HomeMy WebLinkAboutNCC223631_ESC Approval Submitted_20221024DocuSign Envelope ID: A4ED889E-B7AA-4EC8-9684-5F431DF66799
ROY COOPER
Governor
EUZABETH S. BISER
Secretary
BRIAN WRENN
Diredor
NORTH CAROLINA
Environmental Quality
September 13, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
City of Charlotte
Attention: Joseph Wilson, Chief Engineer
5100 Brookshire Boulevard
Charlotte, North Carolina 28216
RE: Project Name: Mt. Holly Pumping Station & Stowe HWAPS
Project ID: MECKL-2022-054
Acres Approved: I I
County: Mecklenburg
City: Charlotte
Location: Belmeade Drive
River Basin: Catawba
Stream Classification: Other
Submitted By: Black &
Date Received by LQS:
Plan Type: Revised
Dear Mr. Wilson:
Veatch International Company
August 30, 2022
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire
three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit. After the form is reviewed and found to be complete, you will receive a
link with payment instructions for the $100 annual permit fee. After the fee is processed, you will
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted
for this project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCGOI . Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of
this project changes in the future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO I permit require that the following documentation be kept
on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
�;_
North Carolina Department of Environmental Quality Dillision of Energy, Mineral and Resources4E
Mooresville Reginal Office 1610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115
�'W' ;"
�m�a 704.663.1699
DocuSign Envelope ID: A4ED889E-B7AA-4EC8-9684-5F431 DF66799
Letter of Approval with Modifications
City of Charlotte
September 13, 2022
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Mt. Holly Pumping Station & Stowe HW/IPS
Project ID: MECKL-2022-054
County: Mecklenburg
Reviewed by: Kenny S. Llywelyn
Additional measure may be required around the clean water bypasses and during transition of
the phases of development.
North Carolina Department of Environmental Quality Division of Energy, Mineral and Resources
Mooresville Reginal Office 1610 East Center Avenue. Suite 301 Mooresville, North Carolina 28115
iNf(�unlxv�t u, t,rvao�,raa,� w�ty
704.663.1699