Loading...
HomeMy WebLinkAboutRE_ B-5540 (17BP.3.R.81) Brunswick Bridge 202 (Mulberry Branch) Sediment loss to wetlandsFrom:Westphal, Anneliese To:Sprinkle, Hannah H; Shaver, Brad E SAW Cc:Farrell, Sean C; Gingrich, Sophia E Subject:RE: B-5540 (17BP.3.R.81) Brunswick Bridge 202 (Mulberry Branch) Sediment loss to wetlands Date:Friday, October 21, 2022 12:42:00 PM Attachments:Brunswick Bridge 202 photo 1 20221004.jpeg Brunswick Bridge 202 photo 2 20221004.jpeg image001.png Hi Hannah and Brad, I wanted to “close the loop” on this small sediment loss at the subject bridge. We did go out and review the area on October 4, 2022 (see attached photos from that day). When onsite, the inspector noted that the loss was approximately 4’ x 3’ and several inches thick (I had not reported an area originally). Also, Hannah was able to review the project and this loss area on the 10/12/2022 “ride through” of Brunswick projects. We discussed that the removal was sufficient. Thanks for your patience while waiting to receive these follow-up photos. Let me know if you have any questions. Thanks, Anneliese Anneliese Westphal Environmental Senior Specialist Division 3 NCDOT- Division of Highways 910 341 2000 office 910 604 1330 mobile 910 675 0143 fax awestphal@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429-5647 From: Sprinkle, Hannah H <hannah.sprinkle@ncdenr.gov> Sent: Tuesday, October 4, 2022 6:21 AM To: Westphal, Anneliese <awestphal@ncdot.gov>; Shaver, Brad E SAW <Brad.E.Shaver@usace.army.mil> Cc: Farrell, Sean C <scfarrell@ncdot.gov>; Gingrich, Sophia E <segingrich@ncdot.gov> Subject: RE: B-5540 (17BP.3.R.81) Brunswick Bridge 202 (Mulberry Branch) Sediment loss to wetlands Thanks for the report, I will add it to the file. Hannah From: Westphal, Anneliese <awestphal@ncdot.gov> Sent: Monday, October 3, 2022 4:02 PM To: Shaver, Brad E SAW <Brad.E.Shaver@usace.army.mil>; Sprinkle, Hannah H <hannah.sprinkle@ncdenr.gov> Cc: Farrell, Sean C <scfarrell@ncdot.gov>; Gingrich, Sophia E <segingrich@ncdot.gov> Subject: B-5540 (17BP.3.R.81) Brunswick Bridge 202 (Mulberry Branch) Sediment loss to wetlands Hi Hannah and Brad, The assistant resident reported a sediment loss at the subject bridge at Sta. 13+75 -LDET- Rt. There were two “5-gallon buckets” worth of sediment which overwhelmed a wattle. The sediment was from the temporary fill operations. The sediment has been cleaned up with hand tools. I understand that the project received 3.5 inches of rain. I plan to visit the project tomorrow to confirm the clean-up. I plan to send a photo of the clean-up tomorrow. Please let me know if you have any questions or need any other information. Thank you, Anneliese Anneliese Westphal Environmental Senior Specialist Division 3 NCDOT- Division of Highways 910 341 2000 office 910 604 1330 mobile 910 675 0143 fax awestphal@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429-5647 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.