Loading...
HomeMy WebLinkAbout20141198 Ver 1_Modifications_20141202 C.Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check Wetlands Streams - tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete 2a.2b.2c.2d.2e.2f. Wetland impactType of jurisdiction number –Type of impactType of wetlandForested(Corps - 404, 10Area of impact Permanent (P) or(if known)DWQ – non-404, other)(acres) Temporary (T) Bottomland Yes Corps Temporary for W5 P THardwood Forest1.3 Restoration No DWQ Wetland Bottomland Yes Corps Temporary for W4 P THardwood Forest0.75 Restoration No DWQ Wetland Yes Corps W P T No DWQ Yes Corps W P T No DWQ Yes Corps W P T No DWQ Yes Corps W P T No DWQ 2g 2.05 . Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including question for all stream sites impacted. 3g. 3a.3b.3c.3d.3e.3f. Impact Stream impactType of impactStream namePerennialType of jurisdictionAverage length number -(PER) orstream (Corps - 404, 10 (linear Permanent (P) orintermittentwidth DWQ – non-404, feet) Temporary (T)(INT)? (feet) other) PER Corps Temporary for S1 P TMcDowell Creek1512,750 Restoration INT DWQ PER Corps S2 P T INT DWQ PER Corps S3 P T INT DWQ PER Corps S4 P T INT DWQ PER Corps S5 P T INT DWQ PER Corps S6 P T INT DWQ 3h.12,750 Total stream and tributary impacts 3i. Comments: 5 Page of 11 PCN Form – Version 1.3 December 10, 2008 Version