTH.TO BE PLACED IN LAYERS NOT LESS THAN 1" IN DEPTH PROP. APPROX. 2" ASPHALT CONCRETE SURFACE COURSE, TYPE SF9.5A,AT AN AVERAGE RATE OF 137.5 LBS. PER SQ. YD. IN EACH OF TWO LAYERSC2PROP. APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE B25.0B,AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD.E2 PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.0B, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH TO BE3" IN DEPTH.PLACED IN LAYERS NOT GREATER THAN 5" IN DEPTH OR LESS THAN
S
l
o
p
e
F
i
l
l
E
L
E
V
.
7
9
.
0
’
E
X
C
A
V
A
T
E
T
O
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
31-OCT-2014 11:26R:\Roadway\Proj\B4681_Rdy_psh.dgn$$$$USERNAME$$$$
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
4
B
-
4
6
8
1
-
L
-
+
5
0
4
0
’
1
3
0
’
-
L
-
+
0
0
4
0
’
3
0
’
B
L
-
1
0
2
1
(
S
T
R
U
C
T
U
R
E
’
S
P
A
Y
I
T
E
M
)
C
L
A
S
S
’
I
I
’
R
I
P
R
A
P
(S
T
R
U
C
T
U
R
E
’
S
P
A
Y
I
T
E
M
)
C
L
A
S
S
’
I
I
’
R
I
P
R
A
P
(
N
o
t
t
o
S
c
a
l
e
)
S
P
E
C
I
A
L
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
3:1
D
-
L
-
S
T
A
.
1
7
+
0
0
T
O
-
L
-
1
8
+
0
0
(
R
T
.
)
M
i
n
.
D
=
V
A
R
.
D
E
T
A
I
L
"
A
"
G
r
o
u
n
d
N
a
t
u
r
a
l
Flatter
4:1 or
S
E
E
D
E
T
A
I
L
"
A
"
S
P
E
C
I
A
L
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
8
:1
8
:
1
8
:1
8
:
1
BEGIN PROJECT B-4681-L- POT STA. 13+00.00
-
L
-
P
O
T
S
T
A
.
1
8
+
5
0
.
0
0
E
N
D
P
R
O
J
E
C
T
B
-
4
6
8
1
B
E
G
I
N
B
R
I
D
G
E
E
N
D
B
R
I
D
G
E
N
O
T
E
S
:
(
1
)
S
E
E
S
H
E
E
T
5
F
O
R
-
L
-
P
R
O
F
I
L
E
-L-11’11’
EXIST.
EXIST.
2 2’
G
R
A
U
3
5
0
T
L
-
3
G
R
A
U
3
5
0
T
L
-
3
G
R
A
U
3
5
0
T
L
-
3
G
R
A
U
3
5
0
T
L
-
3
1
3
5
’
T
A
P
E
R
+15
SKETCH SHOWING PAVEMENT IN RELATIONSHIP T
O
B
R
I
D
G
E
(NOT TO SCALE)TYPE-IIITYPE-IIITYPE-IIITYPE-III
1
3
5
’
T
A
P
E
R
+35
-
L
-
S
T
A
.
1
5
+
8
3
.
8
8
-
L
-
S
T
A
.
1
6
+
4
1
.
1
3
-L- STA. 15+72.88 BEGIN APPROACH SLAB -L- STA. 15+83.88 BEGIN BRIDGE-L-
S
T
A
.
1
6
+
4
1
.
1
3
EN
D
B
R
I
D
G
E
-L-
S
T
A
.
1
6
+
5
2
.
1
3
EN
D
A
P
P
R
O
A
C
H
S
L
A
B
22’30’-10"
8
:18
:
1
8:18:1 02 02
0202
0202
2 2’
(
2
)
S
E
E
S
H
E
E
T
S
S
-
1
T
O
S
-
F
O
R
S
T
R
U
C
T
U
R
E
P
L
A
N
S
B
R
I
D
G
E
1
1
9
LITTLE CONTENTNEA CREEK
PROPERTY LINE IS CL OF CREEK
PROPERTY LINE IS CL OF CREEK
E
X
I
S
T
I
N
G
R
/
W
EXISTING R/WEXISTING R/W 60.00’
W
O
O
D
S
E
I
P
S
O
I
L
60.00’
W
O
O
D
S
E
X
I
S
T
I
N
G
R
/
W
SOIL
T
T
D
B
:
4
8
7
P
G
:
3
7
0
C
A
R
O
L
Y
N
E
A
G
L
E
S
N
E
W
M
A
N
M
A
R
G
E
R
E
T
L
M
O
R
I
A
R
T
Y
&
W
O
O
D
S
W
O
O
D
S
W
O
O
D
S
W
O
O
D
S
D
B
:
2
3
3
6
P
G
:
2
7
6
R
O
B
E
R
T
L
D
I
X
O
N
B
L
A
N
C
H
E
M
D
I
X
O
N
B
M
-
2
0
2
R
O
B
E
R
T
L
D
I
X
O
N
B
L
A
N
C
H
E
M
D
I
X
O
N
D
B
:
2
3
3
6
P
G
:
2
7
6
1
7
.
5
’
B
S
T
S
R
1
5
3
1
E
A
G
L
E
C
R
O
S
S
R
D
.
SR 1531 EAGLE CROSS RD.CAROLYN EAGLES NEWMAN MARGERET L MORIARTY &DB: 487 PG: 370 PI Sta 13+17.87DL = 28.53’T = 14.27’R = 6,000.00’PI Sta 18+80.47DL = 46.18’T = 23.09’R = 20,000.00’10+00
15+00
20+00
-L- CURVE DATA
-
L
-
-L- POT Sta. 10+00.00
-
L
-
P
C
S
t
a
.
1
3
+
0
3
.
6
0
-
L
-
P
T
S
t
a
.
1
3
+
3
2
.
1
4
-
L
-
P
C
S
t
a
.
1
8
+
5
7
.
3
8
-
L
-
P
T
S
t
a
.
1
9
+
0
3
.
5
6
-
L
-
P
O
T
S
t
a
.
2
2
+
2
2
.
2
4
SE = NC
F
F
C
C
C
F
F
C
C
F
F
C
C
C
C
C
C
CC
C
N
A
D
8
3/ 9
5