HomeMy WebLinkAbout20221345 Ver 1_Wetland Impacts Table-2Revis ACE_20221022ONWASA NC-24 Hubert - Swansboro Water and Sewer Force Main Project: Jurisdictional Wat(
Wetland Impacts: All temporary; clear for construction access, trench for pipe installation; restore gra(
Wetland Wetland Temp Impact
impact # Label Impact Map Perm Wetland Type Forested Jurisdic Acres
W-1 W-PF Fig B T ditched pineflat No 404 0.024
W-2 W-PI-PJ Fig C T ditched pineflat No 404 0.112
W-3a W-PK-PM Fig D T ditched pineflat Yes 404 0.014
W-3b W-PK-PM Fig D T ditched pineflat Yes 404 0.055
W-4 W-PR Fig F T ditched pineflat Yes 404 0.165
W-5 W-PU Fig G T ditched pineflat No 404 0.027
Total ac 0.397
Stream Impacts: Temporary; Horizontal directional drill from upland to upland; no direct impact to strn
Stream Stream Temp Width,
impact # Label Impact Map Perm Stream Name Type Jurisdic feet
S-1 S-QE Fig K T Queens Creek Peren, TNW 10 / 404 30
?rs Impacts.
le and replant.
Latit Longit
34.7136 -77.3091
34.7108 -77.2984
34.7099 -77.2948
34.7096 -77.2932
34.7074 -77.2725
34.7094 -77.2637
aam channel.
Latit Longit
34.7129 -77.2226