Loading...
HomeMy WebLinkAboutNC0024244_Report_20221014.,KC Engineering Landscape Architecture Surveying October 14, 2022 Mr. Andrew Pitner Assistant Regional Supervisor, Mooresville NCDEQ— Division of Water Resources 610 E Center Avenue, Suite 301 Mooresville, NC 281115 Re: Quarterly Report — Fourth Quarter 2022 SOC WQ 519-007 Dear Mr. Pitner: On behalf of Albemarle, please accept this as a Quarterly Report for the subject Special Order by Consent. Below is a brief update on the SOC and associated projects: 1. Albemarle received funding through the Division of Water Infrastructure for $16,453,000 in funding for a major renovation to the Long Creek Wastewater Treatment Plant. The primary objective of the project is to transition the aeration process from the floating aerators over to diffused aeration. The project would also provide for 8,000,000 gallons of flow equalization volume to manage peak flow events. 2. The Engineering Report was submitted to the NCDEQ Wastewater Projects Unit on August 25, 2021. 3. A Request for Additional Information was received on November 9th, 2021. 4. The revised Engineering Report was submitted back to the Division of Water Infrastructure on December 8th, 2021. 5. The project cost has increased to $19,385,000. This was presented to the Albemarle City Council in December of 2021 and Council re -affirmed their commitment to the project. 6. The Final Engineering Report was submitted on April 18th, 2022. We received a verbal and email approval on August 8th, 2022. A hardcopy and electronic copy of the Engineering Report was delivered to the Division of Water Infrastructure on August 10tn 7. On June 22, 2022, the City submitted a revised SOC application with new proposed milestone completion dates. These dates reflect the scope and timeline of the proposed improvements at the WWTP, project CS370522-08. 8. The City is under contract with LKC Engineering to complete the design of the proposed upgrades at the Long Creek WWTP. Survey has been completed and design will begin in the coming weeks. 9. Albemarle's Council voted to utilize all funds obligated under CS370522-07 on gravity sewer rehabilitation. The Phase 3 project includes an investment of $6,156,000 on the rehabilitation of 24", 18", 12", and 8" gravity sewer along two major outfalls that are known sources of inflow and infiltration. 10. The project CS370522-07 is currently in the design phase and will be submitted to DWI for review February 2022. The project is expected to begin construction in the Summer of 2022 and take approximately nine months to complete. 11. The project design package for project CS370522-07 was submitted to DWI in early February. DWI completed its review and provided comments on April 15t, 2022. Final design package was LKC Engineering, PLLC, 140 Aqua Shed Court, Aberdeen, North Carolina 28315 PH: 910/420-1437 * FAX: 910/637-0096 * License No. P-1095 submitted on July 7th. We received Plans and Specifications Funding Approval from NCDWI on July 12tn 12. On June 22, 2022, the City submitted a revised SOC application with new proposed milestone completion dates. The proposed work for the collection system is slated to be completed by November 30, 2023. 13. The project is currently being advertised. Bid opening is scheduled for October 19th, 2022. Construction is expected to begin early 2023. If you have any questions, or if we may be of assistance, please do not hesitate to contact me by phone at (910) 420-1437 or by email at rob@LKCengineering.com. ery Best, ohn R. McIntyre, P.E.