Loading...
HomeMy WebLinkAboutNCC213542_NOT Closeout Documents_20221017North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Jones Project: Wyse Fork Solar Farm, LLC River basin: Neuse Person financially responsible: Birch Creek Development, LLC - Ben Catt, Project #: JONES-2021-001 Manager Address: 130 Roberts Street, Asheville, NC 28801 1. Project Location: 6590 Wyse Fork Road, Dover Pictures: No 2. Weather and soil conditions: 85 degrees, cloudy, dry Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one was on -site. Title: Inspection report: Sent Report Date given/sent: August 30, 2022 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self - monitoring or self -inspections are required. The project is in compliance and released under the SPCA. The permittee must request termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) via a Notice of Termination (NOT). The NOT is available at https://edocs.deq.nc.gov/Forms/NCGO1- Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Scott Graboski Others present: Date of inspection: August 26, 2022 Time arriving on site: 10:30 AM Time leaving site: 10:50 AM cc: