Loading...
HomeMy WebLinkAboutNCC215990_NOT Closeout Documents_20221017SEDIMENTATION INSPECTION REPORT (City of Winston-Salem/Fors th Count Winston-Salem Field Operations Department Permit #: EN2100222 Erosion Control Division P.O. Box 2511 Date: 5-5-22 Winston-Salem, NC 27102 Report by: Favid Evans, CESSWI Revised 1-1-20 Phone: 1 336-399-9700 Project: HARVEST STONE SFD Location:2287 HARVEST STONE LANE 1. Pictures: ("x" One) Yes: No: X 2. Potential for NPDES Violation: ("x" One) Yes: No: X Describe: 3. Weather and soil conditions: SUN 78D Dry Initial inspection: ("x" One) Yes: No: X 4. Is site currently under notice of violation? ("x" One) Yes: No: X 5. Is the site in compliance with S.P.C.A. and rules? ("x" One) Yes: X No: If no, check violations below: 6. Violations: ("X" all applicable sections) ( )--- No approved plan, [UDO Sec. 8.4.6 (G) ; & G.S. 113A-57 (4) and 15A N.C.A.C4B.0107(e)] ( )--- Failure to follow approved plan, [UDO See.8.4.19 (A); & G.S. 113A-61.1] ( )--- Failure to submit revised plan, [UDO See. 8.4.17 (B) (5); & G.S. 113A-54.1(b) and 15A N.C.A.C. 4B.0118(a)] ( )--- Failure to provide adequate groundcover, [UDO See. 8.4.6 (D) (1) (b); & G.S. 113A-57(3); & 15A N.C.A.C. 413.0007(b) or 15A N.C.A.C.413.0124(e)] ( )--- Insufficient measures to retain Sediment on Site, [UDO Sec. 8.4.6 (D) (1) (a); & G.S. 113A-57(3)] ( )--- Failure to take all reasonable measures, [UDO Sec. 8.4.4 (B); & 15A N.C.A.C.4130105] ( )--- Inadequate buffer zone, [UDO See. 8.4.6 (A); & G.S. 113A-57(1)] ( )--- Graded Slopes and fills too Steep, [UDO Sec. 8.4.6 (B) (1) (a, b, e); & G.S. 113A-57(2) or 15A N.C.A.C. 413.0124(d)] Unprotected exposed slopes, [ UDO See. 8.4.6 (B) (1) (t); & G.S. 113A-57(2)] Failure to install and maintain erosion control measures, [UDO See. 8.4.12; & 15A N.C.A.C. 413.0113] Failure to keep current self -inspection records, [G.S. 113A-54.1 & 15A NCAC 0413. 0131] Other (describe): 7. Contact made with (name): KEVIN WALTON Title FOREMAN 8. Contact Method: phone # Q email (X—kwalton@glenwoodhomes.com) fax # ( ) letter ( ) person Q 9. Corrective actions needed: 10. Comments: (X) No devices in place ( ) Additional devices needed ( ) Devices need maintenance ( ) Devices in & functioning ( ) No seeding noted Q Partially seeded (X) Areas seeded (NO ) Off -site sedimentation (X) Project in compliance Home construction complete. Sites stable. No erosion problems. FINAL. 11. Others present: EMAIL Cc: Tom Quackenbush -tom@glenwoodhomes.co Office use only: Cityworks O Final O [white notebook] Excel O Financially responsible contact ( )