Loading...
HomeMy WebLinkAboutWQCSD0144_Other Correspondence_20221021ACENTRAL C 4LINA COMMUNITY COLLEGE Chatham Mali Campus 764 west Street Pittsboro, NC 27312-8822 (919)542-6495 Harnett Mali Campus 1075 E. Cornelius llarnett Blvd. Lillington, NC 27546-7672 (910) 893-9101 Lee Maio Campus 1105 Kelly Dr. Sanford, NC 27330-9840 (919) 775-5401 Physical Plant Maintenance October 21, 2022 Vanessa E. Manuel, Assistant Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office, NC DEQ Subject: Compliance Evaluation Inspection Central Carolina Community College Collection System Permit No. WQCSD0144 Lee County Dear Ms. Manuel: This letter is in response to required action items identified by Mitch Hayes during his on- site inspection performed on September 27, 2022 at our Lee Main Campus. Action items are as follows (College responses are in red): 1. Currently there is no Grease Control Program. This program is required per 15 A NCAC 02T 00403 (a) (8). Please ensure the College adopts a Grease Control Program. The College is currently developing a Grease Control Program and it will be implemented by 11/30/2022. 2. There are 7 pump stations in the collection system. All pump stations were inspected. The following are a summary of the inspections: a) Large Animal PS — There is no identification signage. Temporary signage will be in place by 11/15/2022. Quotes are being obtained for permanent signage and will be installed when delivered from vendor. b) Keller Health Building PS — There is no identification signage. Temporary signage will be in place by 11/15/2022. Quotes are being obtained for permanent signage and will be installed when delivered from vendor. The visual alarm is behind a wall and is not visible to the public. . Please raise this alarm so that is visible to the public. Visual alarm Tight will he elevated above the wall by 11/15/2022. The on -site generator was not tested because power to the pump station could not be disconnected. A power down test was performed on 10/ 19/2022 and the backup generator started and ran as required. c) Lift # I Science Building — There is no identification signage. . Temporary signage will be in place by 11/15/2022. Quotes are being obtained for permanent signage and will be installed when delivered from vendor. CENTRAL CAROLINA COMMUNITY COLLEGE Chatham Main Campus 764 west Street Pittsboro, NC 27312-8822 (919) 542-6495 Harnett Main Campus 1075 E. Cornelius Harnett Blvd. Lillington, NC 27546-7672 (910)893-9101 Lee Male Campus 1105 Kelly Dr. Sanford. NC 27330-9840 (919) 775-5401 Physical Plant Maintenance e) Lift # 4 — The identification sticker was faded and needs to be replaced. Temporary signage will be in place by 11/15/2022. Quotes are being obtained for permanent signage and will be installed when delivered from vendor. f) Maintenance Building — There is no identification signage. Temporary signage will be in place by 11/15/2022. Quotes are being obtained for permanent signage and will be installed when delivered from vendor. Please call if you have questions or concerns. Sincerely, Ronnie Measamer Physical Plant Manager 1105 Kelly Drive Sanford, NC 27330 919.718.7409 (office) 919.770.9335 (cell) rmeas073@cccc.edu cc: Dr. Phillip Price Ben Rankin Mitch Hayes