Hi Hannah and Brad,
I wanted to “close the loop” on this small sediment loss at the subject bridge. We did go out and
review the area on October 4, 2022 (see attached photos from that day). When onsite, the
inspector noted that the loss was approximately 4’ x 3’ and several inches thick (I had not reported
an area originally).
Also, Hannah was able to review the project and this loss area on the 10/12/2022 “ride through” of
Brunswick projects. We discussed that the removal was sufficient.
Thanks for your patience while waiting to receive these follow-up photos. Let me know if you have
any questions.
Thanks,
Anneliese
Anneliese Westphal
Environmental Senior Specialist
Division 3
NCDOT- Division of Highways
910 341 2000 office
910 604 1330 mobile
910 675 0143 fax
awestphal@ncdot.gov
5501 Barbados Blvd
Castle Hayne, NC 28429-5647
From: Sprinkle, Hannah H <hannah.sprinkle@ncdenr.gov>
Sent: Tuesday, October 4, 2022 6:21 AM
To: Westphal, Anneliese <awestphal@ncdot.gov>; Shaver, Brad E SAW
<Brad.E.Shaver@usace.army.mil>
Cc: Farrell, Sean C <scfarrell@ncdot.gov>; Gingrich, Sophia E <segingrich@ncdot.gov>
Subject: RE: B-5540 (17BP.3.R.81) Brunswick Bridge 202 (Mulberry Branch) Sediment loss to
wetlands
Thanks for the report, I will add it to the file.
Hannah
From: Westphal, Anneliese <awestphal@ncdot.gov>
Sent: Monday, October 3, 2022 4:02 PM
To: Shaver, Brad E SAW <Brad.E.Shaver@usace.army.mil>; Sprinkle, Hannah H
<hannah.sprinkle@ncdenr.gov>
Cc: Farrell, Sean C <scfarrell@ncdot.gov>; Gingrich, Sophia E <segingrich@ncdot.gov>
Subject: B-5540 (17BP.3.R.81) Brunswick Bridge 202 (Mulberry Branch) Sediment loss to wetlands
Hi Hannah and Brad,
The assistant resident reported a sediment loss at the subject bridge at Sta. 13+75 -LDET- Rt. There
were two “5-gallon buckets” worth of sediment which overwhelmed a wattle. The sediment was
from the temporary fill operations. The sediment has been cleaned up with hand tools.
I understand that the project received 3.5 inches of rain. I plan to visit the project tomorrow to
confirm the clean-up. I plan to send a photo of the clean-up tomorrow.
Please let me know if you have any questions or need any other information.
Thank you,
Anneliese
Anneliese Westphal
Environmental Senior Specialist
Division 3
NCDOT- Division of Highways
910 341 2000 office
910 604 1330 mobile
910 675 0143 fax
awestphal@ncdot.gov
5501 Barbados Blvd
Castle Hayne, NC 28429-5647
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.