Loading...
HomeMy WebLinkAbout20120040 Ver 1_ICA from NCDOT_20141202 North Carolina Department of Transportation Erosion and Sedimentation Contmol/Stormwater Report Roadside Environmental Unit Report Type iCAIPCN F-1 Routine Fv�pcw Immediate Corrective Action/Permit FV�|cA F-]scpAm Consultation Needed F�|cAsx1yx F�|cAsx2nd This project does not comply with the North Carolina Erosion and Sedimentation F�c|cA'emxO Control laws.Immediate Corrective Action is needed to resolve the situation to full compliance with the Law:(T15A:04B.0000). This project does not comply with the permit requirements for the project.Permit consultation is needed to resolve the situation to full compliance. Promect Information Project Number: aauuu a 1 Date o,Inspection: 12m1/2014 Evaluator: Barry Harrington Location: Bridge onUG 15/501 ovorCGX. Project Type: Contract County: mooRE Division: a TIP Number: o'asau Length o,Project: 0.40 Disturbed Acreage: u *om/Zone: m Trout Zone: m Promect Evaluation Installation of Maintenance sne'»|veneuu Plan Overall Project Length Section Description aMp'u o,aMp'u o,aMp'u Implementation Evaluation 0.10 The Entire Project 8 7 6 5 6 lGrading Scale: 10=Excellent 9= V. Good 8= Good 7=Fair 6-0:=immediate Corrective Action Needed ICA/PCN Comments: A PCN is being issued due to sediment loss and turbidity in stream channel.Art King, DEO was notified and planned to visit the site this afternoon. Please notify this office once the agencies have reviewed site and have made recommendations m restore site. Remarks and Recommendations: Talked to Tracy|ngo|d. P|while on the project and talked to John Olinger, DCE and Travis Morgan, RE in Division office. Project is out of compliance duo to failure to take all reasonable measures to prevent off-site sodimontadon,and failure to fv||mw approved plan.At time of review,the contractor was not utilizing proper BMP's in construction of stream restoration channel. Contractor had removed impervious dikes upstream and down stream and pump around and was completing removal of signifioava soil plug from a live stream channel.As indicated on last month's o.o.report and per permit conditions,"Channel/stream relocations shall be constructed in a dry work area and stabi|izod,and approved by DVVR prior to diverting water into the new ohanno|" Please note the following corrective actions: 1)Since majority of soil material has been removed from channel,need to stabilize remaining disturbed stream channel banks with oo|rfibor mauing,asap,ensuring matting is instaUod,as per detail. Before pn400t completion,ensure live stakes are driven into stream banks,as per detail. 2)Since constructed wetlands are disturbed and water has been turned into channel,recommend installing silt fence w/wattle outlets along stream channel,asap. Need to rip wetlands,as per spec.and seed with native seed mix and mulch. 3)Need to repair washes on existing stream banks caused by recent rainfall and remove sodimont,as per DVVO recommendations. Additional ooir fiber matting may bo needed adjacent to stream channel,depending on concentrated water flow from wetland tonew channel. 4)Ensure silt fence is installed around headwall area of new culvert and sood/matdismrbod areas on slope. AJso,need m address the following before project acceptance. -Y2-(US 1) appmx.sta 11+00 tosta 15+00 Lt.on-Y2'contractor has graded behind curb&gutter in this section. Permanent seed/mulch disturbed areas or temp.seed/mulch to meet NCGO1 seeding requirements.#~Gta 17+00 Lt.on-Y2'need tostabilize headwall area at outlet end of pipe and repair seed/mat weakly vegetated slope. 'L'need to mow weeds Lt.&Rt.of L'under and behind guardrail sections.#~Appmx.sta 14+00 Rt.ovorou|vort "epairsood/mat weakly vegetated area on slope.#Appmx.sta21+OOtosta23+OO Rt.need m repair sood/mu|oh/mat weakly vegetated areas approx. 5-10 feet behind guardrail and area on slope where slope drain was removed recently.Approx.sta18+OOmsta23+OOLt.contractor has constructed curb&gutter and is grading at this time.Once complete,seed/mat remaining disturbed areas. Ransdo|| Borrow site continue tomaintain skimmer basins/TRGD'sonsite. Need to final grade disturbed areas,esp.slopes and ponnanontsood/mu|oh NPDEG documentation was not reviewed.Continue to perform inspections on a weekly basis and after.5"rainfall event within 24 hrs.Also,ensure o.o.plans are updated and initialed on daily basis. 1212114 8:54 Page 1oxo Project will be reviewed again for compliance within 5 working days. 1212114 8:54 Page 2 of 2